DBIA 520 - CORRECT ANSWER-Standard Form of Preliminary Agreement Between Owner and
Design-Builder
DBIA 525 - CORRECT ANSWER-Standard Form of Agreement Between Owner & Design-Builder
for a Lump Sum
DBIA 530 - CORRECT ANSWER-Standard Form of Agreement Between Owner & Design-Builder,
Cost Plus Fee with an Option for a Guaranteed Maximum Price
DBIA 535 - CORRECT ANSWER-Standard Form of General Conditions of Contract Between
Owner & Design-Builder
DBIA 540 - CORRECT ANSWER-Standard Form of Agreement Between Design-Builder & Design
Consultant,
DBIA 550 - CORRECT ANSWER-Standard Form of Agreement Between Design-Builder & General
Contractor, Cost Plus Fee with or without a Guaranteed Maximum Price
,DBIA 580 - CORRECT ANSWER-Standard Form of Teaming Agreement Between Design-Builder &
Teaming Party
Co-location - CORRECT ANSWER-The term used to describe the situation where the designers
and contractors are placed in close proximity to one another, often in the same office or jobsite
trailer.
Design Reconciliation - CORRECT ANSWER-The process of managing the design to a set of pre-
determined "targets"
ADePT - CORRECT ANSWER-Technology to assess design value.
Request for Proposals - CORRECT ANSWER-Document the describes the procurement process,
forms the basis for final proposals an becomes an element of the contract.
RFP, Technical Proposal, Price Proposal - CORRECT ANSWER-Three documents that initially
govern the DB agreement in the best value competition.
Controlling Party - CORRECT ANSWER-The party holding the prime contract position in a
multiple firm DB contractual relationship.
35% - CORRECT ANSWER-Design Build RFP's will be evaluated off of less than what percentage
for qualifications based evaluation.
Negotiate - CORRECT ANSWER-What the DB'er now has the right to do after award of contract.
Honorarium - CORRECT ANSWER-A stated amount sometimes paid to unsuccessful proposers in
consideration of preparing a Design-Build Proposal.
, Spearin Doctrine - CORRECT ANSWER-The owner warrants the sufficiency of the plans and
specs to the contractor under this regulation. Owner is responsible for increased cost due to
defective plans/specs
Shortlisting - CORRECT ANSWER-The process of narrowing the field of DB teams through the
selection of the most qualified proposers on the basis of qualifications.
Design-Construct Interface - CORRECT ANSWER-When you align design delivery with the
construction schedule.
"No-Go" Example - CORRECT ANSWER-The owner has plans that are too developed and the
DB'er must provide a price.
"No-Go" Example - CORRECT ANSWER-All firms that prequalify in the RFQ process are eligible to
compete for the Best Value procurement in the RFP process.
Technical Proposal - CORRECT ANSWER-The portion of the DB proposal that contains the non-
price components such as design, proposed schedule, overall management approach, and
quality assurance plan.
Performance Requirement - CORRECT ANSWER-A requirement the expressed the owner's needs
and expected operation of the end product. and results.
Certificate of Errors and Omissions Insurance - CORRECT ANSWER-NOT included in the basis of
design documents.
Basis of Design Documents - CORRECT ANSWER-Owner's Project Criteria (RFP), Deviation List,
Design-Builder's Proposal.