Exam Questions and Verified
Answers | Already Graded A+
Balancing Authority A is importing MW and has a tie-line flowing into them
when the meter fails to zero. Which of the following statements is true?
a . The Balancing Authority's frequency will drop
b . The Balancing Authority's generators on AGC will decrease output
,c. The Balancing Authority's frequency will increase
d. The Balancing Authority's ACE reading will decrease - 🧠 ANSWER ✔✔b
. The Balancing Authority's generators on AGC will decrease output
Balancing Authority A has tie - line meter fail to zero on a line that is
exporting 200 MWs . Which of the following statements is true ?
a . The Balancing Authority's total demand indication will increase
b . The Balancing Authority's generators on AGC will decrease output
c . The Balancing Authority's frequency will decrease
d . The Balancing Authority's ACE reading will increase - 🧠 ANSWER ✔✔a .
The Balancing Authority's total demand indication will increase
How does a System Operator realize the power system is getting close to
the end of its available reactive resources ?
a. The voltage is increasing
b. The rate of decrease / increase of the voltage does not relate to change
in the load
,c. The rate of increase of the voltage decreases with the load
d . The rate of decrease of the voltage increases with the load - 🧠 ANSWER
✔✔d . The rate of decrease of the voltage increases with the load
Which of the following indications would result from a significant loss of
generation on an external BA ?
a. your ACE goes up and frequency stays the same
b. your ACE stays the same and frequency increases
c. your ACE stays the same and frequency decreases
d. your ACE goes down and frequency drops - 🧠 ANSWER ✔✔c. your ACE
stays the same and frequency decreases
You have restored a line to service after an outage . After shows no current
flow . What is your next action ? closing the line , one of the phases
a. Have the on - site crew open the line
b. Notify your RC
c. Call the crew that restored the line to check reading on each phase
COPYRIGHT©PROFFKERRYMARTIN 2025/2026. YEAR PUBLISHED 2026. COMPANY REGISTRATION NUMBER: 619652435. TERMS OF USE.
PRIVACY STATEMENT. ALL RIGHTS RESERVED
, d . Report RTU problem - 🧠 ANSWER ✔✔c. Call the crew that restored the
line to check reading on each phase
Which of the following would classify as an Operating Instruction ?
a. Requesting generator status from a Generator Operator
b. Discussing Operating Plan with an Adjacent Transmission Operator
c. Directing a Generator Operator to maintain current MVAR output of a
generator
d. Requesting outage information from a Distribution Provider - 🧠 ANSWER
✔✔c. Directing a Generator Operator to maintain current MVAR output of a
generator
After the winter morning peak , you have CTs base loaded unable to
decrease output and other units unable to regulate any lower . Nuclear
units are loaded and your solar is starting to pick up . ACE is trending up
and you have no regulation . What would you do ?
a . Take your CTs off-line