Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

APM PFQ Exam & HEART COMBINED EXAMINATION 2025 UPDATED 2025 – 2026 QUESTIONS AND ANSWERS WITH COMPLETE SOLUTION

Beoordeling
-
Verkocht
-
Pagina's
66
Cijfer
A+
Geüpload op
21-12-2025
Geschreven in
2025/2026

APM PFQ Exam & HEART COMBINED EXAMINATION 2025 UPDATED 2025 – 2026 QUESTIONS AND ANSWERS WITH COMPLETE SOLUTION

Instelling
APM PFQ
Vak
APM PFQ

Voorbeeld van de inhoud

Page 1 of 66


APM PFQ Exam & HEART COMBINED EXAMINATION 2025 UPDATED 2025 – 2026 WITH
QUESTIONS WITH CORRECT ANSWERS VERIFIED 100% GRADED A+




APM PFQ Exam Questions questions with verified answers 2025-2026




Which of the following is not a stage in an issue resolution process?
a. Share the issue with stakeholders.
b. Track the issue to closure. c. Escalate to the sponsor.
d. Apply change control.
A
Which of the following are challenges for a project manager developing and
leading a project team?
1) Issues and incompatibility amongst team members
2) Getting the right skills and attributes amongst team members
3) Co-location of team members in the same geographic area
4) Lack of accountability of team members
a. 1, 2 & 3
b. 1, 2 & 4
c. 1, 3 & 4
d. 2, 3 & 4
C
Which of the following is an activity in a typical change control process?
a. Recommendation.
b. Justification.
c. Planning.
d. Continuous improvement
A
The purpose of quality assurance is to:
a. provide confidence the project will satisfy the relevant quality standards.
b. determine a set of procedures and standards for project management.
c. inspect, measure and test deliverables and processes.
d. define the scope and specifics of a project's deliverables
A
A project manager might use a PESTLE analysis in order to:
a. mitigate all possible risks to the project.
b. identify and mitigate factors that may affect the project.

, Page 2 of 66


c. control technological change during the project.
d. consider team social roles in early stages of the project
B
Which of the following are phases in an iterative project life cycle? 1) Concept
2) Feasibility 3) Deployment 4) Development
a. 3 and 4 only
b. 1, 2 and 3
c. 1 and 2 only
d. 2, 3 and 4
D
Which of the following is the responsibility of a project manager?
a. Ensuring a project is aligned to the organisation's strategy.
b. Focusing on project benefits and aligning priorities.
c. Achieving the project's success criteria.
d. Improving process, tools and techniques used in a project
C
To develop and establish a proper communication plan within a project, the
project manager needs to consider which type of analysis?
a. Budget.
b. Stakeholder.
c. Resource.
d. Schedule
B
Which of the following is a responsibility of the project sponsor?
a. Creating a project cost breakdown structure.
b. Authoring the project management plan.
c. Creating a project work breakdown structure.
d. Owning the project business case.
D
Portfolio management includes prioritising:
a. projects and/or programmes that contribute directly to the organisation's
strategic objectives.
b. projects with exceptionally high returns on investment.
c. projects and programmes over business as usual.
d. projects which maximise change over those which maximise investment
A
Which of the following actions would not help a team leader influence the
performance of their team?
a. Creating an exclusive environment.
b. Providing clear roles and responsibilities.
c. Promoting openness and honesty.
d. Developing a trusting relationship.
A

, Page 3 of 66


One difference between a project and business as usual is:
a. projects achieve specified benefits but business as usual has only vague
benefits.
b. projects drive change whereas business as usual continues existing
activities.
c. projects have tightly controlled budgets whereas business as usual does
not.
d. projects have unclear deadlines but business as usual has multiple
milestones
B
The purpose of project progress reporting is to:
a. ensure a simpler critical path.
b. enable the tracking of project deliverables.
c. ensure stakeholder acceptance of project deliverables.
d. provide an increased total float.
B
Which of the following is the purpose of an estimating funnel?
a. Keeping resource usage to a minimum to help reduce costs.
b. Supporting the production of comparative estimates.
c. Identifying where costs can be minimised when preparing a budget.
d. Representing increasing levels of estimating accuracy achieved through the
life cycle
D
One advantage of virtual communications is:
a. that nonverbal signals can have an impact on discussions.
b. it's easy to detect signs of conflict within the project team.
c. access to a wider resource pool for the project.
d. that the project team will always be co-located.
C
Which technique could be used by a project manager when resources are
limited?
a. Resource aggregation.
b. Resource estimation.
c. Resource levelling.
d. Resource expansion
C
The main aim of quality management is to:
a. prepare a high-quality management plan.
b. ensure that deliverables meet appropriate standards.
c. validate the use of consistent standards.
d. determine whether to accept change requests.
B
Which of the following is a purpose of issue management?
a. To stop issues occurring within the project.

, Page 4 of 66


b. To address and resolve the issues that occur.
c. To address and resolve uncertainty.
d. To reschedule activities to reduce costs
B
Product breakdown structures illustrate the required scope of work by a
hierarchical structure itemising the:
a. components of each product.
b. budget of each product.
c. benefits of each product.
d. risks of each product.
A
The definition of benefits management includes which key activities?
a. Planning, analysis and integration of project benefits.
b. Justification, validation and acceptance of project benefits.
c. Identification, tracking and realisation of project benefits.
d. Realisation, acceptance and integration of project benefits
C
Which of the following statements about scheduling is false?
a. Defines the sequence of activities.
b. Considers work calendars and time contingency.
c. Provides a baseline for safety considerations.
d. Quantifies the required resources.
C
Which of the following defines the term 'deployment baseline'?
a. The starting point for creating a resource histogram.
b. The basis for creating an organisational breakdown structure.
c. The starting point for the monitoring of project risks.
d. The basis for progress monitoring.
D
Which of the following is an activity in a typical configuration management
process?
a. Evaluation.
b. Identification.
c. Registration.
d. Justification.
B
Stakeholder analysis supports effective stakeholder engagement by:
a. identifying stakeholders with high levels of power and interest.
b. ensuring stakeholder acceptance of project deliverables.
c. justifying the preferred project option to stakeholders.
d. providing information to all stakeholders.
A
Which of the following is a project?
a. Introducing a new information technology system.

Geschreven voor

Instelling
APM PFQ
Vak
APM PFQ

Documentinformatie

Geüpload op
21 december 2025
Aantal pagina's
66
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$22.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Succeed Havard University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
1826
Lid sinds
6 jaar
Aantal volgers
1499
Documenten
5760
Laatst verkocht
5 dagen geleden

3.9

293 beoordelingen

5
167
4
34
3
36
2
9
1
47

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen