Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

CON 3990 FAR Parts Exam QUESTIONS WITH CORRECT SOLUTIONS||100% GUARANTEED PASS||UPDATED 2026/2027 SYLLABUS||A+ GRADED||NEWEST VERSION

Beoordeling
-
Verkocht
-
Pagina's
35
Cijfer
A+
Geüpload op
04-03-2026
Geschreven in
2025/2026

CON 3990 FAR Parts Exam QUESTIONS WITH CORRECT SOLUTIONS||100% GUARANTEED PASS||UPDATED 2026/2027 SYLLABUS||A+ GRADED||NEWEST VERSION In ensuring overall quality of items and services received under a contract, which of the following is the responsibility of the Government? - ANSWER Quality assurance surveillance Feedback: See FAR subpart 46.1 What underlying principle should the contracting officer follow to avoid organizational conflicts of interest? - ANSWER Prevent unfair competitive advantage Feedback: See FAR 9.505 Where in the FAR is contracting by negotiation covered? - ANSWER FAR part 15 Feedback: See FAR part 15 When a contractor submits a Certificate of Current Cost or Pricing data, it is certifying that: - ANSWER The data submitted in support of a negotiations are current, accurate, and complete. Feedback: See FAR 15.406-2 Prenegotiation objectives: - ANSWER Establish the Government's initial negotiation position Feedback: See FAR 15.406-1(a) Except when authorized otherwise, a Government contract: - ANSWER Must be in writing Feedback: See FAR 2.101, definition of a contract A contractor employee accidentally broke a test fixture that belongs to the Government and is accountable to a Government contract. Generally speaking: - ANSWER Contractors are not held liable for loss of Government property. After release of the solicitation, who must be the focal point of any exchange with potential offerors? - ANSWER The contracting officer Feedback: See FAR 15.201(f) & FAR 15.303(c) When can a time-and-materials (T&M) contract be used? - ANSWER A T&M contract may be used only when it is not possible at the time of placing the contract to estimate accurately the extent or duration of the work or to anticipate costs Feedback: See FAR 16.601(c) One day after publicizing and releasing a solicitation, the contracting officer realizes that the contract line items need to be reorganized. The contracting officer must: - ANSWER Amend the solicitation, changing the contract line items Feedback: See FAR 15.206 What is a Procurement Instrument Identifier (PIID)? - ANSWER A unique number identifying each solicitation, contract, agreement, or order and related procurement instrument Feedback: See FAR 4.1603(a)(3) When using FAR part 12 procedures, the technical evaluation would normally include examination of such things as product literature, product samples (if requested), technical features, and: - ANSWER Warranty provisions Feedback: See FAR 12.602(b) Of the following, which is an acceptable venue to file a protest? - ANSWER The agency Feedback: See FAR 33.101 Joan stated that she was working on selecting solicitation provisions. With this in mind, you know the contract: - ANSWER Has not been awarded Feedback: See FAR 2.101 Which of the following statements best conveys the convention at FAR 1.108(b), delegation of authority? - ANSWER Each authority is delegable unless specifically stated otherwise Feedback: See FAR 1.108(b) What are the two types of contract modifications? - ANSWER Unilateral and bilateral Feedback: See FAR 43.103

Meer zien Lees minder
Instelling
CON 3990 FAR Parts
Vak
CON 3990 FAR Parts

Voorbeeld van de inhoud

CON 3990 FAR Parts Exam QUESTIONS
WITH CORRECT SOLUTIONS||100%
GUARANTEED PASS||UPDATED
2026/2027 SYLLABUS||A+
GRADED||<<NEWEST VERSION>>
In ensuring overall quality of items and services received under a contract, which
of the following is the responsibility of the Government? - ANSWER ✓ Quality
assurance surveillance
Feedback: See FAR subpart 46.1

What underlying principle should the contracting officer follow to avoid
organizational conflicts of interest? - ANSWER ✓ Prevent unfair competitive
advantage
Feedback: See FAR 9.505

Where in the FAR is contracting by negotiation covered? - ANSWER ✓ FAR part
15
Feedback: See FAR part 15

When a contractor submits a Certificate of Current Cost or Pricing data, it is
certifying that: - ANSWER ✓ The data submitted in support of a negotiations are
current, accurate, and complete.
Feedback: See FAR 15.406-2

Prenegotiation objectives: - ANSWER ✓ Establish the Government's initial
negotiation position
Feedback: See FAR 15.406-1(a)

Except when authorized otherwise, a Government contract: - ANSWER ✓ Must
be in writing
Feedback: See FAR 2.101, definition of a contract

,A contractor employee accidentally broke a test fixture that belongs to the
Government and is accountable to a Government contract. Generally speaking: -
ANSWER ✓ Contractors are not held liable for loss of Government property.

After release of the solicitation, who must be the focal point of any exchange with
potential offerors? - ANSWER ✓ The contracting officer
Feedback: See FAR 15.201(f) & FAR 15.303(c)

When can a time-and-materials (T&M) contract be used? - ANSWER ✓ A T&M
contract may be used only when it is not possible at the time of placing the contract
to estimate accurately the extent or duration of the work or to anticipate costs
Feedback: See FAR 16.601(c)

One day after publicizing and releasing a solicitation, the contracting officer
realizes that the contract line items need to be reorganized. The contracting officer
must: - ANSWER ✓ Amend the solicitation, changing the contract line items
Feedback: See FAR 15.206

What is a Procurement Instrument Identifier (PIID)? - ANSWER ✓ A unique
number identifying each solicitation, contract, agreement, or order and related
procurement instrument
Feedback: See FAR 4.1603(a)(3)

When using FAR part 12 procedures, the technical evaluation would normally
include examination of such things as product literature, product samples (if
requested), technical features, and: - ANSWER ✓ Warranty provisions
Feedback: See FAR 12.602(b)

Of the following, which is an acceptable venue to file a protest? - ANSWER ✓
The agency
Feedback: See FAR 33.101

Joan stated that she was working on selecting solicitation provisions. With this in
mind, you know the contract: - ANSWER ✓ Has not been awarded
Feedback: See FAR 2.101

, Which of the following statements best conveys the convention at FAR 1.108(b),
delegation of authority? - ANSWER ✓ Each authority is delegable unless
specifically stated otherwise
Feedback: See FAR 1.108(b)

What are the two types of contract modifications? - ANSWER ✓ Unilateral and
bilateral
Feedback: See FAR 43.103

Government contract types are grouped into two broad categories: fixed-price
contracts and: - ANSWER ✓ Cost-reimbursement contracts
Feedback: See FAR 16.101(b)

What part of the FAR covers terminations? - ANSWER ✓ FAR part 49
Feedback: See FAR part 49

Does the Government have the right to inspect a product before it is accepted? -
ANSWER ✓ Yes, always.
Feedback: See FAR 52.246-2

A program manager asked John whether a contract clause is only used in the
contract or if it applies to the solicitation as well. John correctly answered by
replying with which of the following statements? - ANSWER ✓ A contract clause
is a term or condition used in contracts, or in both solicitations and contracts, that
applies after contract award or both before and after award
Feedback: See FAR 2.101

The Government team is ready to request final proposal revisions. As a result, we
know that: - ANSWER ✓ Discussions have concluded
Feedback: See FAR 15.307(B)

Provisions and clauses should be incorporated by reference in solicitations and
contracts: - ANSWER ✓ To the maximum practical extent, rather than being
incorporated in full text
Feedback: See FAR 52.102(a)

Market research is conducted during which phase of acquisition? - ANSWER ✓
All phases of the acquisiton

, Feedback: See FAR 10.001(a)(2)(vi)

What would be the preferred way to acquire an item in Government contracting? -
ANSWER ✓ Purchase the requirement as a commercial item.
Feedback: See FAR 10.002(d)

What is the objective of a source selection? - ANSWER ✓ To select the proposal
that represents the best value
Feedback: See FAR 15.302

When holding discussions with offerors in a source selection, all the following
must be discussed EXCEPT: - ANSWER ✓ Price

You're administering a large dollar non-commercial weapons contract. The
contracting officer asks to see the Contract Data Requirements List (CDRL) in
Exhibit B. Which uniform contract format (UCF) section in your contract would
you refer to? - ANSWER ✓ Section J
Feedback: See FAR 14.201-4 & 15.204-4

Which of the following statements is accurate regarding the Government's policy
on contract modifications? - ANSWER ✓ Only contracting officers acting within
the scope of their authority are authorized to execute contract modifications on
behalf of the Government
Feedback: See FAR 43.102

Upon notice that a protest has been filed with the Government Accountability
Office (GAO), who must immediately begin compiling the information necessary
for a report to the GAO? - ANSWER ✓ The contracting officer
Feedback: See FAR 33.104(3)(i)

Which of the following reflects market research policy? Market research: -
ANSWER ✓ Aids in determining if sources capable of satisfying the agency's
requirements exist
Feedback: See FAR 10.001

During discussions, the contracting officer: - ANSWER ✓ Should discuss aspects
of an offeror's proposal if alterations or explanations would enhance the proposal's
potential for award

Geschreven voor

Instelling
CON 3990 FAR Parts
Vak
CON 3990 FAR Parts

Documentinformatie

Geüpload op
4 maart 2026
Aantal pagina's
35
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

€13,07
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
SmartscoreAaron Chicago State University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
79
Lid sinds
1 jaar
Aantal volgers
6
Documenten
4078
Laatst verkocht
1 dag geleden
SMARTSCORES LIBRARY

Get top-tier academic support for Psychology, Nursing, Business, Engineering, HRM, Math, and more. Our team of professional tutors delivers high-quality homework, quiz, and exam assistance—ensuring scholarly excellence and grade-boosting results. Trust our collaborative expertise to help you succeed in any course at U.S.A Institutions.

3,1

7 beoordelingen

5
3
4
1
3
0
2
0
1
3

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen