Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

MANAGEMENT STRATEGIC SAFe 5.0 Quiz with Best Solutions NEW

Beoordeling
-
Verkocht
-
Pagina's
47
Cijfer
A+
Geüpload op
03-10-2022
Geschreven in
2022/2023

MANAGEMENT STRATEGIC SAFe 5.0 Quiz with Best Solutions NEW

Instelling
Vak

Voorbeeld van de inhoud

1. What type of objectives are used to identify work that can be
variable within the scope of a PI?
Uncommitted objectives are used to identify work that can be variable within the scope of a PI. The work
is planned, but the outcome is simply not certain. Teams can apply uncommitted objectives whenever
there is low confidence in meeting the objective.

2. What is one new SAFe 5.0 tool used to express Strategic Themes?
Objectives and key results

3. In what situation would a team use uncommitted objectives?
The team has a dependency on an external contractor who has been unreliable in the past

4. Built-in Quality is a dimension of Team and Technical Agility and
what else?
A SAFe Core Value

5. In SAFe's CALMR approach to DevOps, what does the "R"
represent?
Recovery

6. What is the foundation the customer-centric enterprise?
Market and user research

7. Why was the Dev Team removed from SAFe 5.0?
To better relate to business teams

8. When should Continuous Exploration activities take place?
Every iteration

9. Which of the seven core competencies addresses the other
solutions that are necessary to deliver complete enterprise value?
Lean Portfolio Management

10. Which Continuous Delivery Pipeline event(s) should happen
every Iteration?
Continuous Exploration, Continuous Integration, and Continuous Deployment

11. Which tool or process supports customer centricity?
Design thinking

, 12. Which backlog contains user stories a team may be working
on?
The Team Backlog




13. The Product Owner is involved in which activity?
ART sync

14. When is the System Demo conducted during Program
Execution?
At the end of every iteration

, 15. What do Burn-up charts show in the Iteration progress?

Planned Vs Actual

16. In SAFe®, which two items belong in the Team Backlog?
(Choose two.)
1. user / enabler Stories 2. Spikes
17. What does SAFe Principle #3, "Assume variability; preserve
options," enable?
Better economic results

18. What is the primary purpose of Strategic Themes?
Connect the portfolio to the enterprise business strategy

19. An Epic spanning two PIs was approved for implementation. What
is the optimum implementation path from a Lean-Agile
perspective?
Demonstrate the progress to key stakeholders after first PI and make a decision how to proceed with the
Epic in the second PI

20. What is the primary goal of decentralized decision-making?
Minimize work-in-progress

21. Which statement is most accurate about the Program Vision?
It expresses the strategic intent of the Program

22. What is the connection between feedback and optimum
batch size?
Lack of feedback contributes to higher holding cost

23. What are two goals of the Feature section of the Program
Kanban? (Choose two.)
Facilitate Feature readiness

Visualize the state of each feature

Which statement is true about Model-Based Systems Engineering (MBSE)
in SAFe?
MBSE allows a team to explore solution options earlier

What are two reasons organizational leaders should “take a systems
view”? (Choose two.)

, To optimize the system as a whole

Because some systemic changes that could dramatically improve teams' environments can only be made
by the leaders

Which three statements are true about the role of Lean-Agile Leaders?
(Choose three.)
They lead by example

They lead the change

They exemplify the lean-agile mindset, values, and principles

Communities of Practice best solve which problem in a Lean-Agile
Enterprise?
Optimizing by cross-functional teams

Which two areas do Capabilities live in the SAFe Requirements Model?
(Choose two.)
Under Epics

Above Features

Which three roles are most responsible for ensuring successful execution
at the Large Solution Level? (Choose three.)
Solution Train Engineer

Solution Management

Solution architect/Engineer

What do Work-in-Process constraints create?
Forced capacity matching

Which role accepts Capabilities as done?
Solution Management

What is a SAFe-recommended approach to implement a crosscutting
Epic that spans multiple PIs?
All agile release trains and solution trains demonstrate their work with respect to the epic at every PI
boundary

What is the goal of Lean?
sustainable shortest lead time, best quality, and value

Geschreven voor

Vak

Documentinformatie

Geüpload op
3 oktober 2022
Aantal pagina's
47
Geschreven in
2022/2023
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

€22,43
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Ethanhope Chamberlain College Of Nursng
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
99
Lid sinds
5 jaar
Aantal volgers
97
Documenten
2789
Laatst verkocht
11 maanden geleden

4,4

20 beoordelingen

5
15
4
2
3
0
2
1
1
2

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen