Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

PI 653 Tank Inspection Welding Requirements Preheat Alternative PWHT Frangible Roof Design Radiographic Examination NDT Methods Corrosion Monitoring Sulfuric Acid Inspection Patch Plate Repairs Shell Thickness Calculations Hydrostatic Testing Bottom Repla

Beoordeling
-
Verkocht
-
Pagina's
60
Cijfer
A+
Geüpload op
13-05-2026
Geschreven in
2025/2026

PI 653 Tank Inspection Welding Requirements Preheat Alternative PWHT Frangible Roof Design Radiographic Examination NDT Methods Corrosion Monitoring Sulfuric Acid Inspection Patch Plate Repairs Shell Thickness Calculations Hydrostatic Testing Bottom Replacement Nozzle Spacing Seismic Design Floating Roof Tanks Material Specifications Brittle Fracture Toughness API RP 579 Fitness for Service Exam Questions Verified and Provided with Complete A+ Graded Answers Latest Updated 2026 *When using the preheat alternative weld method, the temperature shall be checked ___ to assure the minimum temperature is maintained during welding. A) one inch or two times the material thickness whichever is greater, on each side of the groove. B) two inches or two times the material thickness, whichever is great, on each side of the groove C) Three inches or three times the material thickness, whichever is greater, in each side of the groove D) Four inches or four times the material thickness whichever is greater on each side of the groove D *For a roof to be considered as frangible: A) the top angle shall be larger than 2 X 2 3/16 in B) the top angle attachments weld shall me a minimum of 3/16" C) The roof support members shall not be attached tot he roof plate D) the roof support members shall be attached to the roof plate C *What are the examiner qualification for visual examination for tank inspection? A) Shall comply with ASME Sect V, article 9 B) Shall have visual capable of reading a standard Jaeger J-1 chart C) Shall have biennial visual examination by a license optometrist D) There are no requirements D *Sulfuric acid corrosion can be inspected and monitored with: A) Shear wave ultrasonic testing B) Visual Inspection C) Coupons and ER probes D) Wet fluorescent magnetic particle testing C *What is the maximum interpass temperature permitted, in API 653, when using the preheat alternative to PWHT welding method? A) 600°F B) 450°F C) 300°F D) 800°F A *Radiographic examinations are required for all of the following except: A) New and replaced shell insert plate and door sheet welds B) All repairs to butt-welds that are examined ultrasonically C) New annular plate joints D) Shell Butt-welds on reconstructed tanks B *For tanks constructed of material having a yield strength equal to or less than _____, it may not be necessary to raise all nozzles, when installing a new bottom in an existing tank, if certain conditions are met. A) 70000 psi B) 60000 psi C) 50000 psi D) 40000 psi C *A tank, built to the ninth edition of API 650, is to have a new bottom installed. The installation will be performed by slotting the shell and inserting the new bottom. The shell plate material is A-516 Gr. 60 and the new shell to bottom weld will be made using low-hydrogen electrodes. An

Meer zien Lees minder
Instelling
Vak

Voorbeeld van de inhoud

PI 653 Tank Inspection Welding Requirements Preheat
Alternative PWHT Frangible Roof Design Radiographic
Examination NDT Methods Corrosion Monitoring Sulfuric
Acid Inspection Patch Plate Repairs Shell Thickness
Calculations Hydrostatic Testing Bottom Replacement
Nozzle Spacing Seismic Design Floating Roof Tanks Material
Specifications Brittle Fracture Toughness API RP 579
Fitness for Service Exam Questions Verified and Provided
with Complete A+ Graded Answers Latest Updated 2026




*When using the preheat alternative weld method, the temperature shall be checked ___ to
assure the minimum temperature is maintained during welding.

A) one inch or two times the material thickness whichever is greater, on each side of the groove.

B) two inches or two times the material thickness, whichever is great, on each side of the
groove

C) Three inches or three times the material thickness, whichever is greater, in each side of the
groove

D) Four inches or four times the material thickness whichever is greater on each side of the
groove

D




*For a roof to be considered as frangible:

A) the top angle shall be larger than 2 X 2 3/16 in

B) the top angle attachments weld shall me a minimum of 3/16"

,C) The roof support members shall not be attached tot he roof plate

D) the roof support members shall be attached to the roof plate

C




*What are the examiner qualification for visual examination for tank inspection?

