1. Which regulation requires viewing ports in containment, a master shut-off
switch at the entry door for all negative air units, and fire retardant poly?
a. SCAQMD Rule 1403
b. EPA-AHERA
c. Cal-OSHA T8,1529
d. None of the above - Correct Answer: d. None of the above
2. Which regulation names five removal procedures?
a. LA Fire Department Division 10
b. EPA-ASHARA
c. SCAQMD Rule 1403
d. 29 CFR 1926.1101 - Correct Answer: d. 29 CFR 1926.1101
3. Which regulation has several appendix sections, one of which consists of
non-mandatory work practices?
a. Cal-OSHA T8, CCR 1529
b. EPA-ASHARA
c. NESHAP
d. SCAQMD Rule 1403 - Correct Answer: a. Cal-OSHA T8, CCR 1529
,4. From which agency did the term asbestos-containing construction material
(ACCM) come from?
a. NESHAP
b. US EPA
c. 29 CFR 1926.1101
d. Cal-OSHA - Correct Answer: d. Cal-OSHA
5. What is the definition of asbestos-containing construction material (ACCM)?
a. > 1% and less than 2%
b. 1% or more
c. > 0.1%
d. None of the above - Correct Answer: c. > 0.1%
6. From which regulation does the term RACM (Regulated Asbestos Containing
Material) come from?
a. 29 CFR 1926,1101
b. 40 CFR Part 763, Subpart E
c. 40 CFR Part 61, Subpart M
d. T8, CCR 1529 - Correct Answer: c. 40 CFR Part 61, Subpart M
7. What is the definition of asbestos waste in California?
a. > 0.1%
b. 1% or more
c. > 1%
d. None of the above - Correct Answer: b. 1% or more
8. Class I work consists of working with
a. Transite and TSI
b. TSI and Floor Tiles
c. floor Tile and Roofing
, d. TSI and Surfacing Material - Correct Answer: d. TSI and Surfacing
Material
9. When can AHERA trained supervisor/competent person employed by a
state licensed asbestos removal contractor collect up to 12 bulk samples
according to State of California regulations?
a. At any time on an asbestos removal project
b. On a residential project after they have taken a building inspector
course
c. Only on a State of California CAC or CSST may collect samples
d. On a project less than 1,000 sq ft - Correct Answer: b. On a
residential project after they have taken a building inspector course
10.Which agency describes asbestos work as Class I, II III and IV?
a. SCAQMD (Rule 1403)
b. NESHAP
c. Cal-OSHA
d. AHERA - Correct Answer: c. Cal-OSHA
11.Class II work consists of working with
a. Surfacing materials
b. roofing materials
c. Thermal System Insulation (TSI)
d. all of the above - Correct Answer: b. roofing materials
12.Cal-OSHA has created specialty worker courses for which of the following
asbestos containing materials?
a. Asbestos cement (AC) pipe
b. Floor tile
c. Roofing
d. All of the above - Correct Answer: d. All of the above
, 13.For Class III work a trained person can remove small quantities of which of
the following materials?
a. TSI
b. Floor tile
c. Fireproofing
d. All of the above - Correct Answer: d. All of the above
14.Cal-OSHA (Title 8, 1529) states that when performing glove bag removal the
following is true:
a. Wetting is not required in the bag
b. One trained person may perform Class I glove bag removal
c. Air filtration in the glove bag is not required
d. All of the above - Correct Answer: d. All of the above
15.Define SCAQMD procedure 3:
a. Dry removal
b. Wet methods
c. Critical barriers, negative air filtration
d. Glove bag removal - Correct Answer: b. Wet methods
16.Define SCAQMD procedure 1:
a. Glove bag
b. Dry removal
c. Critical barriers, negative air filtration
d. Wet methods - Correct Answer: c. Critical barriers, negative air
filtration
17.SCAQMD Rule 1403 requires an asbestos survey prior to demolition in
which type of structures?
a. All commercial buildings