Prepare confidently for the Virginia Department of Environmental Quality (VA DEQ) SWM Inspector Exam with this Latest 2025/2026 Exam Prep & Practice Questions resource. Designed for stormwater management professionals, environmental inspectors, and students pursuing SWM certification, this guide provides exam-style questions, verified answers, and practical review material to ensure thorough preparation for the certification exam. What’s Included ️ VA DEQ SWM Inspector exam practice questions ️ Verified correct answers for accurate review ️ Updated for Latest 2025/2026 standards ️ Stormwater management regulations and best practices ️ Site inspection procedures and compliance ️ Reporting, documentation, and enforcement protocols ️ High-yield study guide for exam readiness Topics Covered Virginia SWM laws, regulations, and policies Stormwater site inspection techniques Best management practices (BMPs) Construction and post-construction compliance Documentation, reporting, and enforcement procedures Perfect For VA DEQ SWM Inspector exam candidates Environmental inspectors and professionals Students and trainees in stormwater management Self-study and final exam preparation This exam prep guide helps you reinforce stormwater management knowledge, master inspection procedures, and confidently pass the VA DEQ SWM Inspector Exam.

Meer zien Lees minder
Instelling
VA DEQ SWM
Vak
VA DEQ SWM

Voorbeeld van de inhoud

VA DEQ SWM Inspector Exam – Latest
2025/2026 Exam Prep & Practice Questions
What element is targeted by water quality criteria? - correct answerPhosphorous, it
indicates pollution by bonding with other pollutants.

At what % impervious cover are streams substantially affected? - correct answer25%

what is the site-based load limit for water quality? - correct answer0.41 lbs/acre/yr total
phosphorous

Virginia Runoff Reduction Method- method of load calculations - correct answerload
calculations based on land cover type and soil type.

what must happen to potentially harmful sheet flow runoff? - correct answerMust be
diverted to stormwater conveyance system.

SWM ponds must be able to convey water safely up to what level storm event? - correct
answermust be able to safely convey up to a 100 yr storm.

Define LDA - correct answerLand disturbing activity; any man-made change to the land
surface that potentially changes its runoff characteristics; includes clearing, grading, and
excavation.

What size LDA must comply with stormwater management regulation? in CPBA areas?
- correct answeranything of 1 acre or more, or 2500 ft^2 in CPBA areas; may be more
stringent locally.

what are some activities exempt from SWM regulations? - correct answermining,
agriculture, sewer discharges, local reclamation programs, routine maintenance of
preexisting operations, public emergency activity

what term basically means a plea deal for stormwater offenders? - correct
answerconsent order, which replaces penalties with fines.

how long does VSMP authority have to review SWM plan? - correct answer15 days to
review and determine approval, and notify applicant.

How often must a VSMP authority inspect an LDA? - correct answerPeriodically.

all SWPPP requirements may be met by - correct answerincorporating other plans into
reference, or by developing missing elements.

,What must the DEQ issue to an operator before an LDA? - correct answera construction
GP

How soon after final grade of a site must vegetation be put in place? - correct
answerwithin 7 days.

How long must operator keep routine inspection reports? - correct answerAt least 3
years after the GP expires/terminates.

How long does operator have to revise SWPPP if authority deems it necessary? How
long does local authority have to review any modifications to SWPPP? - correct
answer7 days for operator to make changes, 60 days for authority to review changes.

How long does operator have to notify DEQ of an unauthorized discharge? How long
does operator have to make a written report of this? - correct answerwithin 24 hours of
discovery for notification, within 5 days for written acknowledgement.

What constitutes a measurable rain event according to GP? - correct answer0.25 in. or
more over 24 hours.

Co-located practices - correct answerDuring construction, a facility functions for ESC,
and is later constructed into a stormwater BMP.

During construction, when should inspector make sure a BMP is not installed? - correct
answerBMP should not be installed before contirbuting drainage area has been
stabilized.

Notice of Termination forms, to terminate construction permits, must be sent after how
many days once conditions are met? - correct answer30 days

When is ground considered stabilized? - correct answerwhen vegetation is uniform,
mature enough to survive, and will inhibit erosion.

How long must VSMP authority keep construction record drawings? - correct
answerUntil the relevant SWM facility is removed.

How soon after meeting permit requirements must the VSMP authority return any bonds
or securities to operator? - correct answerwithin 60 days.

VSMP authorities must ensure that SWM facilities, post-construction, are inspected at
least once every ___ years, unless: - correct answerat least once every 5 years unless
a certified personnel provides inspection reports at least once a year.

What legislation authorizes the VA SWM Program? - correct answerThe Virginia
Stormwater Management Act

, What regulation administers the VA SWM Program? - correct answerThe Virginia
Stormwater Management Program Regulation

The Stormwater Management act requires the State Water Control Board to do what? -
correct answerpermit, regulate, and control stormwater runoff

How many days does DEQ have to complete review of real or potential inter-
jurisdicitonal impacts upon request? - correct answer90 days

Who is required to maintain a certificate of competency by the Stormwater Management
Act? - correct answerstaff of a stormwater program, anyone contracted by a VSMP
authority, and all standard and specification holders

A SWM Plan must be approved by who prior to land disturbance? - correct answerthe
VSMP Program Authority

What is the TP limit for a site? - correct answer0.41 lbs/ac/yr

The phosphorus load limit uses what % impervious cover? - correct answer10%

Part II B and II C water quantity criteria addresses: - correct answerchannel protection
and flood protection

Of all the plans included in the SWPPP, which two must be approved? - correct
answerthe SWM and ESC Plans

Does a SWM plan address runoff during or after construction? - correct answerpost-
construction

What is the lower limit of imperviousness which could result in stream degradation? -
correct answer10%

If land disturbance occurs as a result of emergency work, what is the timeline for
advising the VSMP authority of the disturbance? - correct answerwithin 7 days of
commencing the LDA and a permit application must be submitted within 30 days

DEQ is responsible for enforcing the ______ while locality _______ are responsible for
enforcing local ordinances. - correct answerConstruction GP, VSMP

BMPs use these three mechanisms to control pollution: - correct answerInfiltration,
settling, and vegetative uptake

How long does a locality VSMP authority have to determine the completeness of a
SWM plan? - correct answer15 days

Geschreven voor

Instelling
VA DEQ SWM
Vak
VA DEQ SWM

Documentinformatie

Geüpload op
26 december 2025
Aantal pagina's
16
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$16.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Successscore Phoenix University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
64
Lid sinds
9 maanden
Aantal volgers
1
Documenten
2037
Laatst verkocht
6 dagen geleden
Ultimate Study Resource | Nursing, HESI, ATI, TEAS, Business & More

Welcome to your one-stop exam prep store!

3.3

12 beoordelingen

5
4
4
2
3
2
2
1
1
3

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen