SWPPP LATEST EXAM PREP QUESTIONS
AND ANSWERS PDF 2026
▶ Stormwater issues are usually discussed during the pre-con meeting
include. Answer: SWPPP BMP's and construction schedule
▶ Sediment control devices must be installed. Answer: Down slope of
construction areas and functioning as designed prior to beginning land
disturbing activities
▶ If you have stormwater inlets in your construction roadway. Answer:
Consult your project SWPPP to ensure you are protecting inlets properly
▶ Soil stock piles and other disturb areas must receive. Answer:
Temporary stabilization if they will remain in active for more than 14 days
and potentially fewer days depending on the jurisdiction
▶ In the process of transitioning form Lan development to building
construction it is important to. Answer: Implement specific BMP's to
address potential pollution associated with construction materials
▶ The SWPPP sequence of activities can be modified. Answer: After
consulting the project SWPPP designer and or project owner and receiving
approval
▶ Once the notice of termination is filed store all stormwater related project
information. Answer: For three years or more depending on permit and
contact obligation
▶ When installing perimeter BMP controls. Answer: No locations and
dates of installation on site map
▶ Stormwater issues usually discussed during the pre-con meeting include.
Answer: SWPPP BMP's and the construction schedule
AND ANSWERS PDF 2026
▶ Stormwater issues are usually discussed during the pre-con meeting
include. Answer: SWPPP BMP's and construction schedule
▶ Sediment control devices must be installed. Answer: Down slope of
construction areas and functioning as designed prior to beginning land
disturbing activities
▶ If you have stormwater inlets in your construction roadway. Answer:
Consult your project SWPPP to ensure you are protecting inlets properly
▶ Soil stock piles and other disturb areas must receive. Answer:
Temporary stabilization if they will remain in active for more than 14 days
and potentially fewer days depending on the jurisdiction
▶ In the process of transitioning form Lan development to building
construction it is important to. Answer: Implement specific BMP's to
address potential pollution associated with construction materials
▶ The SWPPP sequence of activities can be modified. Answer: After
consulting the project SWPPP designer and or project owner and receiving
approval
▶ Once the notice of termination is filed store all stormwater related project
information. Answer: For three years or more depending on permit and
contact obligation
▶ When installing perimeter BMP controls. Answer: No locations and
dates of installation on site map
▶ Stormwater issues usually discussed during the pre-con meeting include.
Answer: SWPPP BMP's and the construction schedule