Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

C 54 EXAM 2025 | CERAMIC AND MOSAIC TILE CONTRACTORS LICENSE EXAM | ALL QUESTIONS AND CORRECT ANSWERS | GRADED A+ | VERIFIED ANSWERS | LATEST EXAM QUESTIONS WITH DETAILED VERIFIED ANSWERS

Rating
-
Sold
-
Pages
21
Grade
A+
Uploaded on
03-12-2025
Written in
2025/2026

C 54 EXAM 2025 | CERAMIC AND MOSAIC TILE CONTRACTORS LICENSE EXAM | ALL QUESTIONS AND CORRECT ANSWERS | GRADED A+ | VERIFIED ANSWERS | LATEST EXAM QUESTIONS WITH DETAILED VERIFIED ANSWERS C 54 EXAM 2025 | CERAMIC AND MOSAIC TILE CONTRACTORS LICENSE EXAM | ALL QUESTIONS AND CORRECT ANSWERS | GRADED A+ | VERIFIED ANSWERS | LATEST EXAM QUESTIONS WITH DETAILED VERIFIED ANSWERS C 54 EXAM 2025 | CERAMIC AND MOSAIC TILE CONTRACTORS LICENSE EXAM | ALL QUESTIONS AND CORRECT ANSWERS | GRADED A+ | VERIFIED ANSWERS | LATEST EXAM QUESTIONS WITH DETAILED VERIFIED ANSWERS C 54 EXAM 2025 | CERAMIC AND MOSAIC TILE CONTRACTORS LICENSE EXAM | ALL QUESTIONS AND CORRECT ANSWERS | GRADED A+ | VERIFIED ANSWERS | LATEST EXAM QUESTIONS WITH DETAILED VERIFIED ANSWERS C 54 EXAM 2025 | CERAMIC AND MOSAIC TILE CONTRACTORS LICENSE EXAM | ALL QUESTIONS AND CORRECT ANSWERS | GRADED A+ | VERIFIED ANSWERS | LATEST EXAM QUESTIONS WITH DETAILED VERIFIED ANSWERS C 54 EXAM 2025 | CERAMIC AND MOSAIC TILE CONTRACTORS LICENSE EXAM | ALL QUESTIONS AND CORRECT ANSWERS | GRADED A+ | VERIFIED ANSWERS | LATEST EXAM QUESTIONS WITH DETAILED VERIFIED ANSWERS C 54 EXAM 2025 | CERAMIC AND MOSAIC TILE CONTRACTORS LICENSE EXAM | ALL QUESTIONS AND CORRECT ANSWERS | GRADED A+ | VERIFIED ANSWERS | LATEST EXAM QUESTIONS WITH DETAILED VERIFIED ANSWERS

Show more Read less
Institution
C 54
Course
C 54

Content preview

Page | 1



C 54 EXAM 2025 | CERAMIC AND MOSAIC
TILE CONTRACTORS LICENSE EXAM |
ALL QUESTIONS AND CORRECT
ANSWERS | GRADED A+ | VERIFIED
ANSWERS | LATEST EXAM QUESTIONS
WITH DETAILED VERIFIED ANSWERS
A 90° corner is specified when installing a sink, the deck lath should be
held away from the wall: Ans: 1 inches

A tile cove is specified when installing a sink, the deck lath should be held
away from the wall: Ans: 3 inches

A 90° corner is specified when installing a sink, the cabinet should be (-
)wider than the sink from front to back. Ans: 2 inches

A tile cove is specified when installing a sink, the cabinet should be (-)
wider than the sink from front Ans: 4 inches

The layout should start with (-) , on a straight- run drain board with a
diagonal deck: Ans: Full diagonals at the cap and at the sink

On a straight-run drainboard with a straight deck, layout should start
with: Ans: a full tile on the cap

When installing a Pullman without using trim shapes, how large of a joint
should be left around it? Ans: 1/16 inch

The V-cap is (-) backed with mortar. Ans: fully

What is the maximum depth of the mortar, when using a V-cap apron?
Ans: 1 inch

When using V-cap apron, what is the minimum depth of mortar? Ans:
3/4 in

, Page | 2

The bottom of V-cap should be set (-) in a countertop from finish floor:
Ans: 34 5/8 inches

The tile-setter should (-) when installing felt in a sink cabinet cavity.
Ans: lap the felt into the sink cavity

Before cleaning the wall tile after grouting, how long should you wait?
Ans: 72 hours

When cleaning tile, which of the following statements is NOT true? Ans:
grout requires separate scrubbing

When installing a tiled-in Pullman, what is the reveal between the trim
and edge of the basin? Ans: 1/8 inch

You should wait (-) before cleaning a quarry floor after laying it: Ans: 72
hours

What should you have the tile-setter do after they have completed one
wall and were about to start the other? Ans: wait 48 hours before
starting the opposite (back) side of the same wall

You have two apprentices to clean a tile floor; one has an acid product
and the other has a stiff brush.You should tell them: Ans: to use neutral
soap

What do you NOT do when you are in charge of cleaning on a tile floor
job? Ans: as floor is being tiled, stack all items in a neat pile

Mike had a concrete floor that he wanted to tile. He cleaned the floor and
laid tile with thin set base. Is this correct? Ans: No it should have a
mortar bed

Corners in a shower receptor should be reinforced by (-) before installing
tile. Ans: 50 lb. tear-strength woven glass fiber webbing hot mopped in
place and extending 4 inches in all directions from each corner

The best method of waterproofing a shower is: Ans: 3 layers of 15 lb.
felt with hot mopping

, Page | 3

The total thickness of the mortar bed should never be less than (-) at any
point when you are installing shower receptors. Ans: 1 3/4 inches

Organic mastic should NOT be used for: Ans: tile in a shower

What is the minimum drain for a shower floor? Ans: 1/4 inch per foot

What mortar mix ratio should be used for a shower (pipe) wall? Ans: 1:4

When the plug is removed for a tile-lined shower receptor: Ans: all of
the test water must drain out by gravity through the weep holes

How should you clean glass mosaic tile (other than small tile mosaic)?
Ans: a soft brush; after it is set, scrub with an abrasive nylon pad and
give a light acid cleaning (1 part muriatic acid: 20 parts water).

What should the tile-setting first do, when installing a mosaic (glass or
marble) floor? Ans: lay out the mosaic at a different site, keeping each
sheet as tight as possible, and starting with sheet No. 1

When laying a ceramic mosaic tile floor, the tile-setter should: Ans:
begin at the intersection of the two LONGEST right angle walls

What should you do when using a kneeling board to lay mosaic tile?
Ans: use kneeling board not less than 6 inches or more than 12 inches
wide

Is this a correct procedure, if a dash coat for a mosaic tile was made
using 1 part sand and 1 part Portland cement? Ans: No: it needs more
sand

The width of an expansion joint in mosaic tile should be: Ans: 1/4 inch

The box screed method is used for mosaic tile installations to: Ans:
insure uniform thickness for mosaics: spread a fine mortar on the back of
the sheets and rod off lightly

Which of the following is NOT correct, when bending wire in a mortar
ceiling? Ans: bend the edges down on the wall

Written for

Institution
C 54
Course
C 54

Document information

Uploaded on
December 3, 2025
Number of pages
21
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$13.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Ivie Stuvia
Follow You need to be logged in order to follow users or courses
Sold
31
Member since
1 year
Number of followers
1
Documents
8539
Last sold
1 month ago

3.4

7 reviews

5
2
4
2
3
1
2
1
1
1

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions