1. Which of the following is considered duty cycle work?
a. Pile- driving
b. Setting trusses
c. Clam - Shell digging
d Unloading trucks - ANSWER-c.
2. When doing cycle work, the load chart must be reduced by how
much?
a. 50%
b. 20%
c. 30%
d. none - ANSWER-b.
3. Which components are not parts of the boom?
a. Lacing
,2|Page
b. Cords
c. Cross members
d. Heel pins - ANSWER-d.
Where must the operator's manual be kept during crane
operations? - ANSWER-The operator's manual must be kept in
the cab at all times.
According to ASME B30.5, what are the minimal requirements to
meet crane operatorqualifications? - ANSWER-Physical, Written
Test, Practical Test
What hand signal must be obeyed at all times? - ANSWER-Stop
When removing pins or bolts from a boom assembly, workers
shall remain _________________. - ANSWER-out from under the
boom
When may a crane be overloaded? - ANSWER-Never
,3|Page
When can the operator leave the crane? - ANSWER-After
securing the crane
When can a crane be side loaded? - ANSWER-With a freely
suspended load
The deflection of a boom will cause the load to
__________________________. - ANSWER-increase the radius
. What action does a signal person intend the operator to perform
if he extends his arm at shoulder height, makes a fist with his
hand, and sticks his/her thumb up?
a. Boom down
b. Swing
c. Boom up
d. Extend boom - ANSWER-c.
. When hoisting personnel, within what percentage of level must a
telescopic boom crane be in order for the gross ratings in the load
chart to remain valid?
, 4|Page
a. 1%
b. 2%
c. 5%
d. 8% - ANSWER-a.
. The load line of the crane you're operating contacts an
energized power line. There's no sign of any other danger, such
as fire. What should you do?
a. Climb down carefully from the crane cab
b. Jump down, feet together
c. Stay in the cab until the lines are de-energized
d. Get as far away from the crane as possible - ANSWER-c.
According to OSHA 1926.1413, how many randomly distributed
broken wires in rotation-resistant rope are cause for replacement
of the rope?
a. 1 broken wire in 6 rope diameters
b. 2 broken wires in 30 rope diameters
c. 3 broken wires in one strand in one lay