Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

CON 3900 FINAL EXAM AND PRACTICE EXAM NEWEST 2026 TEST BANK|CON 3900 FINAL EXAM PREP WITH COMPLETE 300 REAL EXAM QUESTIONS AND CORRECT VERIFIED ANSWERS ALREADY GRADED A+ (MOST RECENT!!)

Beoordeling
-
Verkocht
-
Pagina's
92
Cijfer
A+
Geüpload op
09-06-2026
Geschreven in
2025/2026

Ace the CON 3900 Final Exam and Practice Exam with this comprehensive test bank featuring over 300 exam-style questions and detailed rationales. Covers essential construction management topics including contract types (lump sum, cost-plus, GMP, unit price), construction law (mechanic's liens, bonds, liquidated damages, Spearin doctrine), scheduling (CPM, PERT, Gantt, critical path, float, crashing), cost estimating (quantity takeoff, parametric estimates, contingencies, bid pricing), earned value management (CPI, SPI, EAC, TCPI), OSHA safety (fall protection, trenching, LOTO, competent person), construction materials (concrete, steel, masonry, wood), equipment productivity, quality control (NDT, LEED, BIM), and dispute resolution. Perfect for construction management students, contractors, and professionals preparing for final exams or certification.

Meer zien Lees minder
Instelling
CON 3900
Vak
CON 3900

Voorbeeld van de inhoud

CON 3900 FINAL EXAM AND PRACTICE EXAM NEWEST 2026
TEST BANK|CON 3900 FINAL EXAM PREP WITH COMPLETE 300
REAL EXAM QUESTIONS AND CORRECT VERIFIED ANSWERS
ALREADY GRADED A+ (MOST RECENT!!)


1. Which type of construction contract places the greatest risk on the owner?
A. Lump sum
B. Cost plus fixed fee
C. Guaranteed maximum price (GMP)
D. Unit price
-Correct Answer- Cost plus fixed fee


2. A construction contract where the contractor is paid for all allowable costs plus
a percentage of those costs is called:
A. Cost plus percentage of cost
B. Cost plus fixed fee
C. Time and materials
D. Unit price
-Correct Answer- Cost plus percentage of cost


3. Which contract type is most appropriate when the scope of work is well-
defined and changes are unlikely?
A. Lump sum
B. Cost plus
C. Time and materials

1

,D. Unit price
-Correct Answer- Lump sum


4. The document that defines the legal relationship between the owner and
contractor is the:
A. Construction agreement
B. General conditions
C. Specifications
D. Bill of quantities
-Correct Answer- Construction agreement


5. In a construction contract, "force majeure" refers to:
A. Deliberate delay by the contractor
B. Unforeseeable events beyond control (natural disasters, war)
C. Owner's right to terminate
D. Liquidated damages
-Correct Answer- Unforeseeable events beyond control (natural disasters, war)


6. A contractor fails to complete a project on time. The contract includes a clause
requiring payment of $500 per day for each day of delay. This is known as:
A. Consequential damages
B. Liquidated damages
C. Punitive damages
D. Nominal damages
-Correct Answer- Liquidated damages

2

,7. The legal principle that prevents a party from contradicting a previous act or
statement is called:
A. Estoppel
B. Indemnification
C. Subrogation
D. Accord and satisfaction
-Correct Answer- Estoppel


8. A mechanic's lien is filed by:
A. The owner against the contractor
B. A subcontractor or supplier who has not been paid
C. The bank financing the project
D. The architect
-Correct Answer- A subcontractor or supplier who has not been paid


9. The document that outlines the terms, conditions, and responsibilities of all
parties in a construction project is typically the:
A. General conditions
B. Special conditions
C. Supplementary conditions
D. Scope of work
-Correct Answer- General conditions




3

, 10. Which type of bond guarantees that the contractor will perform the work as
specified?
A. Payment bond
B. Performance bond
C. Bid bond
D. Maintenance bond
-Correct Answer- Performance bond


11. A bid bond ensures that:
A. The contractor will pay subcontractors
B. The contractor will enter into the contract if awarded
C. The owner will pay the contractor
D. The architect will complete drawings on time
-Correct Answer- The contractor will enter into the contract if awarded


12. When a contractor hires a subcontractor, the subcontractor is considered
a(n):
A. Agent of the owner
B. Independent contractor
C. Employee of the general contractor
D. Joint venturer
-Correct Answer- Independent contractor


13. The legal doctrine that holds a general contractor responsible for the safety of
all workers on site, including subcontractors, is called:


4

Geschreven voor

Instelling
CON 3900
Vak
CON 3900

Documentinformatie

Geüpload op
9 juni 2026
Aantal pagina's
92
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

€21,34
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
PrepMaster NURSING, ECONOMICS, MATHEMATICS, BIOLOGY, AND HISTORY MATERIALS BEST TUTORING, HOMEWORK HELP, EXAMS, TESTS, AND STUDY GUIDE MATERIALS WITH GUARANTEED A+ I am a dedicated medical practitioner with diverse knowledge in matters
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
233
Lid sinds
1 jaar
Aantal volgers
17
Documenten
2315
Laatst verkocht
8 uur geleden
ExamZen

A GOLD-TOP RATED SELLER ON STUVIA WITH WELL DETAILED AND VERIFIED STUDY DOCUMENTS ASSURED WITH EXCELLENT AND REMARKABLE RESULTS. Welcome to ExamZen, your go-to source for high-quality test banks and study materials designed to help you excel academically. We offer a comprehensive range of resources including test banks, study guides, solution manuals, and other study materials, all meticulously curated to ensure accuracy and effectiveness. Our affordable, instantly accessible materials are complemented by excellent customer support, making your learning experience seamless and efficient. Trust ExamZen to be your partner in academic success, providing the tools you need to achieve your educational goals.

Lees meer Lees minder
4,8

306 beoordelingen

5
265
4
29
3
3
2
2
1
7

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen