SWPPP PRACTICE EXAM QUESTIONS AND
DETAILED SOLUTIONS 2026
▶ The notice of termination can be filed when. Answer: All construction
inside and outside of the building is completed and the final stabilization
has been verified as complete
▶ Operators on a construction site are the entity in charge of plans and
specifications and the entity who is. Answer: Is in charge of daily activities
▶ You should have a SWPPP for your construction site because (3
reasons). Answer: 1. Its documents stormwater management
2. Demonstrates your intent to manage stormwater on your site
3. It is required by law
▶ A well constructed SWPPP for your site should be. Answer: Site specific
▶ The NO must be submitted. Answer: Prior to you commencing
construction
▶ One necessary component of a good SWPPP is. Answer: A schedule of
activities
▶ Factors that may impact the SWPPP scheduling activities include.
Answer: Weather and climate
▶ Pollutant sources on a construction site may include (3). Answer: 1.
petroleum storage tanks
2. Masonry material
3. soil amendment
▶ The following considerations may be incorporatedd into SWPPP.
Answer: Endangered species and historical preservation
, ▶ If you beileve BMP modifications are necessary onsite you must,.
Answer: Seek written approval of the project SWPPP designer and project
owner
▶ The SWPPP will contain the following (3). Answer: 1. Erosion and
sediment control bet management practices
2. A site specific sequence of construction activiites
3. site maps
▶ Once a site has experienced a rain event of measurable quantity you
must identify. Answer: Deficit and fialed BMP's and repair
▶ The document that contains the permit number is. Answer: The permit
authorization letter
▶ The portion of the the SWPPP that specifies the content of the SWPPP
is. Answer: The table of contents
▶ The document in the SWPPP that certifies the GC's commitment to
compliance with the SWPPP. Answer: The SWPPP certification letter
▶ The certifactions letter that identifies the name and contact information of
subcontractors on the site is. Answer: The subcontractors certification form
▶ The documents that reveal the total area of disturbance are. Answer:
The site maps
▶ The document completed by the project SWPPP inspector recording site
conditions during the inspection is. Answer: The inspection report form
▶ The document that must be completed to report hazardous spill on site
is. Answer: The spill report form
▶ The document that verifies that weekly management meetings have
been conducted is. Answer: The weekly meeting form
▶ The document delegating responsibility of inspections to another is.
Answer: The delegation letter
DETAILED SOLUTIONS 2026
▶ The notice of termination can be filed when. Answer: All construction
inside and outside of the building is completed and the final stabilization
has been verified as complete
▶ Operators on a construction site are the entity in charge of plans and
specifications and the entity who is. Answer: Is in charge of daily activities
▶ You should have a SWPPP for your construction site because (3
reasons). Answer: 1. Its documents stormwater management
2. Demonstrates your intent to manage stormwater on your site
3. It is required by law
▶ A well constructed SWPPP for your site should be. Answer: Site specific
▶ The NO must be submitted. Answer: Prior to you commencing
construction
▶ One necessary component of a good SWPPP is. Answer: A schedule of
activities
▶ Factors that may impact the SWPPP scheduling activities include.
Answer: Weather and climate
▶ Pollutant sources on a construction site may include (3). Answer: 1.
petroleum storage tanks
2. Masonry material
3. soil amendment
▶ The following considerations may be incorporatedd into SWPPP.
Answer: Endangered species and historical preservation
, ▶ If you beileve BMP modifications are necessary onsite you must,.
Answer: Seek written approval of the project SWPPP designer and project
owner
▶ The SWPPP will contain the following (3). Answer: 1. Erosion and
sediment control bet management practices
2. A site specific sequence of construction activiites
3. site maps
▶ Once a site has experienced a rain event of measurable quantity you
must identify. Answer: Deficit and fialed BMP's and repair
▶ The document that contains the permit number is. Answer: The permit
authorization letter
▶ The portion of the the SWPPP that specifies the content of the SWPPP
is. Answer: The table of contents
▶ The document in the SWPPP that certifies the GC's commitment to
compliance with the SWPPP. Answer: The SWPPP certification letter
▶ The certifactions letter that identifies the name and contact information of
subcontractors on the site is. Answer: The subcontractors certification form
▶ The documents that reveal the total area of disturbance are. Answer:
The site maps
▶ The document completed by the project SWPPP inspector recording site
conditions during the inspection is. Answer: The inspection report form
▶ The document that must be completed to report hazardous spill on site
is. Answer: The spill report form
▶ The document that verifies that weekly management meetings have
been conducted is. Answer: The weekly meeting form
▶ The document delegating responsibility of inspections to another is.
Answer: The delegation letter