Save
Terms in this set (90)
1 AC = 43,560 SF 144 in. 2 = Conversions to Remember
1 SF 9 SF = 1 SY
All field measurements for C. With sketches in the field records and referenced
odd areas should be to the Final As-Built Plans Summary Sheet pertaining
clearly recorded: A. In the to the pay item.
Miscellaneous
Construction Programs
Manual. B. With sketches
on a piece of paper C.
With sketches in the field
records and referenced to
the Final As-Built Plans
Summary Sheet pertaining
to the pay item. D. All the
above. E. None of the
above.
,Any unresolved claims of B. Should be identified and clearly described at the
the contractor that might time the final estimate is submitted
affect final payment: A.
Should not be identified
until after the project has
closed B. Should be
identified and clearly
described at the time the
final estimate is submitted
C. Should be identified
and described during the
pre-construction
conference D. Should be
identified and clearly
described at the job site E.
None of the above
Area of a circle formula Circle Area = π x r2
Area of a sector of a circle Area of Sector = π r 2 x angle° 360°
The area of irregular True
shapes can be computed
by the method of Latitude
and departure. A. True B.
False
Calculate Radian of Circle Radians = Arc/Radius
Centerline Length =
(Sector Angle°)(π)(r)/ 180°
Circumference of a circle Circumference(c) = π x Diameter(D)
, Contract Change
Documentation. Contract
changes could be made
through the following
documents: o
Supplemental Agreements
o Unilateral Directed Extra
Work o Contractor's Claim
o Contingency
Supplemental Agreement
o Work Order for
unforeseen Additional
Work o Cost Savings
Initiative Proposal (CSIP)
This form is used to record the quantity for each truck
as materials are delivered to the project. An example
DAILY REPORT OF TRUCK
of this would be borrow excavation where it is
MEASURED MATERIAL
measured by the cubic yard based on the volume per
truck and the number of trucks.
These standards are made available for Design,
Construction, Maintenance, and Utility operations on
DESIGN STANDARDS the State Highway System. This booklet provides
guidelines and technical drawings for design and
Construction personnel.
The document used to False
account for all variations
of $10,000.00 or greater
between the Original and
the Final Quantities is
called the Variation