A) Shall comply with ASME Sect V, article 9

B) Shall have visual capable of reading a standard Jaeger J-1 chart

C) Shall have biennial visual examination by a license optometrist

D) There are no requirements

D




*Sulfuric acid corrosion can be inspected and monitored with:

A) Shear wave ultrasonic testing

B) Visual Inspection

C) Coupons and ER probes

D) Wet fluorescent magnetic particle testing

C




*What is the maximum interpass temperature permitted, in API 653, when using the preheat
alternative to PWHT welding method?

A) 600°F

B) 450°F

C) 300°F

,D) 800°F

A




*Radiographic examinations are required for all of the following except:

A) New and replaced shell insert plate and door sheet welds

B) All repairs to butt-welds that are examined ultrasonically

C) New annular plate joints

D) Shell Butt-welds on reconstructed tanks

B




*For tanks constructed of material having a yield strength equal to or less than _____, it may
not be necessary to raise all nozzles, when installing a new bottom in an existing tank, if certain
conditions are met.

A) 70000 psi

B) 60000 psi

C) 50000 psi

D) 40000 psi

C




*A tank, built to the ninth edition of API 650, is to have a new bottom installed. The installation
will be performed by slotting the shell and inserting the new bottom. The shell plate material is
A-516 Gr. 60 and the new shell to bottom weld will be made using low-hydrogen electrodes. An
existing NP2 12 reinforced shell penetration does not meet the minimum weld spacing
requirements of the current API 650 edition. There is 5-1/2 inches between the toe of the shell
to bottom weld and the toe of reinforcing plate fillet weld. The inspector should:

, A) Order the penetration raised to comply with the current API 650 weld spacing requirements

B) Order the penetration raised to obtain a minimum of 6 inches between the toe of the shell to
bottom weld and the toe of reinforcing plate fillet weld.

C) Accept the penetration provided the penetration weld and the shell to bottom weld are
blend ground and examined by the appropriate nondestructive examination method

D) Order the penetration raised because the incorrect electrodes were on the shell to bottom
weld

C




*Permanent attachment welds, made on A-516 Gr. 60 plate shall be examined by which of the
following methods?

A) Magnetic particle

B) Liquid Penetrant

C) Either Magnetic particle or liquid penetrant

D) Visual

D




*During an inspection, an inspector finds lap-welded patch on a tank shell. Some patches are
thinner than 0.500" and others are thicker than 0.500". No patch plate is thinner that 0.1875".
What should the inspector do?

A) All patches thicker than 0.50" must be removed and repairs made in accordance with API 653

B) Consult with engineer experienced in tank design

C) all existing welded on patch plates are acceptable provided they meet the size and location
requirements of API 653

D) All of the existing patch plates must be removed and repairs made in accordance with API
653

C

Geschreven voor

Vak

Documentinformatie

Geüpload op
13 mei 2026
Aantal pagina's
60
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

€14,92
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
LectDeniz Teachme2-tutor
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
21
Lid sinds
2 jaar
Aantal volgers
13
Documenten
4974
Laatst verkocht
7 maanden geleden
Lect Deniz Academic Resources Hub

Lect Deniz is a highly experienced academic tutor and dedicated content creator with a strong track record of developing comprehensive, high-quality study materials for a wide range of university courses across the globe. With years of experience in higher education support, he excels at transforming complex academic concepts into clear, structured, and easy-to-follow resources that enhance student understanding and confidence. He provides an extensive collection of well-researched and carefully organized documents across key disciplines, including nursing, medicine, and various science fields. His materials cover essential topics such as anatomy, physiology, pharmacology, clinical practice, and core scientific principles, making them highly valuable for both coursework and intensive exam preparation. Each document is thoughtfully designed to align with university standards and curricula, ensuring accuracy, relevance, and practical application. Lect Aziim’s work stands out for its clarity, depth, and attention to detail, offering students concise summaries, detailed explanations, and exam-focused content that supports effective revision. His commitment to academic excellence and student success is reflected in the consistency and reliability of his materials, making him a trusted resource for learners seeking to improve performance and achieve their academic goals.

Lees meer Lees minder
5,0

1 beoordelingen

5
1
4
0
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen