VA DEQ ESC INSPECTOR EXAM
VESCPvf-vfanswer--VirginiavfErosionvfandvfSedimentvfControlvfProgram
-vfAdministeredvfbyvfcounties/citiesvf(must),vftownsvf(may)
-vfMUSTvfBEvfAPPROVED
MinimumvfStandardvf1vf-vfanswer--Stabilization
permanentvforvftemporaryvfsoilvfstabilizationvfshallvfbevfappliedvftovfdenudedvfareasvfwithinv
fsevenvfdaysvfaftervffinalvfgradevfisvfreachedvfonvfanyvfportionvfofvfthevfsite;vftemporaryvfsoilvf
stabilizationvfshallvfbevfappliedvfwithinvfsevenvfdaysvftovfdenudedvfareasvfthatvfmayvfnotvfbev
fatvffinalvfgradevfbutvfwillvfremainvfdormantvfforvflongervfthanvf14vfdays;vfpermanentvfstabiliz
ationvfshallvfbevfappliedvftovfareasvfthatvfarevftovfbevfleftvfdormantvfforvfmorevfthanvfonevfyear
SitevfNOTvfatvfFinalvfGradevf-vfanswer---vfstabilizevfinvf14vfdays
-vftemporarilyvfseed
-vfmulch
-vfpermanentlyvfstabilizevfifvfdormantvf>vf1vfyear
SitevfatvfFinalvfGradevf-vfanswer---vfstabilizevfinvf7vfdaysvf(recommendedvfimmediately)
-vfpermanentlyvforvftemporarilyvfseedvfandvfmulch
-vfmulch/matting/straw
MinimumvfStandardvf2vf-vfanswer--StockvfPiles,vfWastevfandvfBorrowvfAreas
duringvfconstruction,vfsoilvfstockvfpilesvfandvfborrowvfareasvfshallvfbevfstabilizedvforvfprotect
edvfwithvfsedimentvftrappingvfmeasures
mulchvfpreventsvferosionvfbyvfprotectingvfthevfsurfacevffromvfraindropvfimpactvfandvfsiltvffen
cevfinterceptsvfandvfdetainsvffromvfdisturbedvfareas
MinimumvfStandardvf3vf-vfanswer--PermanentvfVegetation
permanentvfvegetationvfcovervfshallvfbevfestablishedvfonvfdenudedvfareasvfnotvfotherwisevf
permanentlyvfstabilizedvf(permanentvfvegetationvfshallvfnotvfbevfconsideredvfestablishedvf
untilvfavfgroundvfcovervfisvfachievedvfthatvfisvfuniform,vfmaturevfenoughvftovfsurvive,vfandvfwi
llvfinhibitvferosionvf*therevfisvfnovf%vfassociatedvfwithvfthis*)vf
reducevferosionvfandvfdecreasevfsedimentvfyieldvffromvfdisturbedvfarea
thisvfisvfthevfstandardvfusedvftovfverifyvfthatvfavfsitevfisvfreadyvfforvfreleasevfofvfbondsvforvfsure
ty
MinimumvfStandardvf4vf-vfanswer--First-StepvfMeasures
,Sedimentvfbasinsvfandvftraps,vfperimetervfdikes,vfsedimentvfbarriersvfandvfothervfmeasure
svfintendedvftovftrapvfsedimentvfshallvfbevfconstructedvfasvfavffirstvfstepvfinvfanyvfland-
disturbingvfactivityvfandvfshallvfbevfmadevffunctionalvfbeforevfupslopevflandvfdisturbancevfta
kesvfplace
avfcertainvfamountvfofvfinitialvflandvfdisturbancevfmayvfbevfrequiredvftovfprovidevfaccessvfforvf
equipmentvftovfinstallvfthevfperimetervfcontrols,vfbutvfsitevfclearingvfandvfgradingvfshouldvfb
evfkeptvftovfavfminimumvfuntilvfthevfperimetervfcontrolsvfarevfinvfplace
interceptsvfandvfdetainsvfsmallvfamountsvfofvfsedimentvffromvfdisturbedvfareasvfduringvfcon
structionvfoperationvftovfpreventvfsedimentvffromvfleavingvfthevfsitevfandvfdecreasevfvelocit
yvfofvfsheetvfflowsvfandvflow-to-moderatevflevelvfchannelvfflow
PerimetervfControlsvf-vfanswer--
assuresvfthatvfsedimentvfdoesvfnotvfleavevfthevfperimetervfofvfthevfland-
disturbingvfareavfoncevfsitevfclearing,vfgrading,vfandvfconstructionvfcommences
Examples:vfsiltvffences,vfsedimentvftraps,vfsedimentvfbasins,vfconstructionvfentrance,vfte
mporaryvfdiversions,vfdiversions
MinimumvfStandardvf5vf-vfanswer--EarthenvfStructurevfStabilization
stabilizationvfmeasuresvfshallvfbevfappliedvftovfearthenvfstructuresvfsuchvfasvfdams,vfdikes,
vfandvfdiversionsvfimmediatelyvfaftervfinstallation
reducevferosionvfandvfsedimentationvfandvfreducevfdamagevffromvfsedimentvfandvfrunoffvft
ovfdownstreamvforvfoff-sitevfareas
MinimumvfStandardvf6vf-vfanswer--TrapsvfandvfBasins
sedimentvftrapsvfandvfbasinsvfshallvfbevfdesignedvfandvfconstructedvfbasedvfuponvfthevftota
lvfdrainagevfareavf(notvfjustvfdisturbedvfarea)vftovfbevfservedvfbyvfthevftrapvforvfbasin
SedimentvfTrapsvf-vfanswer--
minimumvfstoragevfcapacityvfshallvfbevf134vfcubicvfyardsvfpervfacrevfofvfdrainagevfareavfand
vfshallvfonlyvfcontrolvfdrainagevfareasvflessvfthanvf3vfacres
*stonevfoutletvf=vftrap*
SedimentvfBasinsvf-vfanswer--
surfacevfrunoffvffromvfdisturbedvfareasvfthatvfisvfcomprisedvfofvfflowvffromvfdrainagevfareasvf
greatervfthanvforvfequalvftovf3vfacresvfshallvfbevfcontrolledvfbyvfavfbasin;vfminimumvfstoragevf
capacityvfofvfavfsedimentvfbasinvfshallvfbevf134vfcubicvfyardsvfpervfacrevfofvfdrainagevfarea;vf
thevfoutfallvfsystemvfshall,vfatvfavfminimum,vfmaintainvfthevfstructuralvfintegrityvfofvfthevfbasi
nvfduringvfavf25-yearvfstormvfofvf24-
hourvfduration;vfrunoffvfcoefficientsvfusedvfinvfrunoffvfcalculationsvfshallvfcorrespondvftovfavf
barevfearthvfconditionvforvfthosevfconditionsvfexpectedvftovfexistvfwhilevfthevfsedimentvfbasi
nvfisvfutilized.
