ARE 5.0 Project Management Exam Questions
With Correct Answers
Project Management - CORRECT ANSWER✔✔-Includes project planning,
| | | | | | |
scheduling, monitoring, coordinating and directing, updating documentation,
| | | | | | |
closing out the job, and following up with clients.
| | | | | | | |
Partnering - CORRECT ANSWER✔✔-Various stakeholders in a project (such as the
| | | | | | | | | | |
architect, owner, contractor and vendors) all participate in the decision-making
| | | | | | | | | |
process.
Bar Chart - CORRECT ANSWER✔✔-Method commonly used for scheduling design
| | | | | | | | | |
and construction projects. Tasks are listed in chronological order on vertical
| | | | | | | | | | |
access and time period is listed on horizontal axis. (Aka Gantt Chart)
| | | | | | | | | | |
Dependency - CORRECT ANSWER✔✔-The relationship between a task that must
| | | | | | | | | |
be completed before another can start.
| | | | |
Critical Path Method (CPM) - CORRECT ANSWER✔✔-Common scheduling tool
| | | | | | | | |
that graphically depicts all the tasks needed to complete a project, the sequence
| | | | | | | | | | | | |
in which tasks must occur, and each task's duration.
| | | | | | | |
Float - CORRECT ANSWER✔✔-The maximum length of time a noncritical task can
| | | | | | | | | | | |
be delayed or extended before it causes a delay.
| | | | | | | |
,Work Plan - CORRECT ANSWER✔✔-A detailed project schedule, breaking the
| | | | | | | | | |
project down into its component tasks and assigning staff members and other
| | | | | | | | | | | |
resources to each task. (Aka Fee projection)
| | | | | |
Pro Forma - CORRECT ANSWER✔✔-Statement listing the expected income that
| | | | | | | | | |
the project will generate and the expected costs to build the project.
| | | | | | | | | | |
Value Engineering - CORRECT ANSWER✔✔-Reviewing individual systems and
| | | | | | | |
materials to see if the same function can be accomplished in a less expensive
| | | | | | | | | | | | | |
way.
Building Cost - CORRECT ANSWER✔✔-The money needed to construct the
| | | | | | | | | |
building, including structure, exterior cladding, finishes, and electrical and
| | | | | | | | |
mechanical systems, as well as the contractor's overhead and profit.
| | | | | | | | |
Site Development Costs - CORRECT ANSWER✔✔-Cost of parking, drives, fences,
| | | | | | | | | |
landscaping, exterior lighting, and irrigation systems.
| | | | |
Furniture, Fixtures, and Equipment (FF&E) - CORRECT ANSWER✔✔-Costs of
| | | | | | | | |
movable equipment, furnishings, accessories, and window coverings.
| | | | | |
Professional Services - CORRECT ANSWER✔✔-Architectural and engineering fees
| | | | | | | |
as well as costs for services such as topographic surveys, soil tests, special
| | | | | | | | | | | | |
consultants, appraisals, and legal consultation.
| | | |
, Financing - CORRECT ANSWER✔✔-Includes the long-term interest paid on
| | | | | | | | |
permanent financing as well as the immediate costs of loan origination fees,
| | | | | | | | | | | |
construction loan interest, and other administrative costs.
| | | | | |
Debt Service - CORRECT ANSWER✔✔-The cost to pay off the construction loan
| | | | | | | | | | | |
for a project and is generally considered an ongoing cost over many years, not
| | | | | | | | | | | | | |
part of the original cost of the project.
| | | | | | |
Top-Down Approach - CORRECT ANSWER✔✔-An approach for estimating fees
| | | | | | | | |
where the PM begins by estimating the total fee needed to complete the project
| | | | | | | | | | | | | |
using a combination of rules of thumb and historical data.
| | | | | | | | |
Bottom-Up Approach - CORRECT ANSWER✔✔-An approach for estimating fees
| | | | | | | | |
where the PM begins by breaking the project down into individual tasks and
| | | | | | | | | | | | |
estimating how much time will be needed to complete each one.
| | | | | | | | | |
Total Working Fee - CORRECT ANSWER✔✔-The fee available to pay people to do
| | | | | | | | | | | | |
the job after subtracting fees for proffit, consultants and other expenses.
| | | | | | | | | |
Project Monitoring Chart - CORRECT ANSWER✔✔-Used to monitor employees'
| | | | | | | | |
time sheets weekly in order to compare the actual hours expended to the
| | | | | | | | | | | | |
budgeted time and take corrective action if the actual time exceeds the budgeted
| | | | | | | | | | | | |
time.
