What size LDA must comply with stormwater management
M M M M M M M
regulation? in CPBA areas? - CORRECT ANSWER-anything of 1 acre
M M M M M M M M M M
or more, or 2500 ft^2 in CPBA areas; may be more stringent
M M M M M M M M M M M M
locally.
M
what are some activities exempt from SWM regulations? -
M M M M M M M M
CORRECT ANSWER-mining, agriculture, sewer discharges, local
M M M M M M
reclamation programs, routine maintenance of preexisting
M M M M M M
operations, public emergency activity
M M M M
what term basically means a plea deal for stormwater
M M M M M M M M
offenders? - CORRECT ANSWER-consent order, which replaces
M M M M M M M
penalties with fines.
M M M
how long does VSMP authority have to review SWM plan? -
M M M M M M M M M M
CORRECT ANSWER-15 days to review and determine approval, and
M M M M M M M M M
notify applicant.
M M
How often must a VSMP authority inspect an LDA? - CORRECT
M M M M M M M M M M
ANSWER-Periodically.
M
, all SWPPP requirements may be met by - CORRECT ANSWER-
M M M M M M M M M
incorporating other plans into reference, or by developing
M M M M M M M M
missing elements.
M M
What must the DEQ issue to an operator before an LDA? -
M M M M M M M M M M M
CORRECT ANSWER-a construction GP
M M M M
How soon after final grade of a site must vegetation be put in
M M M M M M M M M M M M
place? - CORRECT ANSWER-within 7 days.
M M M M M M
How long must operator keep routine inspection reports? -
M M M M M M M M
CORRECT ANSWER-At least 3 years after the GP expires/terminates.
M M M M M M M M M
How long does operator have to revise SWPPP if authority
M M M M M M M M M
deems it necessary? How long does local authority have to
M M M M M M M M M M
review any modifications to SWPPP? - CORRECT ANSWER-7 days for
M M M M M M M M M M
operator to make changes, 60 days for authority to review
M M M M M M M M M M
changes.
M
How long does operator have to notify DEQ of an unauthorized
M M M M M M M M M M
discharge? How long does operator have to make a written
M M M M M M M M M M
report of this? - CORRECT ANSWER-within 24 hours of discovery for
M M M M M M M M M M M
notification, within 5 days for written acknowledgement.
M M M M M M M
What constitutes a measurable rain event according to GP? -
M M M M M M M M M
CORRECT ANSWER-0.25 in. or more over 24 hours.
M M M M M M M M