Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

CEM 100 EXAM QUESTIONS AND ANSWERS ALL CORRECT

Rating
-
Sold
-
Pages
8
Grade
A+
Uploaded on
02-12-2025
Written in
2025/2026

CEM 100 EXAM QUESTIONS AND ANSWERS ALL CORRECT

Institution
CEM 100
Course
CEM 100

Content preview

CEM 100 EXAM QUESTIONS AND
ANSWERS ALL CORRECT

The definition of a ___ asset is an asset that is expected to be sold, consumed, or
realized in cash during the NORMAL OPERATING CYCLE of the construction business
which, if not otherwise defined, is construed to be a 12 month cycle. - Answer-current

During the course of a PROJECT, a PM can hold a variety of differing types of
meetings. A meeting where a review of progress against schedule, identification of
PAIN POINTS & dependencies, & publicly calling team leaders to task most typically
takes place would be in a ___. - Answer-project planning meeting

An ADR Method whereby 1 panel member is selected by the contractor subject to
approval by the owner & the owner selects a 2nd panel member subject to approval by
the contractor w/ these 2 BOARD MEMBERS then choose a 3rd member for their panel
is the ___. - Answer-review board method

A combination of the probability of a defined threat/opportunity (likelihood) & the
magnitude of the CONSEQUENCES of the occurrence (IMPACT) defines a __. -
Answer-risk index

DRAWINGS prepared by the construction contractor throughout the entire course of
construction of the project, whose purpose is to depict the ACTUAL manner, location, &
dimensions of all work as actually performed on project are known as ___. - Answer-as-
built drawings

Architect-engineers in order to minimize their liability regarding shop drawings, many A-
E's NO LONGER USE THE WORD ____ when indicating that the shop drawings have
been reviewed & found satisfactory. - Answer-approved

Concerning ARBITRATION as a method for settling construction contract disputes,
rules for conducting construction ARBITRATIONS have been commonly promulgated
by the ___. - Answer-American Arbitration Association (AAA)

Concerning a WBS, a WBS allows HIERARCHICAL build up of costs & schedule
therefore cost & schedule can be reported ____ of the WBS. - Answer-@ any level

, Concerning alternative dispute resolution (ADR) methods, the ADR method that is
typically 1st used on a construction dispute (1ST STEP between owner & contractor) is
the ____. - Answer-mediation method

Concerning materials management, a series of follow-up actions referred to as ___ are
taken after each materials order is placed, to keep the supplier constantly reminded of
the importance of timely DELIVERY. - Answer-expediting

The Lowest Level of the WBS is the ___. The ____ contains a LISTS OF TASKS
PERFORMED that form the basis for the schedule. - Answer-work package (WP)

The __________ is responsible for the DAY-TO-DAY direction of PROJECT operations
on the construction site along with duties such as SUPERVISING and directing the
trades, coordinating subcontractors, working closely with the owner's or architect-
engineer's field representative, and checking daily production. - Answer-project
superintendent

alTERNATIVE dispute resolution (ADR) methods include all of the following except
__________. - Answer-court trials

First espoused by Edwards Deming and later by his proteges Juran, Crosby, and others
__________ can be summarized as a management approach to long-term success
through CUSTOMER SATISFACTION. In a __________ effort, all members of an
organization commit to and participate in, improving processes, PRODUCTS &
SERVICES, and the culture in which they work. - Answer-total quality management


Concerning a construction contract dispute where there is a CONFLICT BETWEEN
DRAWING & SPECIFICATION & interpretations hierarchy is not spelled out anywhere
else in the contract documents, from construction industry past practice, the governing
doc. would be the ___. - Answer-specifications

___ are used as a penalty for LATE COMPLETION & is used in LIEU of a determination
of actual DAMAGES suffered by the owner. - Answer-liquidated damages

In order to have a VALID CONTRACT, IT MUST HAVE ALL of the following essential
elements except ___.
-THESE ARE ALL - Answer-- offer & acceptance of the offer (effectively agreement)
- the contract must not be contrary to the public policy
- a price paid (not necessarily money)
- there must be genuineness, proper understanding & consent of what is involved by the
parties to the terms of the contract

In construction contracts, the typical WARRANTY PERIOD is ___. - Answer-1 year

In the enforcement of construction contracts, ___ or more technically referred to as the
equitable remedy of ___ is in SPECIAL circumstances where by the court may order the

Written for

Institution
CEM 100
Course
CEM 100

Document information

Uploaded on
December 2, 2025
Number of pages
8
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$13.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF


Also available in package deal

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Perfectscorer Chamberlain College Of Nursng
Follow You need to be logged in order to follow users or courses
Sold
499
Member since
3 year
Number of followers
355
Documents
9424
Last sold
4 days ago

Our store offers a wide selection of materials on various subjects and difficulty levels, created by experienced teachers. We specialize on NURSING,WGU,ACLS USMLE,TNCC,PMHNP,ATI and other major courses, Updated Exam, Study Guides and Test banks. If you don't find any document you are looking for in this store contact us and we will fetch it for you in minutes, we love impressing our clients with our quality work and we are very punctual on deadlines. Please go through the sets description appropriately before any purchase and leave a review after purchasing so as to make sure our customers are 100% satisfied. I WISH YOU SUCCESS IN YOUR EDUCATION JOURNEY

Read more Read less
3.6

75 reviews

5
27
4
15
3
18
2
5
1
10

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions