Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

Mass Oil burner / NFPA 31 & NORA Comprehensive Frequently Tested Questions With Verified Multiple Choice and Conceptual Actual 100% Correct Detailed Answers Guaranteed Pass!!Current Update!!

Rating
-
Sold
-
Pages
29
Grade
A+
Uploaded on
22-12-2025
Written in
2025/2026

Mass Oil burner / NFPA 31 & NORA Comprehensive Frequently Tested Questions With Verified Multiple Choice and Conceptual Actual 100% Correct Detailed Answers Guaranteed Pass!!Current Update!! 1. The trial for ignition period for oil burners less than 20 GPM is? - ANSWER 15 seconds 2. Fusible switches shall operate at a temp of - ANSWER 165F 3. A masonry chimney needs a metal liner - ANSWER False 4. Any valves used on oil burner installation must be a - ANSWER Fusible valve 5. What form is used to pull an oil burner permit - ANSWER Form 1 6. What size pipe is used to cross connect tank outlet piping - ANSWER 1/2 inch 7. What is an oil safety valve required - ANSWER On existing installations when a burner, boiler, furnace or tank is replaced 8. When must you install a draft regulator - ANSWER When not exempted by the manufacturer 9. As of January 1 2014, max safety timing for an oil burner safety switch must be no more than - ANSWER 15 seconds

Show more Read less
Institution
NORA Oil Heat
Course
NORA Oil Heat

Content preview

Mass Oil burner / NFPA 31 & NORA 2026-2027
Comprehensive Frequently Tested Questions
With Verified Multiple Choice and Conceptual
Actual 100% Correct Detailed Answers

Guaranteed Pass!!Current Update!!


1. The trial for ignition period for oil burners less than 20 GPM is? - ANSWER
15 seconds



2. Fusible switches shall operate at a temp of - ANSWER 165F



3. A masonry chimney needs a metal liner - ANSWER False



4. Any valves used on oil burner installation must be a - ANSWER Fusible
valve



5. What form is used to pull an oil burner permit - ANSWER Form 1



6. What size pipe is used to cross connect tank outlet piping - ANSWER 1/2
inch



7. What is an oil safety valve required - ANSWER On existing installations
when a burner, boiler, furnace or tank is replaced

,8. When must you install a draft regulator - ANSWER When not exempted
by the manufacturer


9. As of January 1 2014, max safety timing for an oil burner safety switch must
be no more than - ANSWER 15 seconds



10.What type of boiler must be equipped with low water cut off - ANSWER
Water boilers over 400,000 BTU, all steam boiler



11.What device must be equipped with air proving switch - ANSWER A
draft inducer



12.New burner controls must be - ANSWER Interrupted ignition



13.Hot water boilers need low water cut off if over - ANSWER 500,000 BTU


14.How far must continuous concrete slab extend beyond tank perimeter -
ANSWER 8 inches



15.Can I use any form other than form 1 or form 1A - ANSWER No, only
form 1 and 1A are approved by state fire Marshall

, 16.What must I do if I have a oil tank larger than 10,000 gallons - ANSWER
You must apply for, and obtain both a permit and license from the local
town or city for the use of the tank


17.What license are acceptable for installing an oil burner or oil tank - ANSWER
M.G.L c. 148, & 10D, and applicable provisions of St. 1964, C. 680 allows
for only the holder of certificate of competency to install oil burner
equipment and sign form 1A


18.Do I need to pull a permit when replacing an oil line or installing an osv -
ANSWER Yes. Any alteration of oil burner install requires a permit be
pulled under CMR 1.00 using form 1 only



19.Can I cross connect two tanks at bottom with 3/8 pipe tubing - ANSWER
No, cross connecting must be made with no smaller than 1/2 inch iron pipe
or o.d. Tubing


20.On a new install, can I install an OSV in the supply line instead of enasing
the line - ANSWER No, on new installs where the supply line is in direct
contact with concrete or earth, the supply line must be in a sleeve


21.Is any non metallic material acceptable for use as an oil line sleeve? Would
pvc hose be allowed - ANSWER Yes



22.When can I use an oil safety valve - ANSWER On existing installations
when a burner, boiler, furnace or tank is replaced

Written for

Institution
NORA Oil Heat
Course
NORA Oil Heat

Document information

Uploaded on
December 22, 2025
Number of pages
29
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$13.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
EWLindy Harvard University
Follow You need to be logged in order to follow users or courses
Sold
755
Member since
3 year
Number of followers
431
Documents
8108
Last sold
4 days ago
EN.CY.CLO.PE.DI.A

As a Career Tutor, I understand the pressure of managing demanding coursework, exams, and practical requirements across multiple disciplines. These professionally organized revision materials are designed to support students in nursing, healthcare administration, business, information systems, Engineering, health, IT, or trade courses management programs by simplifying complex concepts and reinforcing high-yield academic content. The materials are developed to help students: Understand core theories and practical applications across Multiple Disciplines Review exam relevant content aligned with undergraduate and graduate curriculam To Strengthen critical thinking, analytical reasoning, and decision-making skills Save time with clear, structured summaries instead of overwhelming textbooks Prepare efficiently for tests, assignments, case studies, and professional exams Each resource is created with academic standards in mind, integrating real world examples, industry terminology, and evidence based concepts commonly required in professional programs. Whether you are studying nursing fundamentals, healthcare management, information systems, project management, business strategy, Engineering these materials provide focused, reliable support for academic success. These revision guides are ideal for: Nursing and allied health students Healthcare administration and public health students Business, MBA, and management students Information technology and information systems students, engineering, business, IT, or trade courses If you are looking for clear, student-friendly, exam-focused revision materials that support multiple career pathways, these resources are designed to help you study smarter, perform better, and stay confident throughout your academic journey. WISH YOU SUCCESS!!

Read more Read less
3.7

112 reviews

5
56
4
14
3
17
2
6
1
19

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions