Which of the following is a step of the Department of Defense (DoD)
Risk Management Process? ......ANSWER......-Registration
-Sourcing
-*Mitigation*
-Tracking
Which of the following is a critical success factor to ensure effective risk
management (RM)? ......ANSWER......-Researching best practices
-Assembling the most qualified personnel for the team
-Establishing priority risk categories
-*Program Risk Process (PRP) Document*
The following describes which type of category of risk: Certification for a
new weapons system is scheduled for January. To conduct a meaningful
test, temperatures must be below freezing. If the temperature is too
warm, the test cannot be conducted. ......ANSWER......-Technical
-*Business*
-Programmatic
pg. 1
, Which of the following are the components of opportunity
management (OM)? ......ANSWER......-Probability, cost, future root cause
-Likelihood, level, consequence
-Level, priority, benefit
-*Future root cause, probability, benefit*
Within a program, which of the following entities is responsible for
ensuring the risk management (RM) process is executed according to
the Program Risk Process (PRP) Document? ......ANSWER......-Risk Owner
-Risk Working Group
-*Risk Management Board (RMB)*
-Program Executive Officer (PEO)
During the Materiel Solution Analysis (MSA) phase, it is important to
assess risks to achieve exit criteria for which review? ......ANSWER......-
*Alternative System Review (ASR)*
-System Functional Review (SFR)
-Preliminary Design Review (PDR)
-System Requirements Review (SRR)
Monte Carlo simulations use computational algorithms to simulate the
behavior of various systems in a nondeterministic manner. Why are
these "nondeterministic" results important to program schedule