that are associated with time devoted to the coordination in meetings and
briefings as well as time necessary to resolve disconnects between tasks are
known as ____________ costs.
a. general and administrative (G&A) overhead costs
b. things go wrong
c. direct
d. interaction
e. coordination - CORRECT ANSWER=d. interaction
The salary of the project manager and temporary rental space for the project
team would be classified as __________ costs.
,2 | Page
a. interaction
b. general and administrative overhead
c. fixed
d. direct project overhead
e. direct - CORRECT ANSWER=d. direct project overhead
When someone uses experience and/or information from others to determine
the project duration and total cost, ____________ estimating is being used.
a. top-down
b. bottom-up
c. experiential
d. reference class
e. professional estimation - CORRECT ANSWER=a. top-down
Refining estimates may be necessary for a number of reasons. For example,
people working on prototype development needing time to interact with the
design engineers after the design is completed is a good example of
a. hidden interaction costs.
b. changes in project scope.
c. normal conditions not applying.
d. the customer not being clear about their expectations.
,3 | Page
e. things going wrong on a project. - CORRECT ANSWER=a. hidden interaction
costs.
Typical kinds of costs found in a project include all of the following EXCEPT
a. labor.
b. All of these are examples of costs found in a project.
c. general and administrative overhead costs.
d. project overhead costs.
e. direct costs. - CORRECT ANSWER=b. All of these are examples of costs
found in a project.
________ activities must be completed immediately before a particular activity.
a. Burst
b. Predecessor
c. Successor
d. Parallel
e. Merge - CORRECT ANSWER=b. Predecessor
On a project network, the activity times are derived from the
, 4 | Page
a. work packages.
b. project proposal.
c. budget.
d. responsibility matrix.
e. organization breakdown structure - CORRECT ANSWER=a. work packages.
A(n) ________ is the minimum amount of time a dependent activity must be
delayed to begin or end.
a. lag
b. wane
c. saunter
d. lead
e. hobble - CORRECT ANSWER=a. lag
Consider the following table of activities A through G in which A is the start node
and G is the stop node.
On a piece of scratch paper, draw the network associated with this table and
determine the following. What is the late start time for activity E (how late can
activity E start?)? -
CORRECT ANSWER=