Question: 7. In the event of a change in the placement of air-conditioning ducts in a
boardroom, which of the following documents should the AV integrator submit first?
A. Punch/snag/problem list
B. Change order (CO)
C. Request for change (RFC)
D. Request for information (RFI) - CORRECT ANS✔✔D. Request for information (RFI)
Question: 8. Which of the following documents should an AV integrator submit in the event
that a manufacturer has discontinued a projector model?
A. Letter of transmittal
B. Progress report (PR)
1
SUCCESS!
,Page 2 of 100
C. Request for change (RFC)
D. Construction change directive (CCD) - CORRECT ANS✔✔C. Request for change (RFC)
Question: 9. The ANSI/AVIXA 2M-2010 Standard Guide for Audiovisual Systems Design
Coordination Processes lays out a procedure for determining the _
A. functions and features that are required to support a given set of tasks
B. project communication that needs to take place on a given project
C. room types that are suitable for a given set of client needs
D. verification tests that should be performed during a given project - CORRECT ANS✔✔B.
project communication that needs to take place on a given project
Q:1. Conducing Pre installation Activities/Evaluate Overall Facility Condia During a technical site
survey for an installation with a display, informaion gathered should include:
A. Color of the walls
2
SUCCESS!
,Page 3 of 100
B. Receptionist name and phone number
C. Ceiling height and construction method
D. Rules governing use of the freight elevator - CORRECT ANS✔✔C. Ceiling height and
construction method
Question: [Conducting Site Rough-In/ First-Fix/Mount Substructure]
When mounting a 34kg (75lb) projector with a 7kg (15lb) mount, the substructure should be
able to support a minimum weight of:
A. 82kg (1801b)
B. 41kg (90lb)
C. 204kg (450lb)
D. 122kg (270lb) - CORRECT ANS✔✔C. 204kg (450lb)
Question: 3. [Installing Audiovisual Systems/Prepare Audiovisual Rack]
Where should you place the wireless microphone receiver antenna in a rack assembly?
3
SUCCESS!
, Page 4 of 100
A. Line of sight to the transmitter
B. Inside the transmitter room
C. In the front of the rack
D. At the rear of the rack - CORRECT ANS✔✔C. In the front of the rack
Question: 4. [Performing Systems Closeout/Provide Training on Equipment Operation]
When training a customer on the operation of a touch-panel interface, an example that the GUI
is a good design that meets the customer's needs is:
A. The customer can easily use the touch panel with little explanation
B. The customer requires intensive training on how to use the touch panel
C. The customer thinks the panel looks cool
D. The customer wants only a few changes - CORRECT ANS✔✔A. The customer can easily use
the touch panel with little explanation
4
SUCCESS!
AVIXA CTS-I EXAM QUESTIONS AND CORRECT
VERIFIED ANSWERS LATEST UPDATE JUST
RELEASED THIS YEAR
Question: 7. In the event of a change in the placement of air-conditioning ducts in a
boardroom, which of the following documents should the AV integrator submit first?
A. Punch/snag/problem list
B. Change order (CO)
C. Request for change (RFC)
D. Request for information (RFI) - CORRECT ANS✔✔D. Request for information (RFI)
Question: 8. Which of the following documents should an AV integrator submit in the event
that a manufacturer has discontinued a projector model?
A. Letter of transmittal
B. Progress report (PR)
1
SUCCESS!
,Page 2 of 100
C. Request for change (RFC)
D. Construction change directive (CCD) - CORRECT ANS✔✔C. Request for change (RFC)
Question: 9. The ANSI/AVIXA 2M-2010 Standard Guide for Audiovisual Systems Design
Coordination Processes lays out a procedure for determining the _
A. functions and features that are required to support a given set of tasks
B. project communication that needs to take place on a given project
C. room types that are suitable for a given set of client needs
D. verification tests that should be performed during a given project - CORRECT ANS✔✔B.
project communication that needs to take place on a given project
Q:1. Conducing Pre installation Activities/Evaluate Overall Facility Condia During a technical site
survey for an installation with a display, informaion gathered should include:
A. Color of the walls
2
SUCCESS!
,Page 3 of 100
B. Receptionist name and phone number
C. Ceiling height and construction method
D. Rules governing use of the freight elevator - CORRECT ANS✔✔C. Ceiling height and
construction method
Question: [Conducting Site Rough-In/ First-Fix/Mount Substructure]
When mounting a 34kg (75lb) projector with a 7kg (15lb) mount, the substructure should be
able to support a minimum weight of:
A. 82kg (1801b)
B. 41kg (90lb)
C. 204kg (450lb)
D. 122kg (270lb) - CORRECT ANS✔✔C. 204kg (450lb)
Question: 3. [Installing Audiovisual Systems/Prepare Audiovisual Rack]
Where should you place the wireless microphone receiver antenna in a rack assembly?
3
SUCCESS!
, Page 4 of 100
A. Line of sight to the transmitter
B. Inside the transmitter room
C. In the front of the rack
D. At the rear of the rack - CORRECT ANS✔✔C. In the front of the rack
Question: 4. [Performing Systems Closeout/Provide Training on Equipment Operation]
When training a customer on the operation of a touch-panel interface, an example that the GUI
is a good design that meets the customer's needs is:
A. The customer can easily use the touch panel with little explanation
B. The customer requires intensive training on how to use the touch panel
C. The customer thinks the panel looks cool
D. The customer wants only a few changes - CORRECT ANS✔✔A. The customer can easily use
the touch panel with little explanation