Solutions b
Installed on select CRJ200 and ALL CRJ900 A/C delivers studio quality safety briefings to passengers - CORRECT
b b b b b b b b b b b b b b b b
ANSWER✔✔Public Briefing System (PBS600)
b b b b
Position - Determine FWD & AFT A b b b b b b
Assist - Each other b b b b
Information - Pertinent to the flight b b b b b b
Special - information concerning passengers - CORRECT ANSWER✔✔P
b b b b b b b
A
I
R
S
Face to Face - CORRECT ANSWER✔✔How should the flight attendant inform the CA that the cabin is secure
b b b b b b b b b b b b b b b b b
and ready for pushback?
b b b b
FWD FA - CORRECT ANSWER✔✔Which FA tells the captain that the cabin is secure and ready for pushback?
b b b b b b b b b b b b b b b b b
Before the FD is closed and after MCD is closed - CORRECT ANSWER✔✔When does the FA let the captain know
b b b b b b b b b b b b b b b b b b b
the cabin is secure and ready for pushback?
b b b b b b b b
, Double Hi Chime - CORRECT ANSWER✔✔What chime do you hear when you are ascending OR descending
b b b b b b b b b b b b b b b
through 10,000 ft
b b b
Single Hi Lo Chime - CORRECT ANSWER✔✔What chime do you hear when hear is extended for landing?
b b b b b b b b b b b b b b b b
Anytime you get up - CORRECT ANSWER✔✔When should you stow your jump seat?
b b b b b b b b b b b b
45 minutes prior to departure - CORRECT ANSWER✔✔When is a CSA brief conducted?
b b b b b b b b b b b b
Bag strategy b
Review Specials b
ID scan b
Expected boarding/door closure b b
Furnish gate phone #/Flight Family App - CORRECT ANSWER✔✔B
b b b b b b b b
R
I
E
F
prior to pushback - CORRECT ANSWER✔✔Passenger boarding may begin prior to crew briefing, but crew
b b b b b b b b b b b b b b
briefing should be completed...
b b b b
• 1st flight of the day for the A/C
b b b b b b b b
• 1st flight of the day for FA
b b b b b b b
• Any time there is an A/C change
b b b b b b b