Communication - CORRECT ANSWER✔✔-The most important aspect of project
| | | | | | | | |
management that includes 4 basic kinds known as work assignments,
| | | | | | | | | |
instructions, reward and punishment and social interaction.
| | | | | |
With Correct Answers
Project Management - CORRECT ANSWER✔✔-Includes project planning,
| | | | | | |
scheduling, monitoring, coordinating and directing, updating documentation,
| | | | | | |
closing out the job, and following up with clients.
| | | | | | | |
Partnering - CORRECT ANSWER✔✔-Various stakeholders in a project (such as the
| | | | | | | | | | |
architect, owner, contractor and vendors) all participate in the decision-making
| | | | | | | | | |
process.
Bar Chart - CORRECT ANSWER✔✔-Method commonly used for scheduling design
| | | | | | | | | |
and construction projects. Tasks are listed in chronological order on vertical
| | | | | | | | | | |
access and time period is listed on horizontal axis. (Aka Gantt Chart)
| | | | | | | | | | |
Dependency - CORRECT ANSWER✔✔-The relationship between a task that must
| | | | | | | | | |
be completed before another can start.
| | | | |
Critical Path Method (CPM) - CORRECT ANSWER✔✔-Common scheduling tool
| | | | | | | | |
that graphically depicts all the tasks needed to complete a project, the sequence
| | | | | | | | | | | | |
in which tasks must occur, and each task's duration.
| | | | | | | |
Float - CORRECT ANSWER✔✔-The maximum length of time a noncritical task can
| | | | | | | | | | | |
be delayed or extended before it causes a delay.
| | | | | | | |
,Work Plan - CORRECT ANSWER✔✔-A detailed project schedule, breaking the
| | | | | | | | | |
project down into its component tasks and assigning staff members and other
| | | | | | | | | | | |
resources to each task. (Aka Fee projection)
| | | | | |
Pro Forma - CORRECT ANSWER✔✔-Statement listing the expected income that
| | | | | | | | | |
the project will generate and the expected costs to build the project.
| | | | | | | | | | |
Value Engineering - CORRECT ANSWER✔✔-Reviewing individual systems and
| | | | | | | |
materials to see if the same function can be accomplished in a less expensive
| | | | | | | | | | | | | |
way.
Building Cost - CORRECT ANSWER✔✔-The money needed to construct the
| | | | | | | | | |
building, including structure, exterior cladding, finishes, and electrical and
| | | | | | | | |
mechanical systems, as well as the contractor's overhead and profit.
| | | | | | | | |
Site Development Costs - CORRECT ANSWER✔✔-Cost of parking, drives, fences,
| | | | | | | | | |
landscaping, exterior lighting, and irrigation systems.
| | | | |
Furniture, Fixtures, and Equipment (FF&E) - CORRECT ANSWER✔✔-Costs of
| | | | | | | | |
movable equipment, furnishings, accessories, and window coverings.
| | | | | |
Professional Services - CORRECT ANSWER✔✔-Architectural and engineering fees
| | | | | | | |
as well as costs for services such as topographic surveys, soil tests, special
| | | | | | | | | | | | |
consultants, appraisals, and legal consultation.
| | | |
, Financing - CORRECT ANSWER✔✔-Includes the long-term interest paid on
| | | | | | | | |
permanent financing as well as the immediate costs of loan origination fees,
| | | | | | | | | | | |
construction loan interest, and other administrative costs.
| | | | | |
Debt Service - CORRECT ANSWER✔✔-The cost to pay off the construction loan
| | | | | | | | | | | |
for a project and is generally considered an ongoing cost over many years, not
| | | | | | | | | | | | | |
part of the original cost of the project.
| | | | | | |
Top-Down Approach - CORRECT ANSWER✔✔-An approach for estimating fees
| | | | | | | | |
where the PM begins by estimating the total fee needed to complete the project
| | | | | | | | | | | | | |
using a combination of rules of thumb and historical data.
| | | | | | | | |
Bottom-Up Approach - CORRECT ANSWER✔✔-An approach for estimating fees
| | | | | | | | |
where the PM begins by breaking the project down into individual tasks and
| | | | | | | | | | | | |
estimating how much time will be needed to complete each one.
| | | | | | | | | |
Total Working Fee - CORRECT ANSWER✔✔-The fee available to pay people to do
| | | | | | | | | | | | |
the job after subtracting fees for proffit, consultants and other expenses.
| | | | | | | | | |
Project Monitoring Chart - CORRECT ANSWER✔✔-Used to monitor employees'
| | | | | | | | |
time sheets weekly in order to compare the actual hours expended to the
| | | | | | | | | | | | |
budgeted time and take corrective action if the actual time exceeds the budgeted
| | | | | | | | | | | | |
time.
Communication - CORRECT ANSWER✔✔-The most important aspect of project
| | | | | | | | |
management that includes 4 basic kinds known as work assignments,
| | | | | | | | | |
instructions, reward and punishment and social interaction.
| | | | | |