Voorbeeld van de inhoud

CSLB Concrete C8 License Practice Test #1
Questions With Correct Answers


What is the volume of a cylinder if the diameter equals 3 feet and the length
| | | | | | | | | | | | | | | |


equals to 12 feet? - CORRECT ANSWER✔✔-84.78 cubic feet
| | | | | | | |




Explanation:
There are two ways to solve the problem. However, regardless of which method is
| | | | | | | | | | | | |


|used, you need to first determine the area of the circle then multiply it by the
| | | | | | | | | | | | | | | |


length.Traditional MethodUse the following formula:Area of the circle = π x r x | | | | | | | | | | | | |


rWhere π = 3.14 and radius (r) = 1.5 feet (half of the diameter length)Area = 3.14
| | | | | | | | | | | | | | | | |


x 1.5 x 1.5Area = 7.065 sq. ft.Multiply area by the length to find the volume.7.065
| | | | | | | | | | | | | | |


|x 12 = 84.78Shortcut MethodArea of the circle is 78.5% of the square. Treat the
| | | | | | | | | | | | | | |


circle as a square and solve for the area.Find the area of the square instead of the
| | | | | | | | | | | | | | | |


|circle.3' x 3' = 9 sq. ft.Since circle is 78.5% of the square, multiply area of the
| | | | | | | | | | | | | | | | |


square by 78.5% (or .785 if there is no percentage sign on the calculator).9 sq. ft.
| | | | | | | | | | | | | | | |


x .785 = 7.065 square feetMultiply area by the length to find the volume.7.065 x
| | | | | | | | | | | | | | |


12 = 84.78 cubic feet
| | | |




Where are spiral rebar ties used? - CORRECT ANSWER✔✔-In round columns
| | | | | | | | | |




Control joints in sidewalks should be spaced at what intervals? - CORRECT
| | | | | | | | | | | |


ANSWER✔✔-Equal to the width of the slab | | | | | |




Explanation:

,Generally the control joints in sidewalks should be spaced equal to the width of
| | | | | | | | | | | | | |


the slab, but not more than 6 feet apart.
| | | | | | | |




One cubic foot of cement weighs approximately: - CORRECT ANSWER✔✔-95 lbs
| | | | | | | | | |




How many cubic yard of concrete is required for a 4" slab with the diameter of 15
| | | | | | | | | | | | | | | |


feet? - CORRECT ANSWER✔✔-2 ½ cubic yards
| | | | | | |




Explanation:
Traditional MethodUse the following formula:Area of the circle = π x r x rWhere π
| | | | | | | | | | | | | |


|= 3.14 and radius (r) = 7.5 feet (half of the diameter length)Area = 3.14 x 7.5 x
| | | | | | | | | | | | | | | | | |


7.5Area = 176.625 sq. ft.Multiply area by the depth of the slab (in feet) to find the
| | | | | | | | | | | | | | | |


|volume in cubic feet.176.625 x .333 = 58.82 cubic feetConvert cubic feet into
| | | | | | | | | | | | |


cubic yards.58.82 ÷ 27 = 2.18 cubic yardsSince 2.18 is not a given option, round
| | | | | | | | | | | | | | |


up the number to 2.5 cubic yardsShortcut MethodThis problem can be solved
| | | | | | | | | | | |


using a much simpler method. First is to find the area of the square, then convert
| | | | | | | | | | | | | | | |


it into the area of the circle by multiplying it by 78.5%.Area of the square = 15' x
| | | | | | | | | | | | | | | | | |


15' = 225 square feetArea of the circle = 225 x .785 = 176.625 square feetDivide
| | | | | | | | | | | | | | | |


the volume by 81 to solve for the cubic yards for a 4" slab.176.625 ÷ 81 = 2.18
| | | | | | | | | | | | | | | | | |


cubic yardsSince 2.18 is not a given option, round up the number to 2.5 cubic
| | | | | | | | | | | | | | |


yards


The normal tolerance for the location of bends and ends of reinforcing bar is: -
| | | | | | | | | | | | | | |


CORRECT ANSWER✔✔-+/- 2 inches | | |




How many cubic yards of backfill are required for a 3' x 5' trench, 1500 ft long,
| | | | | | | | | | | | | | | | |


with a 1 foot diameter pipe? - CORRECT ANSWER✔✔-789.72
| | | | | | | |

, Explanation:
Step 1. Find the net face area of the trench deducting for pipe.Face area including
| | | | | | | | | | | | | |



pipe: 3 x 5 = 15 square feetArea of the pipe: 𝐴=𝜋𝑟2A = 3.14 x .5 x .5A = 0.785Find
| | | | | | | | | | | | | | | | | | | |


the face area of the trench minus area of the pipe, which will give you the net
| | | | | | | | | | | | | | | | | |


area for the backfill.15 - 0.785 = 14.215Step 2. Find the total volume of the
| | | | | | | | | | | | | | |


backfill.14.215 x 1500 = 21322.5 cubic feetConvert the volume into cubic | | | | | | | | | | |


yards.21322.5 ÷ 27 = 789.72 cubic yards | | | | | |




When can the live load be calculated by multiplying the height, width and length
| | | | | | | | | | | | | |


of a pour and dividing by the deadload? - CORRECT ANSWER✔✔-Never
| | | | | | | | | |




Tensile strength in concrete is achieved by: - CORRECT ANSWER✔✔-The use of
| | | | | | | | | | | |


steel reinforcement.
|




Refer to the house plan. What is the total cost for the foundation slab if the
| | | | | | | | | | | | | | | |


contractor charges $3.54 per square foot? - CORRECT ANSWER✔✔-$6524.90
| | | | | | | |




Explanation:
The easiest way to solve for the area of the slab is to image a full rectangle of the
| | | | | | | | | | | | | | | | | | |


slab and subtract void areas from the area of the slab.
| | | | | | | | | |




Rectangle area: 28.167' x 71.5'= 2013.94 sq ftLeft void area: 6.667' x 1.83' = 12.2
| | | | | | | | | | | | | | |


sq ftCenter void area: 11.5' x 1.83' = 21.045 sq ftRight void area: 9.167' x 15' =
| | | | | | | | | | | | | | | | |


137.505Net area of the foundation slab: 2013.94 - 12.2 - 21.045 - 137.505 =
| | | | | | | | | | | | | |


1843.19 sq ft.Calculate the price of the slab.1843.19 sq ft x $3.54 = $6524.90
| | | | | | | | | | | | |

Geschreven voor

Instelling
CSLB Concrete C8 License
Vak
CSLB Concrete C8 License

Documentinformatie

Geüpload op
5 april 2026
Aantal pagina's
20
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

€15,52
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Lectphilip West Virginia University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
242
Lid sinds
1 jaar
Aantal volgers
6
Documenten
23135
Laatst verkocht
11 uur geleden
WELCOME TO LECTPHILIP, A PLACE WHERE WE UNLOCK YOUR ACADEMIC OPPORTUNITIES

On this page, you find all documents, package deals and flashcards offered by seller lectphilip

4,0

41 beoordelingen

5
20
4
8
3
9
2
2
1
2

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen