Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

EXAM 3 CHAO WANG CM 2113 EXAM WITH COMPLETE QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+|BRAND NEW VERSION!!

Beoordeling
-
Verkocht
-
Pagina's
5
Cijfer
A+
Geüpload op
09-12-2025
Geschreven in
2025/2026

EXAM 3 CHAO WANG CM 2113 EXAM WITH COMPLETE QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+|BRAND NEW VERSION!!

Instelling
Vak

Voorbeeld van de inhoud

EXAM 3 CHAO WANG CM 2113 EXAM WITH COMPLETE
QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED
ANSWERS) |ALREADY GRADED A+|BRAND NEW VERSION!!


The ________________ is very effective for side-casting material, particularly for backfilling or making
sidehill cuts. - CORRECT ANSWERS-Angle Blade



__________ is a technique whereby the blade end spillage from the first pass or the sidewalls from
previous cuts are used to hold the material in front of the dozer blade on subsequent passes. -
CORRECT ANSWERS-Slot dozing


Which of the following factors need to be considered when selecting a proper scraper for your project? -
CORRECT ANSWERS-Scraper configuration, volume of material and job size


Dozer is good for applications of less than 300ft short haul, and scraper is good for applications of up to
3,000ft medium haul. - CORRECT ANSWERS-True



An advantage of a crawler dozer as compared with a wheel-type dozer is higher speed. - CORRECT
ANSWERS-False


Which of the following work tasks can be performed by a dozer? - CORRECT ANSWERS-
Spreading, Striping and Backfilling



A contractor has a project involving the construction of a small manufacturing plant. The contractor has
selected a borrow site and has decided to use 27-cubic yard dump trucks to haul the needed fill material.
The contractor has decided to use a hydraulic excavator with a shovel attachment to load the trucks. The
excavator has expected productivity as 422cy/hr at 100% efficiency, and the truck cycle time excluding
loading is 0.48hr. The job site operation efficiency is assumed as 0.8. Please answer the next two
questions.

What is the expected fleet production if only 6 trucks are available to the fleet? - CORRECT
ANSWERS-238 cy/hr


Buckets of loaders are rated in both heaped and struck capacities. _________________ is based on the
SAE standard of a 2:1 material repose angle. - CORRECT ANSWERS-Heaped capacity

, Which of the following is a job condition that could affect the operator's job efficiency? - CORRECT
ANSWERS-Surface and weather conditions


Fill factor is the ratio of the actual loose volume of material in the bucket compared to the bucket's
rated-heaped capacity. It varies based on the type of material being handled and the type of excavator. -
CORRECT ANSWERS-True


A contractor has decided to use a dragline to excavate a ditch to drain stormwater runoff from her
construction site. The material to be excavated is a light moist clay weighing 2,000 pounds per bank
cubic yard with a swell of 18% and shrinkage of 25%. Given the density of the material to be loaded, the
contractor has determined that the largest heavy-duty dragline bucket that can be safely mounted on
the crane has a rated capacity of 2.5 cubic yards. We assume that we know the average depth of the dig
is 11.9 feet and the average angle of the swing is 75 degrees, and the contractor plans to operate the
machine about 48 minutes per hour. Please answer this question based on the following given tables. -
CORRECT ANSWERS-305 BCY/hr


What is the optimum depth of cut for this machine based on the given scenario? - CORRECT
ANSWERS-8.5ft


What is the swing-depth factor for this machine based on the given scenario? - CORRECT
ANSWERS-1.00


What is the job efficiency for this machine based on the given scenario? - CORRECT
ANSWERS-.8


What is the actual production rate for this machine based on the given scenario? - CORRECT
ANSWERS-244 BCY/hr


Which of the following is not a disadvantage of a crawler crane? - CORRECT ANSWERS-limited
capacity



Using Fig. 17.13, select the minimum-length boom required to hoist a load of 80,000 lb from a truck at
ground level and place it on a platform 76 ft above the ground. The minimum allowable vertical distance

Geschreven voor

Vak

Documentinformatie

Geüpload op
9 december 2025
Aantal pagina's
5
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$26.49
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper
Seller avatar
september10

Maak kennis met de verkoper

Seller avatar
september10 Teachme2-tutor
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
1
Lid sinds
1 jaar
Aantal volgers
0
Documenten
690
Laatst verkocht
1 maand geleden
september 10

AFTER MULTIPLE TONES OF RESEARCH THE MAIN AIM IS TO OFFER NOTHING BUT THE BEST FOR THE LEANERS IN A WORLD WHERE WISDOM IS VALUED THESE TESTS ARE A CONFIRMATION OF SUCCESS.THE RESOURSES ARE THOUGHTFULLY PREPARED TO SUPPORT YOU LEARNING JOURNEY AND MAKE YOUR STUDIES AND EXAM PREPARATION SMOOTH AND EFFECTIVE.

0.0

0 beoordelingen

5
0
4
0
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen