FDNY G-60 Exam Questions and Answers
Save
Terms in this set (53)
Sprinkler system must Place damp cloth guards on individual sprinkler heads
NOT be shut off or
impaired while hot work is
performed
The person conducting CANNOT
the fire watch ______ have
other duties
A portable fire 2-A:20-B:C///30
extinguisher with a rating
of _________ is required and
should be within ____ feet
travel distance hot work
area
For ROOFING 3-A:40-B:C
OPERATIONS, a portable
fire extinguisher with a
minimum rating of ______ is
required
Fire watch on floors below required
is ______
, The fire watch must 30
continue for a minimum of
____ minutes after the hot
work is done
For any CNG or LPG torch 30 min///1 hour
operations, the first
inspection shall be
conducted ___ minutes
after completion. The
second inspection shall be
conducted _______ after
completion of torch
operations.
The fire guard or fire The report must be made available and maintained on
watch personnel must the premises for a minimum of 48 hours after the work
complete a signed is complete.
inspection report and it
must be submitted to and
retained by the person in
charge of the torch
operations.
Most common fuel gasses LPG (butane, propane) natural gas (methane) (either
used in blowtorches are CNG or piped natural gasses)
______
Soldering and brazing 840 degrees F
temperatures are
typically______
Oxy-acetylene generates 6000 degrees F
the highest temperature
which can reach up to _____
Save
Terms in this set (53)
Sprinkler system must Place damp cloth guards on individual sprinkler heads
NOT be shut off or
impaired while hot work is
performed
The person conducting CANNOT
the fire watch ______ have
other duties
A portable fire 2-A:20-B:C///30
extinguisher with a rating
of _________ is required and
should be within ____ feet
travel distance hot work
area
For ROOFING 3-A:40-B:C
OPERATIONS, a portable
fire extinguisher with a
minimum rating of ______ is
required
Fire watch on floors below required
is ______
, The fire watch must 30
continue for a minimum of
____ minutes after the hot
work is done
For any CNG or LPG torch 30 min///1 hour
operations, the first
inspection shall be
conducted ___ minutes
after completion. The
second inspection shall be
conducted _______ after
completion of torch
operations.
The fire guard or fire The report must be made available and maintained on
watch personnel must the premises for a minimum of 48 hours after the work
complete a signed is complete.
inspection report and it
must be submitted to and
retained by the person in
charge of the torch
operations.
Most common fuel gasses LPG (butane, propane) natural gas (methane) (either
used in blowtorches are CNG or piped natural gasses)
______
Soldering and brazing 840 degrees F
temperatures are
typically______
Oxy-acetylene generates 6000 degrees F
the highest temperature
which can reach up to _____