Questions And Correct Verified Answers
| Latest Update 2026 | Guaranteed Pass
| Already Graded A+ | Brand New
Version!!!!!!!
According to 29 CFR 1910.120, decontamination shall be performed in geographical areas that:
Are downwind of the Support Zone |
Are uphill from the Hotline |
Will minimize exposure of uncontaminated employees to contaminated employees |
All of the above | - CORRECTANSWER All of the above (Correct)
The responsibilities of a "buddy" at the hazardous waste site include:
Making sure coworker does his/her fair share of work |
Buy coworker a beer at the end of the work shift |
Periodically check PPE for damage |
None of the above | - CORRECTANSWER Periodically check PPE for damage (Correct)
The sequence of Level A PPE removal is boot covers/outer gloves, then...
,Boots, suit, backpack, facepiece, inner gloves |
Boots, suit, backpack, inner gloves, facepiece |
Suit, boots, backpack, facepiece, inner gloves |
Backpack, suit, boots, facepiece, inner gloves | - CORRECTANSWER Boots, suit, backpack,
facepiece, inner gloves (Correct)
The "hot line" is the outer boundary of the:
Exclusion Zone |
Contamination Reduction Zone |
Support Zone |
Cold Zone | - CORRECTANSWER Exclusion Zone (Correct)
The number of work zones typically found at a hazardous waste site is:
3|
4|
5|
None of these | - CORRECTANSWER 3
Workers who assist with the decontamination of entry personnel will always:
Wear Level A |
Wear respirators |
Wear the same level of PPE as those being decontaminated |
Wear PPE based on the hazard assessment | - CORRECTANSWER Wear PPE based on the hazard
assessment (Correct)
, A decon solution such as detergent is an example of a
neutralizing agent |
sterilizing agent |
surfactant |
solvent reagent - CORRECTANSWER surfactant (Correct)
According to 29 CFR 1910.120, decontamination shall be performed in geographical areas that:
Are downwind of the Support Zone |
Are uphill from the Hotline |
Will minimize exposure of uncontaminated employees to contaminated employees |
All of the above - CORRECTANSWER All of the above (Correct)
The sequence of Level C PPE removal is boot covers/outer gloves, then...
Boots, suit, respirator, inner gloves |
Boots, suit, inner gloves, respirator |
Suit, boots, inner gloves, respirator |
Respirator, suit, boots, inner gloves | - CORRECTANSWER Boots, suit, respirator, inner gloves
(Correct)
The effectiveness of decontamination procedures can be determined by:
Swipe testing |