Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

CIV1298 - Introduction to Construction Claims Quiz 1

Beoordeling
-
Verkocht
-
Pagina's
344
Cijfer
A
Geüpload op
24-03-2023
Geschreven in
2022/2023

Exam of 344 pages for the course CIV1298 - Introduction to Construction Claims at U of T (In-class quiz 1)

Instelling
Vak

Voorbeeld van de inhoud

Question 1
What is the traditional project delivery method commonly referred to as?
O Public-Private Partnership
O Design-Build
O TurnKey
O Design-Bid-Build

Question 2
What are the potential disadvantages of the traditional project delivery method compared to
Design-Build?
O All of the above
O Greater risk for the owner
O Slower progress due to separation of design and construction teams
O More costly to initiate

Question 3
According to the RICS (Royal Institution of Chartered Surveyors) Contracts in Use Survey from
2007, what percentage of building projects in the UK use a standard form of contract?
0 50%
0 100%
0 75%
0 25%

,Question 4
What is a consistent element across the globe for successful and early resolution of disputes
according to the Arcadis Global Construction Disputes Report 2022?
O All of the above
O Use of party-to-party negotiation
O Parties' willingness to compromise
O Proper administration of the contract




Question 5
Among the following, which is the most common cause of disputes in construction projects?
O Supply chain issues
O Parties' failure to understand their contractual obligations
O COVID-19 impacts
O Inflationary pressures
According to Arcadis 2022 Global Construction Dispute Report - Successfully Navigating
Through Turbulent, the author said ‘over the past 12 years of gathering insights and capturing
dispute trends, two of the leading causes of disputes still revolve around the parties’ failure to
understand their contractual obligations and poorly drafted or unsubstantiated cliams.

Question 6
What trend was seen in the average length of time for a dispute to be resolved in 2012?
O Disputes are taking longer to resolve
O Disputes are resolving faster
O Disputes are resolving at the same pace

,Question 7
What is the most common problem relating to the Project Manager or Engineer that became a
material influence in disputes?
O Difficulty in understanding the contract
O Lack of training
O Being too partial to the Owner's interests
O Deficient communication skills




Question 8
What is emphasized as the key approach to dealing with construction disputes?
O Quick resolution
O Hire claim experts
O Increasing the authority of the Project Manager or Engineer
O Avoiding disputes altogether

, Question 9
What is the role of the Project Manager or Engineer in disputes?
O They are often at the heart of the problem
O They are always impartial in disputes
O They are the main cause of disputes
O They are rarely involved in disputes




Question 10
Public-Private Partnership is referred to by Infrastructure Ontario as:
____P3, AFP prior to Nov 2018____ Alternative Financing and Procurement

Question 11
What was the average value of disputes in North America in 2021?
O US$52.6 million
O US$37.9 million
O US$54.3 million
O US$30.1 million




Question 12
Which contract is used for the Construction Management At-Risk project delivery system?
O CCDC 5A
O CCDC 30
O CCDC 5B

Geschreven voor

Instelling
Studie
Vak

Documentinformatie

Geüpload op
24 maart 2023
Aantal pagina's
344
Geschreven in
2022/2023
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

€12,74
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper
Seller avatar
xxxxxx1

Maak kennis met de verkoper

Seller avatar
xxxxxx1 University of Toronto
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
3
Lid sinds
3 jaar
Aantal volgers
2
Documenten
44
Laatst verkocht
10 maanden geleden

0,0

0 beoordelingen

5
0
4
0
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen