100% VERIFIED ANSWERS | LATEST UPDATE 2026
| GRADED A+ | GUARANTEED PASS!!
A class A license is required when a single contract is worth more than?
- answer-$120,000.00
A construction project does not require inspection if the cost is less this maximum
amount.
- answer-$2500
A contractor does not notify a change of address and so does not receive a timely
Notice of Renewal. Who is responsible for when the contractor does not renew his
license on time?
- answer-The Licensee Contractor
A contractor is required to submit a renewal within____ days of the expiration
date?
- answer-30
A contractor must apply for reinstatement rather than renewal if the renewal
application and fee are not submitted within how many days of expiration?
- answer-30 days
A copy of the building permit must be
- answer-posted at the site
A designated employee must work a minimum of how many hours for licensed
contracting business?
- answer-30 Hours
A Designated Employee should be?
- answer-At least 18, Full Time, Passed Required Exams
A license was issued on 10/15/2003. The expiration date is?
- answer-10/31/2005
, A new building may be used after ______________ is issued.
- answer-certificate of occupancy
A notification that funds are due is issued, but the funds are not paid. After a
second notice, the funds must be paid in ______ days. If there is still no payment,
then the license is ____________.
- answer-30 days, Suspended
A permit has been issued and construction is underway. The inspection must take
place in?
- answer-six months
Accrual Basis Accounting
- answer-reporting income when it is earned
After notification by the code official, an application for a permit shall be
considered to have been abandoned for _____ months
- answer-6
All of the following are required on a written contract EXCEPT
- answer-permit numbers
An appeal of the local building officials decision to refuse to grant a modification
to the USBC MUST be made within how many days?
- answer-90 Days
An Erosion control conservation plan needs to be approved within ____ days.
- answer-45
An erosion control conservation specification needs to be approved within_____
days
- answer-60 days
An owner wantsa swimming pool built in a specified location,. The location is in
violation of the local code. The contractor should.
- answer-Not agree to build the pool
Any issued permit shall become invalid if work is not commenced within
_________ Months after issuance.
- answer-6 Months