ESD Maintenance Supervisor duties correct answers 1.) Schedule/Unscheduled Maintenance for
ESD, C4IT assets w/in AOR is complete.
2.) Oversee ESD test equipment and tool calibration program.
RPQ 6.1.3
MDL (Maintenance Due List) step 2: correct answers Click on "Decision Support System"
(DSS) 4.5
RPQ 6.1.3.2
Noise exposure data must be kept for how long? correct answers For the duration of employment
plus 30 years.
RPQ 6.3.1.1
Areas or equipment where the sound pressure levels are _____(A) or greater, but LESS THAN
______dB(A), must be labeled and must require the use of single protection. correct answers
85....96
The QA Inspector must be recommended by their ______ ___________ _________________
correct answers ESD Maintenance Supervisor
C4IT assets without personnel assigned such as DGPS or R21 requires _______ travel card(s) for
the entire trip. correct answers ONE (1)
MS submits completed MPC's to Sector CMM...local MPC copies must be maintained on file for
a minimum of ________ ______ correct answers One Year
Technicians shall not work alone when performing maintenance on any energized equipment
where voltages in excess of ____ volts exist. correct answers 30
,AFC-____ funds to procure crane, dive or other services for the repair and/or replacement of
Coast Guard owned electronic equipment. correct answers 42
AFC-_____ funds for repair/replacement of Navy Type-Navy Owned electronic equipment.
correct answers 80
At NO TIME is the ESD authorized to install, de-install or modify a unit's standard configuration
without the ___________ _________ ____________ approval. correct answers Product Line
Manager's
All large work request's requiring _______ labor hours or more to complete shall be forwarded
to _____________ correct answers 30....C4ITSC-FSD
Maintenance/Publication Feedback Form (________) is used for initiating changes to technical
manuals, publications, MPC's, or other technical data. correct answers CG-22
_______________ __________________ ___________ (_________) discrepancies are generally
found during an Electronic Technical Assessment (ETA) and require extensive work to correct
correct answers Carried Forward Depot (CFD)
Technicians on cutters 175-foot and greater shall use the "_______ _______" field to request
Depot technical assistance or C4IT and Navy parts. correct answers C4IT Assist
All bonds for ground conductors whose primary function is to provide a path for power, control
or signal currents, and lightning protection shall have a maximum dc resistance of
___________(______) correct answers 1 milliohm (.oo1 Ohms)
If an intentional protective coating is removed from the metal surface, the mating surfaces shall
be joined within _____ minutes after cleaning. correct answers 30
,Filters on power control and signal lines shall be placed ____ _______ _____ ___________ to
the point of penetration of the case in order to avoid long, unprotected paths inside the
equipment. correct answers as close as possible
High voltage warning and danger signs shall be posted conspicuously , generally at eye level, on
equipment containing more than _______volts aboard CUTTERS and on equipment containing
more than ______volts at SHORE facilities. correct answers 1000....600
The Coast Guard currently uses three types of batteries (1)________ _______ (2)__________
____________ and (3)______________ correct answers Lead Acid......Nickel
Cadmium.....Lithium
Units must label designated hazardous noise areas and equipment that produce sound levels
______dB(A) or greater. correct answers 85
Type _____ warning sign advises personnel of an RF hazard and shall be posted at the boundary
(PEL line) of an area... correct answers 1
Type ____ warning sign informs personnel that an RF hazard exists and to check with command
authority prior to fueling operations. correct answers 4
Type ______ Warning Sign excludes personnel from proceeding past a designated point. correct
answers 2
Type ______ warning sign informs personnel that contact current and/or RF burn hazards may
exist on metallic objects in this area. correct answers 3
Type ______ warning sign provides a blank area in which special instructions necessary for safe
operations can be specified. correct answers 5
, The CG Test Equipment Petty Officer (TEPO) must validate ETE calibrate stickers every
_______ ____________ correct answers 6 months
The TEPO shall submit a survey report for any missing test equipment above $_______ correct
answers $25K
Report of survey form CG-_________ correct answers 5269
The SCAT Code is based on _______________, not manufacturers. correct answers capabilities
Priority of _____ or _______ (obsolete or nearing the end of service life) correct answers 72....95
________ and _________ shall be stored separately from FSTER and Non-SCAT coded test
equipment. correct answers GPETE......SPETE
Test equipment calibration is organizational level maintenance and is ______-______ funded.
correct answers AFC-30
All test equipment shall be tracked within _________ correct answers FLS
The only navy type/navy owned (NTNO) special purpose electronic test equipment (SPETE)
deployed by the USCG is the ETE that supports the ____________ correct answers IFF -
identification, friend or foe
A DC bond resistance should measure about __________ohm or better correct answers .001
If lost ETE is listed on the _____________ and the cost is above __________ in value the TEPO
shall complete a USCG Form _____________ correct answers SPETERL......$25K..........CG-
5269