Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

NC Building Contractor License REVISED AND UPDATED FOR 2026/2027 ACTUAL EXAM COMPLETE QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+||BRAND NEW!!

Beoordeling
-
Verkocht
-
Pagina's
27
Cijfer
A+
Geüpload op
15-05-2026
Geschreven in
2025/2026

NC Building Contractor License REVISED AND UPDATED FOR 2026/2027 ACTUAL EXAM COMPLETE QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+||BRAND NEW!!

Instelling
North Carolina Public Utilities Contractor
Vak
North Carolina Public Utilities Contractor

Voorbeeld van de inhoud

NC Building Contractor License

- ANS-What board is nailed to the end of a rafter tail?

.25 of an inch - ANS-The minimum thickness for fiber cement lap siding as weather masking is
_____

.0149 of an inch - ANS-Metal veneer siding shall have a minimal thickness of______

#12 - ANS-The minimal length screws used to connect metal decking are__________.

$6,740 - ANS-The agenda of values for a mission shows Task A is worth $18,000, Task B is well
worth $6,500 and Task Cis worth $45,000. Task A is 16% complete. Task B is four% whole and
Task Cis eight% complete. What is the fee of the development fee due?

$50,441 - ANS-If your account stability is $47,382 on May 11th and all through May you pay
$11,318 worth of involces, and you deposit $14,377, what is your balance on June 2nd?

$one hundred,000 - ANS-The Miller Act calls for that all federal tasks exceeding ____________
need to be bonded.

$152,000 - ANS-If a contractor made $38,000 on a challenge and this represented 25% profit,
what became the entire quantity of the task?

0.024 inches - ANS-What is the minimal thickness of aluminum used as valley lining cloth?

Zero.028 - ANS-Weld washers are recommended for metallic thickness much less
than_______.

1 - ANS-Plain bevel siding must overlap at the least ________ inches.

1 half inch - ANS-Clear space between a handrail and a wall/ surface shall be no longer much
less than _____

1 1/2 inch - ANS-What is the minimal concrete cover (in inches) for a W31 piece of rebar, while
the usage of Hign- early power concrete on a patio slab?

1 half of inch. 3 inches - ANS-The ends of arch joist shall have no longer less than ________
inches of touching on wooden/metallic or now not much less than ______ on masonry

,1 half of to 1 three/four percentage - ANS-What is the allowable slope for a aspect-to facet
sloped football discipline.

1 three/four inches - ANS-Max 2 inches circular handrails shall have a diameter no extra than
_____ and no more than _____

1 Acre or Larger - ANS-An erosion and sedimentation manage plan need to be authorised
before land distrubance begins on any web page ______

1 inch - ANS-The edges of lugs, brackets, rivets and bolt heads attached to structural members
will be accredited to extend to inside ___ of the floor of the fire protection/fireproofing

1 inch - ANS-The maximum distance to cut back the sheathing from a publish-tension strand for
the anchor is______.

1 inch - ANS-Ventilation necessities: an air space/gap of ___ is required between the insulation
and the roof sheathing

1 layer of felt - ANS-Underlayment application: for roof slopes four devices in 12 gadgets
horizontal (33% slope) ___________ is required

1 unit vertical and 12 units horizontal - ANS-Ramps used as a part of a way of egress shall have
a walking slop no steeper than __ vertical in ___ horizontal

1-half of - ANS-The sidelap or offset for wooden shingles and shakes have to be _________
inches.

1-half of - ANS-The space among a wall and a grab bar shall be _____ inches.

1-1/2 horizontal to at least one vertical - ANS-The maximum slope allowed for excavation less
than 20 ft in total intensity in a Type C soilis ___________.

1-1/2 hours, 300 revolutions - ANS-When it involves geared up blended concrete, what time
frame do you've got from batching on the plant to finish discharge at the jobsite?

1-1/2 x 3-half of - ANS-The actual length of a 2 x 4 is___________.

1:12 - ANS-The maximum slope of a ramp is ________?

1:12 - ANS-Which of the subsequent is the maximum slope allowed for a ramp?

1:20(5percentslope) - ANS-10 toes Site grading: the grade shall be sloped away from a
constructing no much less than ______ for a minimal distance of ______ feet.

, 1.5. 4 - ANS-Normally the travel pace of a dozer is ______ to ______ mph.

1.054 - ANS-The roof slope element for a 4 in 12 roof slope is__________.

1) Chain and hook via the center of the bundles
2) Forklift blades
3) Nylon straps used as a choker
4) None of the above. ******* - ANS-The great technique for unloading put up-tensioning cable
would be..

Half - ANS-A concrete wearing floor like terrazzo is generally ________ inch thick.

Half of inch thick - ANS-Combustible insulating boards no more than___ & protected with finish
flooring are accredited whilst connected at once to non combustible ground or timber subfloor
connected to sleepers

1/2 inch type X gypsum board (private storage separated from dwelling unit and its attic) -
ANS-What should be applied to systems helping the separation from liveable rooms above the
garage?

Half inch. 6 feet 15 inches - ANS-Roof diaphragms will be anchored to masonry partitions with
______. Diameter bolts ________feet on middle or their equivalent. Bolts shall expand and be
embedded as a minimum _____ inches into the masonry.

1/2" - ANS-When wooden beams are positioned interior a masonry or concrete pocket how a
good deal clearance is required on pinnacle, aspects and quit of the beam?

1/three - ANS-The overall area of mezzanines have to now not exceed _____ of the room in
which it's miles placed

1/four - ANS-Ladders located towards a wall need to be sloped in order that the horizontal
distance from the foot of the ladder to the wall _______ is of the operating duration of the
ladder.

1/4 - ANS-Notches at the ends of joists shall now not exceed ______ the joist depth

1/4 inch. 3/four inch - ANS-A mortar mattress on pinnacle of a footing should be among
__________ and ___________.

1/4 inches at 2 inches - ANS-The proper give up ancore weld for a deep lengthy span joist is
________.

1/four the depth - ANS-Notching on the ends of rafters ceiling joists shall no longer exceed
________

Geschreven voor

Instelling
North Carolina Public Utilities Contractor
Vak
North Carolina Public Utilities Contractor

Documentinformatie

Geüpload op
15 mei 2026
Aantal pagina's
27
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

€11,48
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Ascore Chamberlain College Nursing
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
127
Lid sinds
2 jaar
Aantal volgers
13
Documenten
2345
Laatst verkocht
3 weken geleden

Welcome to Ascore ! The place to find the best study materials for various subjects. You can be assured that you will receive only the best which will help you to ace your exams. All the materials posted are A+ Graded. Please rate and write a review after using my materials. Your reviews will motivate me to add more materials. Thank you very much!

3,9

29 beoordelingen

5
16
4
3
3
4
2
4
1
2

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen