1. What is the primary purpose of a demolition plan?
A. To increase worker productivity
B. To identify building materials
C. To ensure safety and efficiency during demolition
D. To reduce project cost
Rationale: A demolition plan outlines procedures, hazards, and
sequences to minimize risk and ensure safe, controlled demolition.
2. Which of the following is considered a controlled demolition method?
A. Manual dismantling
B. Implosion using explosives
, C. Unplanned collapse
D. Fire-assisted demolition
Rationale: Controlled demolition methods, such as implosion, are
carefully planned to safely bring down structures in a predictable
manner.
3. What is the minimum safe distance for personnel from a structure
during an explosive demolition?
A. 10 feet
B. 50 feet
C. 100 feet
D. Determined by a qualified engineer based on structure size and
explosive charge
Rationale: Safe distances vary depending on building height,
materials, and type of explosive. Qualified engineers calculate this
distance.
4. Before starting demolition, it is critical to:
A. Begin work immediately to save time
B. Remove all combustible materials only
C. Perform a site survey and identify hazards
D. Notify neighbors only
Rationale: A thorough site survey identifies hazards such as utilities,
structural weaknesses, and environmental concerns.
,5. What type of personal protective equipment (PPE) is required during
demolition operations?
A. Gloves and hat
B. Safety boots only
C. Hard hat, safety glasses, gloves, steel-toed boots, and respiratory
protection
D. Earplugs only
Rationale: Comprehensive PPE protects workers from debris, dust,
falling objects, and other hazards common in demolition.
6. What is a common hazard associated with asbestos-containing
materials during demolition?
A. Fire risk
B. Respiratory exposure leading to lung disease
C. Electrical shock
D. Noise exposure
Rationale: Disturbing asbestos can release fibers into the air, posing
serious respiratory health risks.
7. Which type of demolition uses mechanical equipment to dismantle
structures?
A. Implosion
B. Mechanical demolition
C. Burning
D. Excavation
, Rationale: Mechanical demolition involves cranes, excavators, and
hydraulic shears to safely dismantle buildings.
8. How should electrical utilities be handled before demolition begins?
A. Left on to maintain building lighting
B. Partially disconnected
C. Fully disconnected and verified by a qualified electrician
D. Only disconnect during debris removal
Rationale: Fully disconnecting and locking out electrical systems
prevents electrocution hazards during demolition.
9. What is the primary function of dust suppression during demolition?
A. Improve visibility
B. Reduce airborne particles and protect worker health
C. Speed up demolition
D. Make the site look clean
Rationale: Water sprays and other dust control methods minimize
inhalation of harmful particles.
10. Which tool is most appropriate for cutting reinforced concrete?
A. Sledgehammer
B. Chisel
C. Diamond-tipped saw or hydraulic cutter
D. Axe
Rationale: Diamond-tipped saws or hydraulic cutters can efficiently
cut through reinforced concrete without excessive force or risk.