, SedimentvfTrappingvfDevisesvf-vfanswer--
1.vfplacevfnearvfthevflowestvfdrainagevfpointsvfofvfavfproject
2.vfinstallvfasvfavffirst-stepvfmeasurevf[MS-4]
3.vfstabilizevfimmediatelyvf[MS-5]
4.vfmustvfincludevfoutletvfprotectionvfforvfbasinsvf[MS-11]
MinimumvfStandardvf7vf-vfanswer--CutvfandvfFillvfSlopes
rougheningvfthevfsurfacevfofvfthevfslopevfdecreasesvfrunoff,vflowersvfthevfvelocityvfrunoff,vfi
ncreasesvfwatervfretention,vfandvfleadsvftovfbettervfseedvfgermination
slopesvfthatvfarevffoundvftovfbevferodingvfexcessivelyvfwithinvfonvfyearvfofvfpermanentvfstabil
izationvfshallvfbevfprovidedvfwithvfadditionalvfslopvfstabilizingvfmeasuresvfuntilvfthevfproble
mvfisvfcorrected
MinimumvfStandardvf8vf-vfanswer--ConcentratedvfRunoff
shallvfnotvfflowvfdownvfcutvforvffillvfslopesvfunlessvfcontainedvfwithinvfanvfadequatevftempora
ryvforvfpermanentvfchannel,vfflumevforvfslopevfdrainvfstructure
outletsvfofvfthesevfdrainsvfneedvfoutletvfprotectionvftovfpreventvferosionvffromvfthevfconcentr
atedvfflow
sizevfofvfpipevfdependsvfonvfdrainagevfarea
temporarilyvfconductvfconcentratedvfstormwatervfrunoffvfsafelyvfdownvfthevffacevfofvfavfcutvf
orvffillvfslopevfwithoutvfcausingvferosionvfonvforvfbelowvfthevfslope
MinimumvfStandardvf9vf-vfanswer--WatervfSeeps
whenevervfwatervfseepsvffromvfavfslopevfface,vfadequatevfdrainagevforvfothervfprotectionvfs
hallvfbevfprovided
cutvfandvffillvfoperationsvfmayvfexposevfshallowvfaquifersvforvfgroundwatervftablesvffromvfw
hichvfwatervfmayvfseepvfthroughvfthevfsidevfofvfavfslope
MinimumvfStandardvf10vf-vfanswer--InletvfProtection
allvfstormvfsewervfinletsvfthatvfarevfmadevfoperablevfduringvfconstructionvfshallvfbevfprotect
edvfsovfthatvfsediment-
ladenvfwatervfcannotvfentervfthevfconveyancevfsystemvfwithoutvffirstvfbeingvffilteredvforvfoth
erwisevftreatedvftovfremovevfsediment
stormvfsewersvfarevfdesignedvftovfefficientlyvftransportvfstormwatervfawayvffromvfthevfsite,vf
sovfwhenvfsedimentvfentersvfthevfstormvfsewervfsystem,vftwovfnegativevfeffectsvfcanvfoccur:
1.vfwhenvfvelocityvfofvfflowvfisvfhigh,vfmuchvfofvfthevfsedimentvfwillvfbevfquicklyvftransportedvft
ovfthevfnearestvfreceivingvfchannel
VESCPvf-vfanswer--VirginiavfErosionvfandvfSedimentvfControlvfProgram
-vfAdministeredvfbyvfcounties/citiesvf(must),vftownsvf(may)
-vfMUSTvfBEvfAPPROVED
MinimumvfStandardvf1vf-vfanswer--Stabilization
permanentvforvftemporaryvfsoilvfstabilizationvfshallvfbevfappliedvftovfdenudedvfareasvfwithinv
fsevenvfdaysvfaftervffinalvfgradevfisvfreachedvfonvfanyvfportionvfofvfthevfsite;vftemporaryvfsoilvf
stabilizationvfshallvfbevfappliedvfwithinvfsevenvfdaysvftovfdenudedvfareasvfthatvfmayvfnotvfbev
fatvffinalvfgradevfbutvfwillvfremainvfdormantvfforvflongervfthanvf14vfdays;vfpermanentvfstabiliz
ationvfshallvfbevfappliedvftovfareasvfthatvfarevftovfbevfleftvfdormantvfforvfmorevfthanvfonevfyear
SitevfNOTvfatvfFinalvfGradevf-vfanswer---vfstabilizevfinvf14vfdays
-vftemporarilyvfseed
-vfmulch
-vfpermanentlyvfstabilizevfifvfdormantvf>vf1vfyear
SitevfatvfFinalvfGradevf-vfanswer---vfstabilizevfinvf7vfdaysvf(recommendedvfimmediately)
-vfpermanentlyvforvftemporarilyvfseedvfandvfmulch
-vfmulch/matting/straw
MinimumvfStandardvf2vf-vfanswer--StockvfPiles,vfWastevfandvfBorrowvfAreas
duringvfconstruction,vfsoilvfstockvfpilesvfandvfborrowvfareasvfshallvfbevfstabilizedvforvfprotect
edvfwithvfsedimentvftrappingvfmeasures
