1. The law that set into place stormwater regulations in the 1970s is
Answer: The Clean Water Act
2. Regulations for managing stormwater activity on a construction site are
outlined in the
Answer: NPDES
3. When should you read and understand your project stormwater pollution
prevention plan
Answer: Immediately after the project awarded and before you begin any site work is
4. Which of the following is not an allowable stormwater discharge or
non-stormwater discharge
Answer: Discharges are contaminated groundwater
5. Construction activity may begin
, Answer: When the jurisdiction of operation specifies you can start
6. Waters that sell anti-degration standards are placed on the list
Answer: 303D
7. SWPP certifications are signed by
Answer: An oflcer of the project owner or an oflcer of the general contractor.
8. TRUE OR FALSE The document that must be completed signed and submit-
ted to the state to obtain authorization to discharge is the NOT
Answer: False
9. The notice of termination can be filed when
Answer: All construction inside and outside of the building is completed and the final stabilization
has been verified as complete
10. Operators on a construction site are the entity in charge of plans and
specifications and the entity who is
Answer: Is in charge of daily activities
11. You should have a SWPPP for your construction site because (3 reasons)
Answer: 1. Its documents stormwater management
2. Demonstrates your intent to manage stormwater on your site
3. It is required by law