Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

GFEBS L230E Cost Management Process Overview

Beoordeling
-
Verkocht
-
Pagina's
11
Cijfer
A+
Geüpload op
07-07-2023
Geschreven in
2022/2023

GFEBS L230E Cost Management Process Overview 1. Direct Cost: A cost such as labor, materials, or supplies that can be traced directly to producing a specific output of an organization, product, and service 2. Indirect Cost: A cost that cannot be traced directly to a specific organization, product, and/or service output They often are allocated on a predetermined basis and generally are synonymous with overhead costs such as general and adminis- trative expenses. 3. Funded Cost: The value of goods or services received because of an obligation of funds by the organization performing the work 4. Unfunded Cost: A cost that is financed by another organization's or activity's appropriations. 5. Variable cost: A cost that changes with a change in output 6. fixed cost: A cost that remains the same regardless of a change in output 7. sunk cost: A cost incurred in the past that will not be affected by any present or future decision 8. incremental cost: The increase or decrease in cost that would result from a decision to increase or decrease output levels 9. avoidable cost: A cost incurred on an object that will no longer be incurred due to a decision to change the output. 10. unavoidable cost: A cost incurred on an object that will be incurred regardless of the decision to change 11. Activity Type: An Activity Type is the cost master data that represents a group of resources within a Cost Center. These resource groups have capacity and a unit of measure such as: labor hours, machine hours, square footage, etc. Activity Types are used to produce the products and services of the organization. 12. Cost Center: A Cost Center is a responsibility center on which costs are incurred. It has an operational manager who is accountable for the resources consumed to produce the cost center's output. 13. Project: A Project is an object used to plan, collect, monitor, and control costs for large scale time-based events in Project Systems, when extensive scheduling and resource management capabilities are required. Projects have definite start and end dates 14. WBS: A WBS element is an activity within the Project used to plan and update cost data. Some examples of WBS Elements are: tasks, partial tasks, and work packages

Meer zien Lees minder
Instelling
Vak

Voorbeeld van de inhoud

GFEBS L230E Cost Management Process Overview


1. Direct Cost: A cost such as labor, materials, or supplies that can
be traced directly to producing a specific output of an organization,
product, and service

2. Indirect Cost: A cost that cannot be traced directly to a specific
organization, product, and/or service output They often are allocated
on a predetermined basis and generally are synonymous with
overhead costs such as general and adminis- trative expenses.

3. Funded Cost: The value of goods or services received because of an
obligation of funds by the organization performing the work

4. Unfunded Cost: A cost that is financed by another organization's or
activity's appropriations.

5. Variable cost: A cost that changes with a change in output

6. fixed cost: A cost that remains the same regardless of a change in
output

7. sunk cost: A cost incurred in the past that will not be affected by
any present or future decision

8. incremental cost: The increase or decrease in cost that would result
from a decision to increase or decrease output levels

9. avoidable cost: A cost incurred on an object that will no longer be
1/

, incurred due to a decision to change the output.

10.unavoidable cost: A cost incurred on an object that will be incurred
regardless of the decision to change

11.Activity Type: An Activity Type is the cost master data that
represents a group of resources within a Cost Center. These resource
groups have capacity and a unit of measure such as: labor hours,
machine hours, square footage, etc. Activity Types are used to
produce the products and services of the organization.

12.Cost Center: A Cost Center is a responsibility center on which
costs are incurred. It has an operational manager who is
accountable for the resources consumed to produce the cost
center's output.

13.Project: A Project is an object used to plan, collect, monitor, and
control costs for large scale time-based events in Project Systems,
when extensive scheduling and resource management capabilities are
required. Projects have definite start and end dates

14.WBS: A WBS element is an activity within the Project used to plan
and update cost data. Some examples of WBS Elements are: tasks,
partial tasks, and work packages




2/

Geschreven voor

Vak

Documentinformatie

Geüpload op
7 juli 2023
Aantal pagina's
11
Geschreven in
2022/2023
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

€4,78
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper
Seller avatar
PROFICIENTTUTOR

Maak kennis met de verkoper

Seller avatar
PROFICIENTTUTOR New York University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
1
Lid sinds
2 jaar
Aantal volgers
0
Documenten
577
Laatst verkocht
1 jaar geleden

0,0

0 beoordelingen

5
0
4
0
3
0
2
0
1
0

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen