CM 102 FINAL EXAM QUESTIONS WITH VERIFIED SOLUTIONS LATEST UPDATE 2026 What is the name of the stone carving dating back to the pyramids that contained the first written regulation pertaining to construction. (first known building code) - Answers Code of Hammurabi By what specific Measurement is construction used as an economic indicator for the US economy? - Answers Housing starts Five primary sectors of the construction industry - Answers Residential, Commercial, Heavy Civil, Industrial, and Environmental Construction What is the name of the organization credited with promoting construction management as a legitimate and unique area of study at four-year universities? - Answers Associated Schools of Construction (ASC) What is the role of the owner on a construction project? - Answers Developing the program for the building, define the scope of the project, create the budget, and provide the funding for the project. What is the name of the weekly magazine dedicated solely to the construction industry? - Answers Engineering News Record What does LEED stand for, and what is its purpose? - Answers Leadership in Energy and Environmental Design, it rates a building's environmental performance over its life cycle. What is lean construction and form what industry does its concepts stem? - Answers Philosophy that focuses on adding value with less work and the elimination of waste in the building process stemming from the manufacturing industry. Construction Management Function - Answers Entails various tasks performed by the contractor like estimating, scheduling, cost control, and contract administration to monitor, manage, and control the work of the contract. Construction Management Project Delivery Method - Answers Contractual arrangement where the CM is hired by the owner to provide services to the owner, such as design review, overall scheduling, cost control, value engineering, constructibility reviews, and construction coordination. Identify 3 characteristics that make the construction project unique from other industry sector projects. - Answers One-of-a-kind structure, built on a different and unique site, takes place outside, buy human hand, the labor force is large and made up of workers that move job to job. Four primary project values to be managed, monitored, and controlled. - Answers Time, Cost, Quality, and Safety Why is scope definition so important? - Answers It describes the extent of the work that is to be preformed by the contractor. What is the term project delivery? - Answers Overall structural framework used to put all the aspects of designing and building a construction project together. 3 Primary project delivery methods and discuss how they differ contractually. - Answers Design-Bid-Build: owner how separate contracts with the designer and the contractor Design-Build: one contract between the owner and the design-build entity for both the design and the construction Construction Management: owner has three contracts with the CM, designer, and contractor Agency CM vs At-Risk CM - Answers Difference is in who is responsible for performing the actual work of the contract Agency: the CM has no liability of the construction and acts as an advisor to the owner At-Risk: CM acts as an advisor during the design process and is liable for construction Fast Tracking - Answers Technique to speed up the completion of a construction project by overlapping the design and construction processes. Three ways a Design-Build entity can be configured - Answers Informal Partnership between designer and contractor, full-service design-build firm working from the same company, or a legal joint where they work on a single project together. Identify the eight functions of construction management. - Answers Estimating the project, contract administration, managing job site and construction operations, planning and scheduling the project, controlling project performance, managing project quality, managing project safety, and managing project risks. Why is open bidding required on public projects? - Answers Taxpayer dollars are at stake, an open bid allows any contractor to submit reducing fraud, favoritism, and undue influence and reassuring taxpayers that their tax dollars are being spent properly. A tool used to limit/reduce the number of bids on a public project and increase the quality of the pool. - Answers Prequalification statement What is the purpose of a labor and materials payment bond? - Answers It's a guarantee that payment for the contractor's labor and materials used on the project will be made. Identify the notice document that informs the public of upcoming construction projects funded with taxpayer dollars. - Answers Advertisement for bids, posted electronically or in newspapers and magazines. 3 Selection methods used to buy construction services and identify the solicitation industry used for each one. - Answers Low-bid selection (advertisement for bids), best-value selection (request for proposals), and qualifications-based selection (request for qualifications) Which procurement method is the most commonly used today and what is the selection criteria used to determine the winner? - Answers Design-Bid-Build, low price What is the name of the official document that the owner uses to notify the contractor to start construction? - Answers Notice to Proceeed 2 Primary selection criteria categories considered when using the best-value method. - Answers Price (quantitative) and Qualification (design, management, and past performance) Describe how the weighted criteria works. - Answers A form of best-value selection in which maximum point values are pre established for qualitative and price components and award is based upon high total points earned by the proposers for both components. What 2 major components make up the contract documents? - Answers Drawings and Project Manual When did architects first begin to use drawings to communicate their design intent? - Answers Renaissance (drawings rather than models) CAD - Answers Computer-Aided Design How are drawing organized in a set of drawings? - Answers Civil, architectural, structural, mechanical, and electrical drawings 4 Primary sections of a project manual. - Answers Bidding documents, the general conditions, the supplemental conditions, and the technical conditions. Divisions in CSI MasterFormat (2004) - Answers 48 (49 including division 00) 4 Basic types of construction contracts - Answers Lump-sum, Cost-plus-fee, Guaranteed maximum price, and Unit-price contract. Under a GMP contract, what happens if the actual cost is less than the guaranteed maximum price? - Answers The owner benefits from 100% of the savings unless there is an arrangement to split the savings with the contractor. 4 Fundamental stages of the construction management process after the design stage. - Answers Pre-construction, Procurement, Construction, and Post-construction 4 distinct stages of the design process. - Answers Programming and Feasibility, Schematic or Conceptual Design, Design Development, and Contract Documents How does the quality of the design documents impact the quality of the construction? - Answers The contractor is obligated to preform or bring the flaws to the attention of the architect through a change order. The owner must pay the price of the error. Due Diligence - Answers Process of identifying any problems associated with the project early on so that those problems can be factored into the decisions during pre-construction. 2 Procurement instruments used to buy out the construction job? - Answers Subcontractors and Purchase orders. 3 Positions that make-up the members of the on-site construction management team. - Answers Superintendent, assistant superintendent, and field engineer What marks the official end of the project? - Answers When the architect releases a certificate of substantial completion. What is the tool used to keep track of and manage the completion of all of the loose ends, minor repairs, adjustments, and missing items at the end of the project? - Answers Punch List Value Engineering - Answers Process of analyzing the design, products, and materials associated with the project to determine whether the proposed application, installation, or execution is the best approach or solution to optimize resources to achieve the greatest value for the money being spent. Why is it important to have a clear distinction between the project punch out and the warranty period? - Answers The completion of punch out denotes substantial completion of the project. If work items continue to get added to the punch list, it will be very difficult to clearly mark the end of the project. What is a construction estimate? - Answers Summary of probable quantities and costs of materials, labor, equipment, and subcontracts to complete a project (taxes, overhead, and profit) 4 Primary categories of costs in the construction estimate. - Answers Materials, Labor, Equipment, and Subcontractors Ballpark Estimate - Answers ROM (Rough Order of Magnitude) 4 Preparations steps taken to start the estimation process. - Answers Review the plans and specs, to develop a query list, to attend the pre bid meeting, and to visit the site General Conditions - Answers (Indirect Costs) Represent the expenses incurred in order to deliver and manage the materials, labor, equipment, and subcontractors employed on any given job (supervision, cleanup, utilities, fencing etc.) What unit of measurement is typically employed for pricing general conditions? - Answers Time What is a scope sheet? - Answers Identifies all of the items of work to be preformed under a specific trade heading or work category. Identify at least 4 characteristics exhibited in a quality estimate. - Answers Correct quantities, accurate labor hours, correct pricing, accurate calculations, completeness, clear paper trail, proper overhead, and proper profit. When will you know the accuracy of your estimate? - Answers When the project is complete and everything is added up. Partnering - Answers A team-building technique to establish a set of common goals and objectives for the project and develop a mutually acceptable protocol for communication and conflict resolution through a formal agreement. How does the contractor receive clarification from the architect regarding details of the design? - Answers Request for Information (RFI) What is the purpose of a submittal? - Answers A way for the architect and owner can confirm the intent of the design. What is a shop drawing? - Answers Type of submittal, required when a building material must be fabricated form scratch. What is the name of the document that establishes the template for measuring work progress as it relates to requests for payment? - Answers Schedule of Vaules What is the name of the document that formally and officially authorizes a payment to the contractor? - Answers Application and Certificate of Payment What are liquidated damages? - Answers An amount of money that is assessed to the contractor for a failure to meet a specified competition date. What is retainage? - Answers Certain percentage of money owed to the contractor that is held back by the owner to encourage completion of the project. 2 Instances when a change order might need to be initiated. - Answers To correct the detail of the design that contained an error or omission When and owner wants to add scope to the project 3 Alternative to traditional litigation for resolving construction contract disputes. - Answers Mediation, Minitrial, and Arbitration 3 Issues that the superintendent must be concerned with when trying to manage construction operations. - Answers Subcontractor coordination, material and equipment deliveries, and productivity 3 Fundamental rules of scheduling subcontractors. - Answers Resist bringing subcontractors onto the job until you are 100% ready for them. Make sure that once you bring them on the job, they have everything they need. Pay all subcontractors promptly upon completion of their work. What does it mean to order something on will-call? - Answers Confirmation of an order that has been placed prior to the date it is actually due for delivery. 3 Factors that can negatively impact construction productivity. - Answers Crowded work spaces, poor coordination or work activities, poor supervision, inexperienced workforce, not having the proper tools, adverse weather conditions, confusing plans and specs, changes in the work plan, and inefficient job site layout.

Meer zien Lees minder
Instelling
CM 102
Vak
CM 102

Voorbeeld van de inhoud

CM 102 FINAL EXAM QUESTIONS WITH VERIFIED SOLUTIONS LATEST UPDATE 2026

What is the name of the stone carving dating back to the pyramids that contained the first written
regulation pertaining to construction. (first known building code) - Answers Code of Hammurabi
By what specific Measurement is construction used as an economic indicator for the US economy? -
Answers Housing starts
Five primary sectors of the construction industry - Answers Residential, Commercial, Heavy Civil,
Industrial, and Environmental Construction
What is the name of the organization credited with promoting construction management as a
legitimate and unique area of study at four-year universities? - Answers Associated Schools of
Construction (ASC)
What is the role of the owner on a construction project? - Answers Developing the program for the
building, define the scope of the project, create the budget, and provide the funding for the project.
What is the name of the weekly magazine dedicated solely to the construction industry? - Answers
Engineering News Record
What does LEED stand for, and what is its purpose? - Answers Leadership in Energy and
Environmental Design, it rates a building's environmental performance over its life cycle.
What is lean construction and form what industry does its concepts stem? - Answers Philosophy that
focuses on adding value with less work and the elimination of waste in the building process stemming
from the manufacturing industry.
Construction Management Function - Answers Entails various tasks performed by the contractor like
estimating, scheduling, cost control, and contract administration to monitor, manage, and control the
work of the contract.
Construction Management Project Delivery Method - Answers Contractual arrangement where the
CM is hired by the owner to provide services to the owner, such as design review, overall scheduling,
cost control, value engineering, constructibility reviews, and construction coordination.
Identify 3 characteristics that make the construction project unique from other industry sector
projects. - Answers One-of-a-kind structure, built on a different and unique site, takes place outside,
buy human hand, the labor force is large and made up of workers that move job to job.
Four primary project values to be managed, monitored, and controlled. - Answers Time, Cost,
Quality, and Safety
Why is scope definition so important? - Answers It describes the extent of the work that is to be
preformed by the contractor.
What is the term project delivery? - Answers Overall structural framework used to put all the aspects
of designing and building a construction project together.
3 Primary project delivery methods and discuss how they differ contractually. - Answers Design-Bid-
Build: owner how separate contracts with the designer and the contractor
Design-Build: one contract between the owner and the design-build entity for both the design and the
construction
Construction Management: owner has three contracts with the CM, designer, and contractor
Agency CM vs At-Risk CM - Answers Difference is in who is responsible for performing the actual work
of the contract
Agency: the CM has no liability of the construction and acts as an advisor to the owner
At-Risk: CM acts as an advisor during the design process and is liable for construction
Fast Tracking - Answers Technique to speed up the completion of a construction project by
overlapping the design and construction processes.
Three ways a Design-Build entity can be configured - Answers Informal Partnership between designer
and contractor, full-service design-build firm working from the same company, or a legal joint where
they work on a single project together.
Identify the eight functions of construction management. - Answers Estimating the project, contract
administration, managing job site and construction operations, planning and scheduling the project,
controlling project performance, managing project quality, managing project safety, and managing
project risks.
Why is open bidding required on public projects? - Answers Taxpayer dollars are at stake, an open bid
allows any contractor to submit reducing fraud, favoritism, and undue influence and reassuring
taxpayers that their tax dollars are being spent properly.

, A tool used to limit/reduce the number of bids on a public project and increase the quality of the
pool. - Answers Prequalification statement
What is the purpose of a labor and materials payment bond? - Answers It's a guarantee that payment
for the contractor's labor and materials used on the project will be made.
Identify the notice document that informs the public of upcoming construction projects funded with
taxpayer dollars. - Answers Advertisement for bids, posted electronically or in newspapers and
magazines.
3 Selection methods used to buy construction services and identify the solicitation industry used for
each one. - Answers Low-bid selection (advertisement for bids), best-value selection (request for
proposals), and qualifications-based selection (request for qualifications)
Which procurement method is the most commonly used today and what is the selection criteria used
to determine the winner? - Answers Design-Bid-Build, low price
What is the name of the official document that the owner uses to notify the contractor to start
construction? - Answers Notice to Proceeed
2 Primary selection criteria categories considered when using the best-value method. - Answers Price
(quantitative) and Qualification (design, management, and past performance)
Describe how the weighted criteria works. - Answers A form of best-value selection in which
maximum point values are pre established for qualitative and price components and award is based
upon high total points earned by the proposers for both components.
What 2 major components make up the contract documents? - Answers Drawings and Project
Manual
When did architects first begin to use drawings to communicate their design intent? - Answers
Renaissance (drawings rather than models)
CAD - Answers Computer-Aided Design
How are drawing organized in a set of drawings? - Answers Civil, architectural, structural, mechanical,
and electrical drawings
4 Primary sections of a project manual. - Answers Bidding documents, the general conditions, the
supplemental conditions, and the technical conditions.
Divisions in CSI MasterFormat (2004) - Answers 48 (49 including division 00)
4 Basic types of construction contracts - Answers Lump-sum, Cost-plus-fee, Guaranteed maximum
price, and Unit-price contract.
Under a GMP contract, what happens if the actual cost is less than the guaranteed maximum price? -
Answers The owner benefits from 100% of the savings unless there is an arrangement to split the
savings with the contractor.
4 Fundamental stages of the construction management process after the design stage. - Answers Pre-
construction, Procurement, Construction, and Post-construction
4 distinct stages of the design process. - Answers Programming and Feasibility, Schematic or
Conceptual Design, Design Development, and Contract Documents
How does the quality of the design documents impact the quality of the construction? - Answers The
contractor is obligated to preform or bring the flaws to the attention of the architect through a
change order. The owner must pay the price of the error.
Due Diligence - Answers Process of identifying any problems associated with the project early on so
that those problems can be factored into the decisions during pre-construction.
2 Procurement instruments used to buy out the construction job? - Answers Subcontractors and
Purchase orders.
3 Positions that make-up the members of the on-site construction management team. - Answers
Superintendent, assistant superintendent, and field engineer
What marks the official end of the project? - Answers When the architect releases a certificate of
substantial completion.
What is the tool used to keep track of and manage the completion of all of the loose ends, minor
repairs, adjustments, and missing items at the end of the project? - Answers Punch List
Value Engineering - Answers Process of analyzing the design, products, and materials associated with
the project to determine whether the proposed application, installation, or execution is the best
approach or solution to optimize resources to achieve the greatest value for the money being spent.
Why is it important to have a clear distinction between the project punch out and the warranty
period? - Answers The completion of punch out denotes substantial completion of the project. If

Geschreven voor

Instelling
CM 102
Vak
CM 102

Documentinformatie

Geüpload op
20 maart 2026
Aantal pagina's
6
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

€10,15
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
joshuawesonga22 Liberty University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
101
Lid sinds
1 jaar
Aantal volgers
1
Documenten
14186
Laatst verkocht
1 dag geleden
Tutor Wes

Hi there! I'm Tutor Wes, a dedicated tutor with a passion for sharing knowledge and helping others succeed academically. All my notes are carefully organized, detailed, and easy to understand. Whether you're preparing for exams, catching up on lectures, or looking for clear summaries, you'll find useful study materials here. Let’s succeed together!

3,9

9 beoordelingen

5
4
4
1
3
3
2
1
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen