A Balancing Authority's CPS1 calculation is computed using its clock-
minute average of two values. What are those two values?
A. Reporting ACE and Frequency Error
B. Actual and Scheduled Net Interchange NIA and NIS.
C. L10 and Reporting ACE
D. Actual and Scheduled Frequency (FA and FS)
A. Reporting ACE and Frequency Error
,To conform to CPS requirements, a Balancing Authority must have
which of the following?
A. CPS1 greater than or equal to 90% or BAAL greater than or equal to
100%.
B. CPS1 greater than or equal to 100% and ACE does not exceed BAAL
more than 15 consecutive minutes.
C. CPS1 greater than or equal to 100% and ACE does not exceed
BAAL more than 30 consecutive minutes.
D. CPS1 greater than or equal to 90% and ACE does not exceed BAAL
more than 30 consecutive minutes.
C. CPS1 greater than or equal to 100% and ACE does not exceed
BAAL more than 30 consecutive minutes.
,What should a Balancing Authority set Scheduled Frequency to
for a slow Time Error Correction?
A. 60.02 Hz
B. 59.98 Hz
C. 59.80 Hz
D. 60.20 Hz
A. 60.02 Hz
Which of the following is a potential source of Contingency Reserve?
1. Offline generation that takes 10 minutes to start and ramp to full
output
2. Online generation at full load
3. Controllable load resources
4. Voltage reductions
A. 3 and 4
B. 2 and 3
C. 1 and 3
D. 1 and 2
C. 1 and 3
, In an Interconnection, which of the following is required to be in
the metered boundaries of a Balancing Authority Area?
A. Generation
B. Transmission
C. Load
D. All are required to be within the metered boundaries of a
Balancing Authority.
D. All are required to be within the metered boundaries of a
Balancing Authority.
The minimum compliance for NERC Disturbance Control Standard
(DCS) is
________?
A. 90% of all reportable disturbances
B. 90% of all disturbances
C. 100% for all reportable disturbances
D. 100% for all generator tips
C. 100% for all reportable disturbances