mulchvfpreventsvferosionvfbyvfprotectingvfthevfsurfacevffromvfraindropvfimpactvfandvfsiltvffen
cevfinterceptsvfandvfdetainsvffromvfdisturbedvfareas
MinimumvfStandardvf3vf-vfanswer--PermanentvfVegetation
permanentvfvegetationvfcovervfshallvfbevfestablishedvfonvfdenudedvfareasvfnotvfotherwisevf
permanentlyvfstabilizedvf(permanentvfvegetationvfshallvfnotvfbevfconsideredvfestablishedvf
untilvfavfgroundvfcovervfisvfachievedvfthatvfisvfuniform,vfmaturevfenoughvftovfsurvive,vfandvfwi
llvfinhibitvferosionvf*therevfisvfnovf%vfassociatedvfwithvfthis*)vf
reducevferosionvfandvfdecreasevfsedimentvfyieldvffromvfdisturbedvfarea
thisvfisvfthevfstandardvfusedvftovfverifyvfthatvfavfsitevfisvfreadyvfforvfreleasevfofvfbondsvforvfsure
ty
MinimumvfStandardvf4vf-vfanswer--First-StepvfMeasures
,Sedimentvfbasinsvfandvftraps,vfperimetervfdikes,vfsedimentvfbarriersvfandvfothervfmeasure
svfintendedvftovftrapvfsedimentvfshallvfbevfconstructedvfasvfavffirstvfstepvfinvfanyvfland-
disturbingvfactivityvfandvfshallvfbevfmadevffunctionalvfbeforevfupslopevflandvfdisturbancevfta
kesvfplace
avfcertainvfamountvfofvfinitialvflandvfdisturbancevfmayvfbevfrequiredvftovfprovidevfaccessvfforvf
equipmentvftovfinstallvfthevfperimetervfcontrols,vfbutvfsitevfclearingvfandvfgradingvfshouldvfb
evfkeptvftovfavfminimumvfuntilvfthevfperimetervfcontrolsvfarevfinvfplace
interceptsvfandvfdetainsvfsmallvfamountsvfofvfsedimentvffromvfdisturbedvfareasvfduringvfcon
structionvfoperationvftovfpreventvfsedimentvffromvfleavingvfthevfsitevfandvfdecreasevfvelocit
yvfofvfsheetvfflowsvfandvflow-to-moderatevflevelvfchannelvfflow
PerimetervfControlsvf-vfanswer--
assuresvfthatvfsedimentvfdoesvfnotvfleavevfthevfperimetervfofvfthevfland-
disturbingvfareavfoncevfsitevfclearing,vfgrading,vfandvfconstructionvfcommences
Examples:vfsiltvffences,vfsedimentvftraps,vfsedimentvfbasins,vfconstructionvfentrance,vfte
mporaryvfdiversions,vfdiversions
MinimumvfStandardvf5vf-vfanswer--EarthenvfStructurevfStabilization
stabilizationvfmeasuresvfshallvfbevfappliedvftovfearthenvfstructuresvfsuchvfasvfdams,vfdikes,
vfandvfdiversionsvfimmediatelyvfaftervfinstallation
reducevferosionvfandvfsedimentationvfandvfreducevfdamagevffromvfsedimentvfandvfrunoffvft
ovfdownstreamvforvfoff-sitevfareas
MinimumvfStandardvf6vf-vfanswer--TrapsvfandvfBasins
sedimentvftrapsvfandvfbasinsvfshallvfbevfdesignedvfandvfconstructedvfbasedvfuponvfthevftota
lvfdrainagevfareavf(notvfjustvfdisturbedvfarea)vftovfbevfservedvfbyvfthevftrapvforvfbasin
SedimentvfTrapsvf-vfanswer--
minimumvfstoragevfcapacityvfshallvfbevf134vfcubicvfyardsvfpervfacrevfofvfdrainagevfareavfand
vfshallvfonlyvfcontrolvfdrainagevfareasvflessvfthanvf3vfacres
*stonevfoutletvf=vftrap*
SedimentvfBasinsvf-vfanswer--
surfacevfrunoffvffromvfdisturbedvfareasvfthatvfisvfcomprisedvfofvfflowvffromvfdrainagevfareasvf
greatervfthanvforvfequalvftovf3vfacresvfshallvfbevfcontrolledvfbyvfavfbasin;vfminimumvfstoragevf
capacityvfofvfavfsedimentvfbasinvfshallvfbevf134vfcubicvfyardsvfpervfacrevfofvfdrainagevfarea;vf
thevfoutfallvfsystemvfshall,vfatvfavfminimum,vfmaintainvfthevfstructuralvfintegrityvfofvfthevfbasi
nvfduringvfavf25-yearvfstormvfofvf24-
hourvfduration;vfrunoffvfcoefficientsvfusedvfinvfrunoffvfcalculationsvfshallvfcorrespondvftovfavf
barevfearthvfconditionvforvfthosevfconditionsvfexpectedvftovfexistvfwhilevfthevfsedimentvfbasi
nvfisvfutilized.
