1. What is the primary function of the Louisiana Department of
Il Il Il Il Il Il Il Il Il
TransportationandDevelopment(DOTD)inhighwayconstruction?
Il lI lI lI lI lI lI
A. Issueenvironmental permits lI Il
B. Overseedesign,construction,andmaintenanceof lI lI lI lI lI
transportation infrastructure
Il Il
C. Regulatefueltaxes lI lI
D. Approvecontractorbids lI lI
Rationale:DOTDmanagestheentirelifecycleofroad infrastructure lI lI lI lI Il lI lI Il
including design and construction.
Il Il Il Il
2. Themaximumallowableslumpforstructuralconcreteinbridge
lI lI lI lI lI lI lI lI
decks under DOTD standards is generally:
Il Il Il Il Il Il
A. 4 inches
Il
B. 6 inches
Il
C. 2 inches
Il
D. 8 inches
Il
Rationale:DOTDspecifies4inchesforstandarddeckplacement for lI lI lI lI lI lI lI lI Il
proper workability.
Il Il
3. Whatisthepurposeofageotechnicalinvestigationbeforeroad
lI lI lI lI lI lI lI lI lI
construction?
Il
A. Totestasphaltdurability
lI lI lI
, B. Todeterminesoilbearingcapacityandsuitability
lI lI lI lI lI lI
C. Tomeasurepavementtemperature
lI lI lI
D. Toestimatelaborcost
lI lI lI
Rationale:Soildatadeterminesthefoundationrequirementsfor road lI Il lI lI lI lI lI Il
stability.
Il
4. Inasphalt paving,the“tackcoat”servesto:
lI Il lI lI lI lI Il
A. ProtectagainstUVdegradation lI lI lI
B. Bondnewasphaltlayerstotheoldsurface lI lI lI lI lI lI lI
C. Preventoxidation lI
D. Enhanceskidresistance lI lI
Rationale:Tackcoatensuresadhesionbetweenasphaltlayers. lI lI lI lI lI lI lI
5. TheLouisianastandardspecificationforcompactionrequires
lI lI lI lI lI lI
subgrade to be compacted to at least:
Il Il Il Il Il Il Il
A. 90%ofmaximumdrydensity lI lI lI lI
B. 95%ofmaximumdry density lI Il lI lI
C. 85%ofmaximumdrydensity lI lI lI lI
D. 100%of maximumdrydensity lI Il lI lI
Rationale:DOTDtypicallyrequires95%compactionfor subgrade under lI lI lI lI lI lI Il Il
highways.
Il
6. Whichtestisused todeterminetheplasticityofsoil?
lI lI lI Il lI lI lI lI lI
A. Sieveanalysis lI
B. Atterberglimitstest lI lI
C. CBRtest lI
D. Moisture-density test Il
Rationale:Atterberglimitsclassifyfine-grainedsoilsbyplasticity and lI lI lI lI lI lI lI Il
consistency.
Il
, 7. Inconcretebridge construction,what istheminimumcuring time
lI lI Il lI Il lI lI lI Il
before form removal, unless otherwise specified?
Il Il Il Il Il Il
A. 7 days Il
B. 3daysoruntilsufficientstrengthisachieved
lI lI lI lI lI lI lI
C. 24hours lI
D. 10days lI
Rationale:Earlyremovalisallowediftestcylindersconfirm adequate lI lI Il lI lI lI lI lI Il
strength.
Il
8. A“crown”inhighwaydesignrefersto:
lI lI lI lI lI lI
A. Edgedrainage lI
B. The highestpointinthecenterof theroadway lI Il lI lI lI lI Il lI
C. Medianbarrier lI
D. Pavement shoulder Il
Rationale:Thecrownallowsforwaterr unoff tobothsides. lI lI lI lI lI lI lI lI lI
9. Thetypicalbitumencontentinasphaltconcretemixranges
lI lI lI lI lI lI lI lI
between:
Il
A. 3–4%
B. 4–6%
C. 7–9%
D. 1–3%
Rationale:Optimumasphaltbindercontentgenerallylieswithin 4– lI lI lI lI Il lI lI Il
6% by weight. Il Il
10. Whatisthemainfunctionofexpansionjointsinbridges? lI lI lI lI lI lI lI lI lI
A. Preventcorrosion lI
B. Increasestiffness lI
C. Allowmovementduetotemperaturechanges lI lI lI lI lI
D. Reduceloadcapacity lI lI