(BC-B,C) Exam 2026-2027 Complete 350 Questions
and Correct Detailed Answers (Verified Answers)
Already Graded A+ Brand New Version!!
2x[(36+2+2)+24+2+2]=136/10'x1.05=14.28 sheets about 14 sheets - CORRECT ANSWER: A
rectangular structure measures 36 x 24. It has a hip roof with an overhang of 2 feet around the
perimeter. How many 10 foot length of one by eight facia boards are required, allow 5% for
waste.
3-4-5 triangle
5x2=10 - CORRECT ANSWER: Referring to the house plans, according to figure 1001, what
does X equal if a is 90°?
3x2=6 - CORRECT ANSWER: Referring to the office plans, how many 3 inch downspouts are
required for this building?
4 - CORRECT ANSWER: Referring to the house plans, how many pairs of 3'6" shutters are
specified in the plans and drawings?
4 #5s - CORRECT ANSWER: Referring to the office plans, how many pieces of rebar are the
plans showing for the thickened slab?
4 stalls per floor x 2 floors = 8 stalls
8 x 355= 2840
8 hrs x 17.5 =140
8 x 9.25 = 74
Total = 3054$ - CORRECT ANSWER: Referring to the office plans, factoring in the information
below:
,Wall-mounted urinal screens cost $115 per unit and will take 30 minutes to install
Wall hung toilet Stalls cost $355 per unit and will take one hour to install
The Carpenter gets paid $17.50 per hour and his laborer gets paid $9.25 per hour
What is the total cost to install the wall hung toilet stalls for the restrooms in the office building?
5 columns on north side
2x11x3=88sqft per column x 5=440/30=14.67 hrs=15 hrs - CORRECT ANSWER: referring to
the office plans, how much time would it take to sandblast the columns on the first floor of the
north side of the building, if it takes 60 minutes to sandblast 30 ft.²
5'7"x8'x2+5'x8'=129.28 sf x 2 towers=260 SF - CORRECT ANSWER: Referring to the office
plans, how many square feet of 4 inch quarry tiles will be needed for the second and third floors
of the stair towers?
6 - CORRECT ANSWER: How many 6 inch roof drains are needed for the three story office
building?
6 CY - CORRECT ANSWER: Referring to the plans on the house, how many cubic yards of
concrete is needed for the garage floor slab?
8 (all doors to bedrooms and baths) - CORRECT ANSWER: How many privacy door locks are
on the plans?
10" - CORRECT ANSWER: What is the height of the curbs in the parking lot in the office
plans?
11x2=22sqftX4 sides=88sqftx14 columns=1232 sqft/(4x8)=38.5 sheets =39 sheets - CORRECT
ANSWER: Referring to the office plans, how many 4 x 8 sheets of grade B Dash B plywood
would it take to form all the exterior columns for the first floor of the set of plans? Do not count
the bases and disregard waste.
,12 - CORRECT ANSWER: According to the house plans how many stringers will be needed as
specified by the plans and specifications?
16 - CORRECT ANSWER: According to the house plans, what is the number of ground fault
receptacle is needed for the house?
16 - CORRECT ANSWER: How many mullions will be used for this set of plans referring to the
house plans
16 - CORRECT ANSWER: Referring to the house plans, how many recessed lights are shown
on the plans?
23 - CORRECT ANSWER: Referring to the house plans, how many window units need to be
ordered for this set of plans?
24'-3'=21'
21x3=63 sqft for one column x18 column faces = 1134 sq ft - CORRECT ANSWER: How many
square feet of exterior surface Shall be hand rubbed and sealed on the three-story office plans?
100+75+100+75=350 LF - CORRECT ANSWER: Referring to the office plans, how many
linear feet of concrete are needed for the thickened edge for the first floor around the perimeter
of the building?
102-97.4=4.5' - CORRECT ANSWER: Referring to the office plans, what is the height from the
ground to the first floor?
1500+1000+1300+1200=5000 sqft x1.33'(16" Depth)/27=246.3x1.2(compaction)=300 CY -
CORRECT ANSWER: Referring to the three-story office plans, how many cubic yards of topsoil
will be required for the planter areas?
, ACI 318 pg 164
1/30 - CORRECT ANSWER: The thickness of non-bearing walls shall not be less than 4 inches,
nor less than_____ The distance between members that provide lateral support.
ACI 318 pg 195
D. All the above - CORRECT ANSWER: Structural plain concrete walls Shall be continuously
supported by which of the following?
A. Soil
B. Footings
C. Foundation walls
D. All the above
ACI 318 pg 339
1/4 in - CORRECT ANSWER: Ducts for grouted single wire, single strand, are single bar
Tendons she'll have an inside diameter_____inch(es) ;after than the pre-stressing steel diameter?
ACI 318 pg 348
0.003 - CORRECT ANSWER: The maximum musical strain at extreme concrete compression
fiber Shall be assumed equal to what?
ACI 318 pg 433
4 bar bundle - CORRECT ANSWER: Development length of individual bars within a bundle,
intention or compression, Shall be that For the the individual bar, increased by 33% for a
_______ bar bundle?
ACI 318 pg 470
Be permitted - CORRECT ANSWER: In bars required for a compression only, transmission of
compression stress by bearing of square cut and held in concentric contact by A suitable device
shall?