, SedimentvfTrappingvfDevisesvf-vfanswer--
1.vfplacevfnearvfthevflowestvfdrainagevfpointsvfofvfavfproject
2.vfinstallvfasvfavffirst-stepvfmeasurevf[MS-4]
3.vfstabilizevfimmediatelyvf[MS-5]
4.vfmustvfincludevfoutletvfprotectionvfforvfbasinsvf[MS-11]
MinimumvfStandardvf7vf-vfanswer--CutvfandvfFillvfSlopes
rougheningvfthevfsurfacevfofvfthevfslopevfdecreasesvfrunoff,vflowersvfthevfvelocityvfrunoff,vfi
ncreasesvfwatervfretention,vfandvfleadsvftovfbettervfseedvfgermination
slopesvfthatvfarevffoundvftovfbevferodingvfexcessivelyvfwithinvfonvfyearvfofvfpermanentvfstabil
izationvfshallvfbevfprovidedvfwithvfadditionalvfslopvfstabilizingvfmeasuresvfuntilvfthevfproble
mvfisvfcorrected
MinimumvfStandardvf8vf-vfanswer--ConcentratedvfRunoff
shallvfnotvfflowvfdownvfcutvforvffillvfslopesvfunlessvfcontainedvfwithinvfanvfadequatevftempora
ryvforvfpermanentvfchannel,vfflumevforvfslopevfdrainvfstructure
outletsvfofvfthesevfdrainsvfneedvfoutletvfprotectionvftovfpreventvferosionvffromvfthevfconcentr
atedvfflow
sizevfofvfpipevfdependsvfonvfdrainagevfarea
temporarilyvfconductvfconcentratedvfstormwatervfrunoffvfsafelyvfdownvfthevffacevfofvfavfcutvf
orvffillvfslopevfwithoutvfcausingvferosionvfonvforvfbelowvfthevfslope
MinimumvfStandardvf9vf-vfanswer--WatervfSeeps
whenevervfwatervfseepsvffromvfavfslopevfface,vfadequatevfdrainagevforvfothervfprotectionvfs
hallvfbevfprovided
cutvfandvffillvfoperationsvfmayvfexposevfshallowvfaquifersvforvfgroundwatervftablesvffromvfw
hichvfwatervfmayvfseepvfthroughvfthevfsidevfofvfavfslope
MinimumvfStandardvf10vf-vfanswer--InletvfProtection
allvfstormvfsewervfinletsvfthatvfarevfmadevfoperablevfduringvfconstructionvfshallvfbevfprotect
edvfsovfthatvfsediment-
ladenvfwatervfcannotvfentervfthevfconveyancevfsystemvfwithoutvffirstvfbeingvffilteredvforvfoth
erwisevftreatedvftovfremovevfsediment
stormvfsewersvfarevfdesignedvftovfefficientlyvftransportvfstormwatervfawayvffromvfthevfsite,vf
sovfwhenvfsedimentvfentersvfthevfstormvfsewervfsystem,vftwovfnegativevfeffectsvfcanvfoccur:
1.vfwhenvfvelocityvfofvfflowvfisvfhigh,vfmuchvfofvfthevfsedimentvfwillvfbevfquicklyvftransportedvft
ovfthevfnearestvfreceivingvfchannel