Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Overig

Tech. & Operations Management- Project Management Lecture Notes, Reading List Book Summaries and Essay Plans

Beoordeling
-
Verkocht
-
Pagina's
20
Geüpload op
07-09-2021
Geschreven in
2021/2022

Detailed notes, including lecture notes, reading list book summaries and essay plans for the Oxford University FHS Technology & Operations Management course's section on Project Management (Week 8 of the course).

Instelling
Vak

Voorbeeld van de inhoud

Project Management

Definitions for Project Management- Maylor (2005)
 Project: "A unique set of coordinated activities, with definite starting and finishing
points, undertaken by an individual or organization, to meet specific performance
objectives within defined schedule, cost and performance parameters"(BS6079, 2000)
 Slack et al (2019): a set of activities with a defined start point & a defined end state,
which pursues a defined goal and sues a defined set of resources
 "A temporary endeavour undertaken to create a unique product or service" (PMI, 2000)
 A low-volume, high variety activity
 E.g. Westgate, dams, LHR, mega events (2012 London Olympics, Glastonbury)
 Project Management: the activity of defining, planning and executing projects of any
type.

Other Definitions in Project Management
 Schedule- result of transforming a project action plan into an operating timetable
 Activity- task that requires time & resources
 Event- end state
 Path- a serios of connected activities
 Network- map of arcs & nodes that describe the project

The Volume/ Variety Matrix




Mega Projects
 Cost over $1B/ £1B, take more than 5 years, change the way a large organisation or
state does something, any stakeholders involved
 Mega projects used to fight global challenges e.g. energy (power stations, renewables),
food & water (desalination, irrigation), population growth (infrastructure, housing),
health (COVID-19 Vaccination programme), etc
 Mega-projects characterised by
o Multiple strategic objectives
o Long-term planning horizons
o Novel, non-standard technology

, o High uncertainty in cost, benefit and risk forecasting
o Complex governance, contract and decision-making structures
o Project lock-in or capture at early stage
o Scope and ambition change over life-cycle
o Dynamic political and economic environment
o Multiple stakeholders with changing agendas
 Mega-project are complex due to:
o Technical elements: time dimensions, multiple stakeholders, complexity and
uncertainty, complex communication, projects are a technical network, not a
hierarchy
o Social elements: Conflicting, unclear or emergent goals, Organisational
leadership, Control or Commitment culture, Projects are a social network, not a
hierarchy, Experience periods of failure, Crises are normal

Historical development of PM
 Stage 1: Pre 1950s- no generally accepted or defined methods
 Stage 2: 1950s- one best way approach based on numerical methods established in the
US for large scale projects
 Stage 3: 1990s- A contingent approach based on strategy
 Stage 4: 2000s- projects as organisations

General Management Project Management
Responsible for managing the status quo Responsible for overseeing change
Authority defined by management Lines of authority are fuzzy
structure
Consistent set of tasks Ever changing set of tasks
Responsibility limited to own function Responsibility for cross-functional activities
Works in permanent organisational Operates within structures which exist for
structures the life of the project
Works in permanent organisational Predominantly concerned with innovation
structures
Tasks described as maintenance Main task is the resolution of conflict
Main task is optimisation Success determined by the achievement of
a stated goal
Success determined by achievement of Contains intrinsic uncertainties
interim targets
Limited set of variables
General Management vs Project Management

Project Management Structure Models
 All projects need a project manager- manage human resources
o People need clear understanding of their own roles
o Allocate different tasks
o Respond to rapid exchange of info between stakeholders

Project Development- Maylor (2003)

, Understanding the environment
Define the project- setting objectives, scope & strategy
 Conceptualisation, goal defintion, organisational strategy
 Generate explicit statement of needs and identifity what has to be provided to meet
these needs and whether it is feasible.

Design the project process- deciding how to execute the project
 Proposal, justification, agreement: show how needs met through project activites and
prepare and evaluate financial costs and benefits
 How will it be done? When can it start and finish?
 Planning process purposes:
o Determines the cost and duration of the project- Enables major
decisions to be made like whether to start project at all
o Determines level of resources needed
o Helps allocate work & monitor progress- who is responsible for what
o Helps assess impact of changes to project
 5 steps in planning progress:
o Identify activities in project
o Estimate times & resources for activities
o Identify relationship between activities
o Identify time & resource schedule constraints
o Fix schedule for time & resources
o The third stage of planning is understanding the interactions between
different project activities: Activities need to be executed in a particular
order are dependent on a series of relationships (others are
independent)

Deliver the project- performing the technical aspects of the project
 Start-up, execution, completion, handover: gather resources, assemble teams, carry out
defined tasks

Develop the process- reviewing
 Review, feedback: identify outcomes for all stakeholders and put in place improvements
to procedures, fall knowledge gaps

The basic approach of all scheduling techniques is to form an actual or implied network of
activity and event relationships that graphically portrays the sequential relations between
the tasks of a project

Geschreven voor

Instelling
Studie
Vak

Documentinformatie

Geüpload op
7 september 2021
Aantal pagina's
20
Geschreven in
2021/2022
Type
OVERIG
Persoon
Onbekend

Onderwerpen

€5,36
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
edoardocolao Oxford University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
100
Lid sinds
7 jaar
Aantal volgers
76
Documenten
4
Laatst verkocht
3 weken geleden

4,2

23 beoordelingen

5
13
4
6
3
1
2
1
1
2

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen