Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

ABSA -4th Part B-Final Exam with Accurate Complete Answers Updated.

Beoordeling
-
Verkocht
-
Pagina's
109
Cijfer
A+
Geüpload op
12-05-2026
Geschreven in
2025/2026

Chapter 1 Introduction to Power Engineering - Answer In the early days, owners of power plants hired _____ workers, who started out doing manual labour and through acquired experience they were promoted to jobs with gradually increasing levels of skill. a. Qualified b. Highly educated c. Trained d. Unskilled e. College trained. - Answer d Early government involvement in certification of power engineers became more important for the following reasons except: a. Efficiency b. Labour mobility c. Safety d. Pollution e. Technological advancements. - Answer d Which of the following is not a definition of a power plant? a. Any one or more boilers in which steam or other vapour is generated at more than 103 kPa. b. Any one or more boilers containing liquid and having a working pressure exceeding 1100 kPa. c. Any one or more boilers containing liquid and having a working temperature exceeding 121°C. d. Any one or more boilers in which steam or other vapour is generated at less than 57 kPa. e. Any engine run from one or more boilers containing liquid and having a working pressure exceeding 1100 kPa. - Answer d

Meer zien Lees minder
Instelling
ABSA
Vak
ABSA

Voorbeeld van de inhoud

ABSA -4th Part B-Final Exam with
Accurate Complete Answers 2025-
2026 Updated.
Chapter 1 Introduction to Power Engineering - Answer



In the early days, owners of power plants hired _____ workers, who

started out doing manual labour and through acquired experience

they were promoted to jobs with gradually increasing levels of skill.

a. Qualified

b. Highly educated

c. Trained

d. Unskilled

e. College trained. - Answer d



Early government involvement in certification of power engineers

became more important for the following reasons except:

a. Efficiency

b. Labour mobility

c. Safety

d. Pollution

e. Technological advancements. - Answer d



Which of the following is not a definition of a power plant?

a. Any one or more boilers in which steam or other vapour is

generated at more than 103 kPa.

b. Any one or more boilers containing liquid and having a

working pressure exceeding 1100 kPa.

c. Any one or more boilers containing liquid and having a

working temperature exceeding 121°C.

d. Any one or more boilers in which steam or other vapour is

generated at less than 57 kPa.

e. Any engine run from one or more boilers containing liquid and

having a working pressure exceeding 1100 kPa. - Answer d

,Committees that establish standards are composed primarily of

which of the following elements?

a. Only experts from the industry and government

b. One government appointed standards board

c. Experts from the industry, professional and insurance groups

and all levels of government

d. Only multi-National power corporations

e. One independent safety and standardisation board. - Answer c



A Fourth Class Power Engineer's certificate of competency qualifies

the holder to take charge of the general care and operation of a

power plant consisting of one or more coil type drumless boilers

having an aggregate capacity of not more than _____ kW, when

used for the sole purpose of underground thermal flooding in oil

fields, as chief steam engineer.

a. 1,000

b. 2,000

c. 3,000

d. 4,000

e. 5,000. - Answer e



"Power plant" means any one or more boilers:

a. In which steam or other vapour is generated at more than 103

kPa.

b. In which steam or other liquid is generated at more than 103

kPa.

c. Containing liquid and having a working pressure exceeding

1,200 kPa (160 psi), and temperature exceeding 121°C.

d. Containing liquid and having a working pressure exceeding

1,200 kPa (160 psi), and a temperature not exceeding 121°C.

e. Containing liquid and having a working pressure not exceeding

121°C. - Answer a



In order to produce greater efficiency, higher boiler pressures were

,used and this led to _____ due to employing of unqualified

operators in a power plant.

a. Economic gains

b. Serious accidents

c. Higher efficiency

d. Safer working conditions

e. Less labour disputes. - Answer b



A Fourth Class Power Engineer's certificate of competency qualifies

the holder to take charge of a shift in a power plant consisting of

one or more coil type drumless boilers having an aggregate capacity

of not more than _____ kW, when used for the sole purpose of

underground thermal flooding in oil fields, as shift engineer.

a. 10,000

b. 20,000

c. 30,000

d. 40,000

e. 50,000. - Answer a



Which of the following is not a common work schedule for power

engineers?

a. Year round employment

b. Seasonal lay-offs

c. Eight hour days

d. Twelve hour days

e. Rotating day and night shifts. - Answer b



Which of the following duties is a holder of a Fourth Class Engineer's

Certificate of Competency not qualified to perform?

a. Take charge of a shift in a power plant having a capacity of

more than 10,000 kW, as shift engineer.

b. Take charge of the general care and operation of a power

plant consisting of one or more coil type drumless boilers

having an aggregate capacity not over 5,000 kW, when only in

use for the purpose of subterranean thermal flooding in oil

, fields, as chief engineer

c. Take charge of the general care and operation of a power

plant having a capacity of not more than 1, 000 kW as chief

steam engineer, and to supervise the engineers in that plant.

d. Take charge of a shift in a power plant consisting of one or

more coil type drumless boilers having an aggregate capacity

of not more than 10,000 kW, when used only for underground

thermal flooding in oil fields, as shift engineer - Answer a



Which of the following certificates of competency qualifies the holder

to take charge of the general care and operation of any power plant

as chief steam engineer, and to supervise the engineers in that plant

and take charge of a shift in any power plant as shift engineer?

a. Third Class Engineer's Certificate of Competency

b. Building Operator's Certificate of Competency

c. Pressure Welder's Certificate of Competency

d. First Class Engineer's Certificate of Competency

e. Fireman's Certificate of Competency. - Answer d



When oil mixes with water in the boiler the resultant effect is:

a. Serious foaming

b. Accumulation of very hard scale resulting in tube burnout

c. Accumulation of soot

d. Decrease in water level

e. Shifting and loosening of baffles. - Answer a



The holder of a Certificate of Competency, the classification of which

authorises him or her to act as a engineer, may sketch, construct,

install, operate, repair, and give advice on all things pertaining to

any _____ in which that person is employed.

a. Welding shop

b. Automotive shop

c. Power plant

d. Fish plant

e. Hydro plant. - Answer c

Geschreven voor

Instelling
ABSA
Vak
ABSA

Documentinformatie

Geüpload op
12 mei 2026
Aantal pagina's
109
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

€14,59
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
TestSolver9 Webster University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
901
Lid sinds
2 jaar
Aantal volgers
127
Documenten
29063
Laatst verkocht
3 dagen geleden
TESTSOLVER9 STORE

TOPNOTCH IN LEARNING MATERIALS,(EXAMS,STUDYGUIDES NOTES ,REVIEWS,FLASHCARDS ,ALL SOLVED AND PACKAGED.OUR STORE MAKE YOUR EDUCATION JOURNEY EFFICIENT AND EASY.WE ARE HERE FOR YOU FEEL FREE TO REACH US OUT .

3,5

156 beoordelingen

5
67
4
20
3
27
2
13
1
29

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen