Advanced Law of Contract Lecture 8 18/11/19



Breakdown and Liability
Discharge of a contractual obligation:
 Agreement
 Performance
 Breach
 Frustration

Discharge by agreement

 Valid ONLY if freely consented by all parties, ie party to be released provides consideration
for the other party’s promise to release him:
• Bilateral discharge- consideration
• Unilateral discharge – deed, waiver, estoppel

Discharge by performance

 Exact performance
 Not exact performance
• Discharge depends on whether the term is a condition (we will return to this)
• Discharge depends on whether the obligation demands performance as a whole, or
whether severance is possible

 Entire obligation: must be fully performed for discharge (or breach of condition)
 Severable obligation: obligations separate from each other (or breach of warranty)
 Discharge possible if is ‘substantial performance’
o Hoenig v Isaacs [1952] 2 All ER 176
o In relation to ‘entire’ obligations there is no scope for ‘substantial performance’ –
SWI Ltd v P&I Data Services Ltd [2007] EWCA Civ 663

Discharge by breach

 Breach may discharge the other party from their obligation
 Breach by A will discharge B from his/her obligation to perform if B’s performance is
conditional on A’s performance and:
• A totally refuses to perform at/before performance is due: repudiate/repudiatory
breach

 A is in breach of a term classed as a condition
 A’s breach deprives B of ‘substantially the whole benefit which it was intended that he
should receive’
 Impact of A’s breach on B
• B is discharged from performing BUT choice is his:
- Choose to ignore A’s breach and performs
- Accepts A’s breach: repudiates the contract, which discharges A from the
obligation to perform

 If a breach is committed, the party who is not in breach has a right to claim damages
regardless of the nature, seriousness of the breach, or whether the party responsible is
discharged

, Advanced Law of Contract Lecture 8 18/11/19


Discharge by Frustration

Can identify some elements of shadows- that point us towards mistake but when we look at
frustration, we will see that they are distinguished because mistake is before the contract and
frustration is after

Illustrated is John Walker 1976 case - concerned purchase of an old warehouse, purchasers had big
ideas what they will do to make it more valuable, danger is it a listing building which can affect what
you can do with that building, everyone knew it was an old and not listed building, the listing people
had shown an interest, before completion date the secretary of state listed the building, the impact
was huge, a lot of money difference between the value of what they would have liked to have done,
if was before the contract we look at mistake if after it is frustration- it was considered to be before

Paradine and Jane- established absolute contract

= frustration is a narrow doctrine

 Frustration occurs if, after formation, performance is:
• Impossible, illegal, or radically different from expected
• Through no fault of either party
 Frustration = a supervening event- the world imposes on contract
 When can it be raised?
> Supervening impossibility
> Supervening illegality
> Frustration of commercial purpose
> Event unforeseen/unforseeable

Supervening impossibility:

• Subject matter destroyed – Taylor v Caldwell (1863) 3 B&S 826- music venue where the
performer contracting for a number of dates at the music venue, before we got to the dates,
the theatre burns down, absolute contract would say you still perform even though there is
a situation it does not make sense, look at implied intent- Blackburn looks at this on the
basis there must be an implied notion that the venue will still exist on performance day
• Death of a party to a personal contract- personal contract with employees
• Temporary impossibility – Pioneer Shipping Ltd v BTP Tioxide Ltd [1982] AC 724- delay
sufficient to destroy the commercial outcome- if the contract indicated an urgency and how
long the delay is etc
• Subject matter unavailable – even if only temporary – Jackson v Union Marine Ins. (1874)-
delays vs delays- shipping case- a contract for a ship to be used to transport goods Newport
to San Francisco, was a rush job, contract identified the ship needs to proceed at all cost, hit
a sandbank took months to float off and identify the damages needs to be repaired, couldn’t
set off, gave up on charter and found another vessel, the courts held that in this instance
they were entitled to do so because the clause identified it should proceed at all possible
dispatch and needs to carry out contract asap

Geschreven voor

Instelling
Studie
Vak

Documentinformatie

Geüpload op
4 mei 2021
Aantal pagina's
8
Geschreven in
2020/2021
Type
College aantekeningen
Docent(en)
Joan upson
Bevat
Alle colleges

Onderwerpen

€6,52
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper
Seller avatar
laurapowell1

Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
laurapowell1 The University of Sheffield
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
2
Lid sinds
5 jaar
Aantal volgers
2
Documenten
13
Laatst verkocht
2 jaar geleden

0,0

0 beoordelingen

5
0
4
0
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen