Southern Nevada Health District (SNHD) AEMT
Protocol Study Guide | Advanced Emergency Medical
Technician, Prehospital Protocols, Emergency Care,
Patient Assessment | Q&A with Rationales
Exam Structure:
Subject: Emergency Medical Services (EMS) / Advanced Emergency Medical
Technician (AEMT) Protocols
Source: Southern Nevada Health District (SNHD) AEMT Protocol Study Guide
Format: Question & Answer with Rationales
1. Under R9-10-108, what is the overall time-frame for approval of a
health care institution initial license?
Correct Answer: (Note: Specific number not provided in excerpt – typical
answer is 105 calendar days based on question 9 pattern)
Rationale:
1. Initial license approval timelines are defined in Arizona Administrative
Code R9-10-108.
2. The timeframe includes application review, background checks, and
inspection.
3. Applicants must be aware of these deadlines for planning purposes.
2. Under R9-10-108, what is the overall time-frame for approval of a
health care institution renewal license?
Correct Answer: 90 days
Rationale:
1. Renewal license approval takes 90 days under R9-10-108.
2. Facilities should submit renewal applications well before license expiration.
3. Late submissions may result in lapse of licensure.
, 2|Page
3. Under Subsection (C)(4) of R9-10-108, after an applicant for an
initial health care institution license receives the written notice of
approval by the Department, within how long should the applicant
submit the applicable license fee to the Department?
Correct Answer: 60 calendar days
Rationale:
1. Applicants have 60 calendar days to pay the license fee after approval
notice.
2. Failure to pay within this timeframe may void the approval.
3. This ensures commitment to opening the facility.
4. Under Subsection (C)(6) of R9-10-108, within how long must an
applicant file a written notice of appeal to the Department?
Correct Answer: 30 calendar days after receiving the notice of denial
Rationale:
1. Applicants have 30 calendar days to appeal a denial.
2. The appeal must be in writing to the Department.
3. Timely appeal preserves the right to challenge the denial.
5. Under Subsection (A)(1) of R9-10-109, how many days shall a
licensee ensure that the Department is notified in writing before the
effective date of the change affecting the license?
Correct Answer: At least 30 calendar days
Rationale:
1. Licensees must notify the Department at least 30 days before a change.
2. Changes include ownership, location, or services.
3. This allows the Department to update records and verify compliance.
6. Under Subsection (C) of R9-10-116, what is the overall time frame to
approve an application for an approval of a nutrition and feeding
assistant program?
Correct Answer: 60 calendar days
Rationale:
1. The Department has 60 calendar days to approve nutrition/feeding
assistant programs.
, 3|Page
2. This timeframe applies to initial program approval.
3. Programs must meet all requirements before approval is granted.
7. As provided in R9-10-101 (101), which of the following does
"infection control" include?
Correct Answer: Identify, monitor, prevent
Rationale:
1. Infection control involves identifying potential infections.
2. It includes monitoring for signs of infection in residents.
3. Prevention strategies reduce transmission risk.
8. Under Subsection (A) of R9-10-106, if a project cost for a health care
institution is around $100,000 or less, how much would be the
architectural drawing fee?
Correct Answer: (Note: Answer not provided in excerpt)
Rationale:
1. Architectural drawing fees are based on project cost.
2. Lower-cost projects have reduced review fees.
3. This fee supports Department review of plans for compliance.
9. Under R9-10-108, what is the overall time-frame for approval of
architectural plans and specifications?
Correct Answer: 105 calendar days
Rationale:
1. Architectural plan approval takes 105 calendar days.
2. This review ensures facilities meet construction and safety standards.
3. Applicants should factor this into construction timelines.
10. Under Subsection (A)(1) of R9-10-109, how many days shall a
licensee ensure that the Department is notified in writing before the
effective date of the change affecting the license?
Correct Answer: At least 30 calendar days
Rationale:
1. This requirement applies to changes affecting the license.
2. Examples include change of administrator or ownership.
3. Advance notice allows the Department to verify continued compliance.