Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

CM 102 CHAPTERS 6-10 EXAM QUESTIONS ANSWERED CORRECTLY LATEST UPDATE 2026

Beoordeling
-
Verkocht
-
Pagina's
4
Cijfer
A+
Geüpload op
20-03-2026
Geschreven in
2025/2026

CM 102 CHAPTERS 6-10 EXAM QUESTIONS ANSWERED CORRECTLY LATEST UPDATE 2026 Why is team building essential in construction projects? - Answers Because projects create contractual relationships, involve different people each time, and individuals often have competing objectives and motivations. What are the two essentials for effective leadership? - Answers Communication and motivation. What builds trust on a project team? - Answers Past experience, competence, reliability, consistency, and shared values. What are the two big parts of communication? - Answers Request (asking for accountability) and Promise (agreeing to accountability). What is committed listening? - Answers Listening intently without judging and restating the speaker's views to confirm understanding. What is committed speaking? - Answers Speaking clearly with intention and specificity (clear what, when, and who). What is the fading AEC culture? - Answers Command and control. What is the gaining AEC culture? - Answers Transparency, collaboration, interdisciplinary teaming, and integration. What is the difference between management and leadership? - Answers You manage things; you lead people. What is an Integrated Project Leader (IPL)? - Answers The person primarily accountable for leading a design-build team with strong communication and emotional intelligence skills. In which delivery methods is preconstruction common? - Answers CM at Risk, Design-Build, and Integrated Project Delivery. What are the goals of preconstruction? - Answers Lower cost, improved schedule, higher quality, more innovation, and fewer RFIs. What is conceptual estimating? - Answers A Rough Order of Magnitude (ROM) estimate, typically +/- 20% accuracy. What is detailed estimating accuracy? - Answers Usually +/- 2-5% when documents are complete. What is Value Engineering (VE)? - Answers Reducing cost without sacrificing program needs. What is constructability review? - Answers Reviewing whether something can realistically be built efficiently and correctly. What is Life-Cycle Cost Analysis (LCCA)? - Answers Evaluating initial, maintenance, operating, and disposal costs over time. What is an estimate? - Answers A well-researched educated guess of probable project quantities and costs. What happens if an estimate is too low? - Answers The company may lose money and damage relationships. What are characteristics of a good estimator? - Answers Detail-oriented, reads plans well, visualizes construction, meets deadlines, works well under pressure. What are major factors impacting project costs? - Answers Size, complexity, location, time of construction, quality, market conditions, and management factors. What are the three types of estimates? - Answers Conceptual (ROM), Preliminary, and Detailed. What are direct costs? - Answers Bricks-and-mortar costs (labor, materials, subcontractor work). What are indirect costs? - Answers General conditions, overhead, insurance, bonds, profit. What are the three concerns when preparing an estimate? - Answers Quantities, pricing, and time. What is the Work Breakdown Structure (WBS)? - Answers The system that organizes estimate and schedule into work packages. What is contingency? - Answers A judgment-based allowance for unknown risks. Why is contract administration important? - Answers Poor administration is a main reason projects get in trouble. What is the purpose of the preconstruction conference? - Answers To establish rules, clarify communication lines, and coordinate logistics. What is an RFI? - Answers A formal Request for Information used to clarify design or document issues. What are submittals? - Answers Product data, shop drawings, and samples submitted for approval before installation. What are as-builts? - Answers Final drawings showing what was actually installed. What is retainage? - Answers A percentage of payment withheld to ensure project completion. What causes change orders? - Answers Owner changes, unforeseen conditions, design errors, weather, or material shortages. What are the four dispute resolution options? - Answers Mediation, arbitration, mini-trial, and full litigation. What are construction operations? - Answers The actual physical work of building (earthwork, concrete, framing, MEP, finishes). What does a superintendent manage? - Answers Subs, labor, materials, tools, equipment, inspections, safety, quality, and site logistics. What are the three scheduling axioms for subcontractors? - Answers Be 100% ready, ensure subs have what they need, pay them promptly. What reduces productivity? - Answers Poor coordination, crowded workspaces, weather, lack of supervision, confusing plans. Why is jobsite safety the top priority? - Answers Construction sites present constant risk of injury or death. What is SWPPP? - Answers Storm Water Pollution Prevention Plan. Why are daily logs important? - Answers Documentation protects you in disputes. What affects company image? - Answers Cleanliness, signage, professionalism, communication, and public relations. What is the field office? - Answers The command center of construction operations. What is commitment management? - Answers A leadership practice focused on making clear requests and promises so people are accountable for results. What is land entitlement? - Answers The legal approval process required from authorities before land can be developed. What is open book philosophy? - Answers A transparent approach where financial information is shared among project stakeholders. What is procurement? - Answers The process of obtaining materials, equipment, and services for a project. What is reliable promising? - Answers Making commitments you can realistically fulfill and consistently delivering on them. What is strategic foresight? - Answers The ability to anticipate future challenges and opportunities in planning. What is integrative thinking? - Answers Combining different perspectives to create better solutions. What is land development? - Answers Improving land for construction through planning, infrastructure, and approvals. What is enterprise? - Answers The organization or business entity responsible for delivering projects. What is vulnerability-based trust? - Answers Trust created when team members feel safe admitting mistakes or asking for help. What is capital expenditure? - Answers Money invested to acquire or improve long-term assets like buildings. What is a capital project? - Answers A large construction project treated as a long-term investment. What is a cost model? - Answers A financial representation used to estimate project costs. What is decommissioning? - Answers The process of shutting down and removing a facility at the end of its life. What is due diligence? - Answers Investigation and evaluation performed before committing to a project. What is a feasibility study? - Answers An analysis used to determine whether a project is viable. What is return on investment (ROI)? - Answers The financial gain compared to the amount invested. What are add-ons? - Answers Additional costs added to direct construction costs such as overhead and profit. What is a query list? - Answers A list of questions created by estimators about unclear drawings or specifications. What is a digitizer? - Answers A tool used to electronically measure quantities from plans. What is a scope sheet? - Answers A document defining work responsibilities for trades or subcontractors. What is lead time? - Answers The time required to obtain materials or equipment. What are quantity surveyors? - Answers Professionals who specialize in cost estimating and quantity measurement. What are work packages? - Answers Groups of related tasks within the work breakdown structure. Name three key members of the project team. - Answers Owner, designer (architect/engineer), contractor. List at least three factors that influence trust among team members. - Answers Past experience, competence, reliability, consistency, similarities or shared values. How is vulnerability-based trust related to accountability? - Answers When trust exists, team members feel safe being accountable and admitting mistakes.

Meer zien Lees minder
Instelling
CM 102
Vak
CM 102

Voorbeeld van de inhoud

CM 102 CHAPTERS 6-10 EXAM QUESTIONS ANSWERED CORRECTLY LATEST UPDATE 2026

Why is team building essential in construction projects? - Answers Because projects create
contractual relationships, involve different people each time, and individuals often have competing
objectives and motivations.
What are the two essentials for effective leadership? - Answers Communication and motivation.
What builds trust on a project team? - Answers Past experience, competence, reliability, consistency,
and shared values.
What are the two big parts of communication? - Answers Request (asking for accountability) and
Promise (agreeing to accountability).
What is committed listening? - Answers Listening intently without judging and restating the speaker's
views to confirm understanding.
What is committed speaking? - Answers Speaking clearly with intention and specificity (clear what,
when, and who).
What is the fading AEC culture? - Answers Command and control.
What is the gaining AEC culture? - Answers Transparency, collaboration, interdisciplinary teaming,
and integration.
What is the difference between management and leadership? - Answers You manage things; you lead
people.
What is an Integrated Project Leader (IPL)? - Answers The person primarily accountable for leading a
design-build team with strong communication and emotional intelligence skills.
In which delivery methods is preconstruction common? - Answers CM at Risk, Design-Build, and
Integrated Project Delivery.
What are the goals of preconstruction? - Answers Lower cost, improved schedule, higher quality,
more innovation, and fewer RFIs.
What is conceptual estimating? - Answers A Rough Order of Magnitude (ROM) estimate, typically +/-
20% accuracy.
What is detailed estimating accuracy? - Answers Usually +/- 2-5% when documents are complete.
What is Value Engineering (VE)? - Answers Reducing cost without sacrificing program needs.
What is constructability review? - Answers Reviewing whether something can realistically be built
efficiently and correctly.
What is Life-Cycle Cost Analysis (LCCA)? - Answers Evaluating initial, maintenance, operating, and
disposal costs over time.
What is an estimate? - Answers A well-researched educated guess of probable project quantities and
costs.
What happens if an estimate is too low? - Answers The company may lose money and damage
relationships.
What are characteristics of a good estimator? - Answers Detail-oriented, reads plans well, visualizes
construction, meets deadlines, works well under pressure.
What are major factors impacting project costs? - Answers Size, complexity, location, time of
construction, quality, market conditions, and management factors.
What are the three types of estimates? - Answers Conceptual (ROM), Preliminary, and Detailed.
What are direct costs? - Answers Bricks-and-mortar costs (labor, materials, subcontractor work).
What are indirect costs? - Answers General conditions, overhead, insurance, bonds, profit.
What are the three concerns when preparing an estimate? - Answers Quantities, pricing, and time.
What is the Work Breakdown Structure (WBS)? - Answers The system that organizes estimate and
schedule into work packages.
What is contingency? - Answers A judgment-based allowance for unknown risks.
Why is contract administration important? - Answers Poor administration is a main reason projects
get in trouble.
What is the purpose of the preconstruction conference? - Answers To establish rules, clarify
communication lines, and coordinate logistics.
What is an RFI? - Answers A formal Request for Information used to clarify design or document
issues.
What are submittals? - Answers Product data, shop drawings, and samples submitted for approval
before installation.
What are as-builts? - Answers Final drawings showing what was actually installed.

Geschreven voor

Instelling
CM 102
Vak
CM 102

Documentinformatie

Geüpload op
20 maart 2026
Aantal pagina's
4
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

€10,15
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
TutorJosh Chamberlain College Of Nursing
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
444
Lid sinds
1 jaar
Aantal volgers
16
Documenten
31781
Laatst verkocht
2 dagen geleden
Tutor Joshua

Here You will find all Documents and Package Deals Offered By Tutor Joshua.

3,5

73 beoordelingen

5
26
4
16
3
14
2
1
1
16

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen