Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

PJM Interconnection Power System Operations Practice Test 2 EXAM LATEST QUESTIONS AND 100- Verified ANSWERS

Beoordeling
-
Verkocht
-
Pagina's
26
Cijfer
A+
Geüpload op
25-05-2026
Geschreven in
2025/2026

PJM Interconnection Power System Operations Practice Test 2 EXAM LATEST QUESTIONS AND 100- Verified ANSWERS

Instelling
Electrical
Vak
Electrical

Voorbeeld van de inhoud

PJM Interconnection Power System Operations Practice Test 2
EXAM LATEST 2026-2027 QUESTIONS AND 100% Verified
ANSWERS
Which statement best describes the PJM definition of a Directive ?



A. Instructions to take action for a Maximum Emergency Generation Alert or initiate load dump measures for
capacity or transmission emergencies

B. Instructions to take action to control Interconnection Reliability Operating Limits ( IROL ) or issuance of a
PCLLRW

C. Instructions to take action to control Interconnection Reliability Operating Limits ( IROL ) or initiate load dump
measures for capacity or transmission emergencies

D. Instructions to take action for an issuance of a NERC Energy Emergency Alert or take action to control
Interconnection Reliability Operating Limits ( IROL )

C. Instructions to take action to control Interconnection Reliability Operating Limits ( IROL ) or initiate load dump
measures for capacity or transmission emergencies




During extended hot weather events :



A. Transmission equipment will dissipate heat more readily

B. CTs can produce more MWs

C. Power transformers will have a higher rating

D. Transmission lines tend to sag

D. Transmission lines tend to sag




The PJM All - Call process is a form of _______________ used at PIM .



A. One - way communication

,B. Two - way communication

C. Three - way communication

D. Conference call

A. One - way communication




Using the following information determine the drop in frequency of the island when the indicated load is restored
. (Assume a 5 % governor droop)

Generation capacity on - line : 1,500 MW

System Load : 950 MW

System Frequency : 60.2 Hz

Block of load to be restored : 30 MW



A. 60.2 Hz

B. 59.9 Hz

C. 60.1 Hz

D. 60.0 Hz

C. 60.1 Hz




Match the PJM Action with the appropriate weather - related procedure :

A. Severe Storms

B. Cold Weather Alert

C. Hot Weather Alert

D. Use a local temperature set of ratings



I. Alert members to the forecasted high temperatures

II . A cold front has causes a great variation in temperature across your Transmission Zone

III Ensure auto - reclosing is in service on EHV equipment

, IV . Ask members to man CT sites

A. III

B. IV

C. I

D. II




An operator has _minutes to correct Actual Voltages below the Emergency Low Voltage Limit but above the Load
Dump limit



A. 5

B. 10

C. 15

D. 30

A. 5




A Post Contingency Local Load Relief Warning has been issued for contingency control on a 115 kV line for the loss
of a 345 kV Line . An alarm on EMS indicates that the 345 kV line has tripped and the flow on the 115 kV line is
now exceeding the Emergency rating by 5 MVA with no imminent danger to equipment or personnel . Select the
best action the Transmission Owner System Operator should take the following



A. Respond to a directive from PJM to shed load to return flows below the Emergency rating

B. Continue to monitor the flows to ensure they don't exceed the Load Dump rating

C. Inform PJM that you have shed 5 MW of load to return flows below the Emergency rating

D. Immediately switch the 115 kV line out of service to alleviate the overload

A. Respond to a directive from PJM to shed load to return flows below the Emergency rating




B

Geschreven voor

Instelling
Electrical
Vak
Electrical

Documentinformatie

Geüpload op
25 mei 2026
Aantal pagina's
26
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

€17,66
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
dennohz2000 Teachme2-tutor
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
336
Lid sinds
2 jaar
Aantal volgers
47
Documenten
7417
Laatst verkocht
20 uur geleden

3,9

78 beoordelingen

5
43
4
10
3
11
2
4
1
10

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen