Learning Objectives 1. Describe the process to create a project schedule. 2. Define activities based on Work Breakdown Structure (WBS). 3. Describe how activities can be sequenced. 4. Elaborate on the techniques to estimate activity duration. 5. Create a network diagram by identifying the early start and early finish times, late start and late finish times, floats (slacks), and the critical path. 6. Practice on Microsoft Project to create a Gantt Chart and an Activity Network Diagram.

Meer zien Lees minder
Instelling
Vak

Voorbeeld van de inhoud

Project Management




Chapter 7. Scheduling

,7.0 Learning Objectives & Overview



Learning Objectives

1. Describe the process to create a project schedule.
2. Define activities based on Work Breakdown Structure (WBS).
3. Describe how activities can be sequenced.
4. Elaborate on the techniques to estimate activity duration.
5. Create a network diagram by identifying the early start and early finish times, late
start and late finish times, floats (slacks), and the critical path.
6. Practice on Microsoft Project to create a Gantt Chart and an Activity Network
Diagram.




Overview

The project schedule is one of the triple project constraints besides scope and cost (budget). A project
manager is responsible for planning, developing, managing, monitoring, and controlling the project
schedule to ensure that project objectives can be achieved, and project outcomes can be delivered to
the client and customers on time. Effective schedule management is integral to overall project success.
The objective is to create a schedule that effectively and efficiently uses allocated resources to complete
the project in the shortest amount of time possible. In order to develop a schedule, we first need to
create a plan that will guide us during the project. Afterward, we should define the activities based on
the WBS, sequence them in the right order, estimate the time it will take to complete these activities,
and develop a schedule by creating a network diagram and Gantt chart.




182

, Project Management



7.1 Project Schedule Management Plan



As described in Chapter 4, project planning is at the heart of the project life cycle and tells everyone
involved where we are going and how we are going to get there. It involves creating a set of plans to
help guide our team through the implementation and closure phases of the project. The project
schedule management plan is one of the sub-plans of our overall project plan. It provides the guidelines
to project managers on how to develop a project schedule by defining and sequencing project activities
and milestones, and by estimating activity durations. It is the process of establishing the policies,
procedures, and documentation for planning, developing, managing, executing, and controlling the
project schedule.

A project schedule management plan can consist of the following:

Unit of measurement

Work hours, days, weeks, months
Daily working hours and shifts
Weekends and/or off-days
Local, national, and federal holidays
Creation of the activity list and attributes

Describe how activities and their attributes will be defined, and who will be involved in
this process.
Level of accuracy

Acceptable range to ensure realistic activity duration estimates
Evaluation of the impact of risks on the overall project duration and each individual
activity durations based on the project risk management plan
Methods describing how the schedule contingencies will be assessed.
Activity duration estimates

Estimation methods (e.g., analogous, parametric, three-point, bottom-up)
Methods, tools, and software utilized to develop, manage, and monitor project
schedule
Specify the organization’s procedures, policies, and resource calendars if they should
be utilized.
Methods and tools such as Gantt Chart, WBS, project baseline, master and milestone
schedule, Earned Value Management, and critical path method
Software such as Microsoft Project Professional, Excel, Visio, and Jira (for Kanban and
Scrum), and online collaboration tools such as Monday, Trello, and Basecamp.
Rules and concepts to sequence activities and create an activity network diagram

183

, Project Management

Critical path method (Forward pass, backward pass, slacks)
Critical chain method
Predecessor dependencies (e.g., finish-to-start, start-to-start)
Rules for monitoring schedule performance

Earned Value Management (EVM)
Control thresholds for deviations from the parameters in the schedule baseline
Using software such as Microsoft Project
Reporting formats

Reporting formats and frequency should be in alignment with other project plans.
Approval of the schedule baseline

Who will be responsible for preparation and control?
Who will approve the schedule baseline?

Project Management Institute. (2017). A guide to the Project Management Body of Knowledge (PMBOK
guide) (6th ed.). Project Management Institute.




184

Geschreven voor

Vak

Documentinformatie

Geüpload op
26 augustus 2023
Aantal pagina's
38
Geschreven in
2023/2024
Type
SAMENVATTING

Onderwerpen

€4,86
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper
Seller avatar
criseldamercado981

Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
criseldamercado981 Don Honorio Ventura State University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
-
Lid sinds
2 jaar
Aantal volgers
0
Documenten
21
Laatst verkocht
-

0,0

0 beoordelingen

5
0
4
0
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen