Terms in this set (45)
1) A major function of the True
DOT is to carry out
Construction and
Reconstruction programs
to provide the public with
adequate transportation
service.
,1) "Check Levels" must be C. Final measurements for payment will be from the
run at the start of a same base elevations as the original survey and the
construction project to construction will be done to design elevations.
assure that:
A. Liquid Bituminous
Material in Asphalt
distributors is measured
accurately.
B. Construction will be
done to Contractor's
elevation.
C. Final measurements for
payment will be from the
same base elevations as
the original survey and the
construction will be done
to design elevations.
D. Paver screeds are
calibrated to lay down
pavement of uniform
thickness.
E. None of the above.
1) Multiple choice. Which E. Answer B & D
of the following is NOT
officially considered to be
a "Contract Document"?
A. Supplemental
Agreements and Work
Orders.
B. Notebooks and
Estimates Procedure
Manual.
C. Standard Specifications.
D. Construction Manual.
E. Answers B &D
, 1) To document D. Computation Book.
computations and
summarize quantities,
preprinted forms are
available for use in the:
A. Construction manual
B. Final Estimates
Checklist.
C. Special provisions.
D. Computation Book.
E. None of the above.
1) True or False. When True
checked and verified, final
estimates serve as the
basis for Final Payment.
2) In which Manuals are E. Both B and C
the procedures for
running check levels and
cross sections described?
A. Review and
Administration Manual
B. Preparation &
Documentation manual (P
& D M)
C. Location & Survey
Manual
D. CPAM
E. Both B and C