ICC CALIFORNIA UST SERVICE TECHNICIAN
CERTIFICATION QUESTIONS WITH COMPLETE
SOLUTIONS GUARANTEED PASS BRAND NEW
2025/2026
How often should ATG be programmed to test the tank?
At least monthly
According to PEI RP 300, a combustible gas can be used to?
Detect vapor leaks in a vapor recovery system.
According to PEI RP 300, a written scope of work for vapor recovery
installation should include?
Construction plans
Positive shut off overfill protection device must stop the flow of fuel
when the tank is no more then?
95% full
According to Executive Order (EO) VR 201-A , what could cause a
nozzle shut off mechanism or malfunction?
Depended filter seal damage
According to VR 201-A, breakaway reconnection must be?
,Logged in GDF log
According to PEI RP 300 what is an INCORRECT method of
documenting piping location?
Sketching a diagram on the inside cover of vapor recovery equipment
manual
According to PEI RP 300 as built drawing or pictures of the
underground pipping and other components shall be_________.
maintained as long as UST is in service.
According to EO VR 101-E maintenance records are required to include
what?
Name and Designated UST Operator.
The Phil-Tite EVR Phase 1 system require that vapor vent pipes at any
UST system be
Used with no more than 3 p/v valves
According to EO VR 2010 after installing a new spout assembly in the
Healy 900 nozzle the following test must be conducted?
Nozzle dispensing shut off test
,According to Healy EO VR 201-A a vapor recovery record is to be
maintained by?
Gasoline dispensing facility operator(GDF)
An enhanced leak detection test is required within how many feet of a
public drinking well?
1000 feet
What are the components of the Fire Triangle?
Fuel, Heat/Ignition Source, Oxygen
If equipped with an over fill alarm, it must be located?
So it can be seen or heard from the delivery location.
If installed, the following requires independent 3rd party
certification to prove compliance with established regulations.
Automatic Tank Gauge, Liquid Product Detectors, SIR
Where are ATG's installed?
Opening in top of the tank
What is true about ATG's
They're capable of alarming operator of low product level
, The following types of releases must be reported to the local agency.
Releases greater than 25 gallons that escape secondary containment.
Release that escape primary containment. Releases less than 25 gallons
which escape secondary containment
If an unauthorized product release meets the requirements for
reporting to the local agency, verbal notification must be made within
____hours, followed by a written notification within ____days.
24 HRS, 5 DAYS
The following unusual conditions shall be reported to the local
agency, EXCEPT:
Water in spill buckets
If the monitoring system detects a leak that has occurred, the local
agency must be notified unless______.
Unless the monitoring device is found to be defective and is
immediately repaired.
The written report submitted to the local agency after an
unauthorized release is required to include the following EXCEPT:
CERTIFICATION QUESTIONS WITH COMPLETE
SOLUTIONS GUARANTEED PASS BRAND NEW
2025/2026
How often should ATG be programmed to test the tank?
At least monthly
According to PEI RP 300, a combustible gas can be used to?
Detect vapor leaks in a vapor recovery system.
According to PEI RP 300, a written scope of work for vapor recovery
installation should include?
Construction plans
Positive shut off overfill protection device must stop the flow of fuel
when the tank is no more then?
95% full
According to Executive Order (EO) VR 201-A , what could cause a
nozzle shut off mechanism or malfunction?
Depended filter seal damage
According to VR 201-A, breakaway reconnection must be?
,Logged in GDF log
According to PEI RP 300 what is an INCORRECT method of
documenting piping location?
Sketching a diagram on the inside cover of vapor recovery equipment
manual
According to PEI RP 300 as built drawing or pictures of the
underground pipping and other components shall be_________.
maintained as long as UST is in service.
According to EO VR 101-E maintenance records are required to include
what?
Name and Designated UST Operator.
The Phil-Tite EVR Phase 1 system require that vapor vent pipes at any
UST system be
Used with no more than 3 p/v valves
According to EO VR 2010 after installing a new spout assembly in the
Healy 900 nozzle the following test must be conducted?
Nozzle dispensing shut off test
,According to Healy EO VR 201-A a vapor recovery record is to be
maintained by?
Gasoline dispensing facility operator(GDF)
An enhanced leak detection test is required within how many feet of a
public drinking well?
1000 feet
What are the components of the Fire Triangle?
Fuel, Heat/Ignition Source, Oxygen
If equipped with an over fill alarm, it must be located?
So it can be seen or heard from the delivery location.
If installed, the following requires independent 3rd party
certification to prove compliance with established regulations.
Automatic Tank Gauge, Liquid Product Detectors, SIR
Where are ATG's installed?
Opening in top of the tank
What is true about ATG's
They're capable of alarming operator of low product level
, The following types of releases must be reported to the local agency.
Releases greater than 25 gallons that escape secondary containment.
Release that escape primary containment. Releases less than 25 gallons
which escape secondary containment
If an unauthorized product release meets the requirements for
reporting to the local agency, verbal notification must be made within
____hours, followed by a written notification within ____days.
24 HRS, 5 DAYS
The following unusual conditions shall be reported to the local
agency, EXCEPT:
Water in spill buckets
If the monitoring system detects a leak that has occurred, the local
agency must be notified unless______.
Unless the monitoring device is found to be defective and is
immediately repaired.
The written report submitted to the local agency after an
unauthorized release is required to include the following EXCEPT: