Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

Test Bank For Performance Management 5th Edition by Herman Aguinis. Isbn. 9781948426480, 9781948426497.

Beoordeling
-
Verkocht
2
Pagina's
165
Cijfer
A+
Geüpload op
17-04-2024
Geschreven in
2022/2023

Test Bank Performance Management 5th Edition by Herman Aguinis. Isbn. 9781948426480, 9781948426497. Aguinis 5e test bank; Performance Management Aguinis 5th Edition Test Bank. Test Bank for Performance Management, 5th Edition Herman Aguinis Test Bank for Performance Management, Fifth Edition Herman Aguinis CONTENTS-= 1 Performance in Context 2 Performance Management Process 3 Performance Management and Strategic Planning 4 Defining Performance and Choosing a Measurement Approach 5 Measuring Results and Behaviors 6 Performance Analytics 7 Rolling Out the Performance Management System 8 Performance Management and Employee Development 9 Performance Management Leadership 10 Perfromance Management, Rewards, and the Law 11 Team Performance Management

Meer zien Lees minder
Instelling
Program Management
Vak
Program Management

Voorbeeld van de inhoud

TEST BANK Performance Management 5th Edition Herman Aguinis

Chapter 1—Performance Management and Reward Systems in Context

True/False Questions

1.1 A performance management system is the systematic description of an employee’s
strengths and weaknesses.
(Suggested points: 2, [1.1]); Pg. 3
LO: 1
Answer:
False. Performance management is a continuous process of identifying, measuring,
and developing the performance of individuals and teams and aligning
performance with the strategic goals of the organization


1.2 Linking the organization’s goals to individual and team goals helps reinforce
behaviors that will help with organizational goal achievement and communicates
the most crucial business initiatives.
(Suggested points: 2, [1.2]); Pg. 5
LO: 2
Answer:
True

1.3 Feedback can increase motivation to perform when it points out how an employee
is performing and acknowledges past successes.
(Suggested points: 2, [1.3]); Pg. 9
LO: 3
Answer:
True

1.4 Dangers of a poorly implemented performance management system include
wasted time and money, lack of standardized employee ratings, and confusion on
how ratings are obtained.
(Suggested points: 2, [1.4]); Pg. 14-15
LO: 4
Answer:
True

1.5 A performance management system helps encourage employees to speak up and
offer innovative ideas.
(Suggested points: 2, [1.3]); Pg. 10
LO: 3
Answer:
True

1.6 Unfair performance ratings are the main problem with performance management
systems.

, (Suggested points: 2, [1.4]); Pg. 15-16
LO: 5
Answer:
False. Performance ratings are the “canary in the coal mine” and indicators of
problems with the PM system

1.7 Reliability and validity of performance management systems refer to the same
thing.
(Suggested points: 2, [1.5]); Pg. 19
LO: 6
Answer:
False. Reliability refers to consistency and freedom from error, while Validity
refers to the fact that the measures include all relevant performance facets and do
not include irrelevant information.

1.8 The strategic purpose of PM systems involves constructing the strategic vision for
the organization.
(Suggested points: 2, [1.5]); Pg. 5
LO: 2
Answer:
False. The strategic purpose of PM systems is to link an organization’s goals with
individuals’ goals.

1.9 A reliable performance management system includes all relevant performance
facets and does not include irrelevant performance facets.
(Suggested points: 2, [1.5]); Pg. 19
LO: 6
Answer:
False. This describes a system’s validity, not reliability. A reliable performance
management system is consistent. For example, if two supervisors provided ratings
of the same employee, or if one supervisor rated the same employee twice over a
short period of time during which nothing noticeable occurs, then the ratings
should be similar or identical.

1.10 Distributive justice is the perception that the performance evaluation received is
fair relative to the work performed.
(Suggested points: 2, [1.5]); Pg. 20
LO: 6
Answer:
True

1.11 Performance management systems in foreign subsidiaries often differ from those
in home country headquarters as differences in the power distance (i.e., the degree
to which a society accepts unequal distribution of power) increase between/among
countries.

, (Suggested points: 2, [1.5]); Pg. 18
LO: 6
Answer:
True

1.12 The current consensus amongst most employees (as reported by the CEB) is that
performance review systems are helpful in improving their productivity.
(Suggested points: 2, [1.1]); Pg. 4
LO: 1
Answer:
False. 66% of employees feel that the performance review process interferes with
their productivity.

1.13 Poorly implemented performance management systems have little to no negative
legal ramifications for the organization.
(Suggested points: 2, [1.4]); Pg. 14-15
LO: 4
Answer:
False. Poorly implemented performance management systems are likely to result in
negative legal ramifications such as possible discrimination lawsuits.

1.14 Many large companies such as General Electric, Deloitte, and Adobe no longer use
performance ratings at all.
(Suggested points: 2, [1.4]); Pg. 16-17
LO: 1
Answer:
False. Many large companies who tried to eliminate performance ratings are now
using ratings again—but they are using more than one system and emphasizing
developmental feedback.

Multiple-Choice Questions

1.15 ________________ is a continuous process of identifying, measuring, and
developing the performance of individuals and teams and aligning performance
with the strategic goals of the organization.
A. Strategic planning
B. Performance management
C. Reward system
D. Performance appraisal
(Suggested points: 2, [1.1]); Pg. 3
LO: 1
Answer: B

1.16 Dangers of a poorly implemented performance management system include all of
the following EXCEPT:
A. Increased emphasis on behaviors rather than results

, B. Lawsuits/internal complaints of discrimination
C. Biased performance ratings
D. Decreased employee motivation
(Suggested points: 2, [1.4]); Pg. 14-15
LO: 4
Answer: A

1.17 When employees of an organization do not see the PM system as fair, the
organization may witness from its employees all of the following EXCEPT:
A. Job burnout
B. Lowered self-esteem
C. Increased engagement
D. Lawsuits
(Suggested points: 2, [1.4]); Pg. 16
LO: 4
Answer: C

1.18 The meaningfulness characteristic of performance management systems includes
all the following EXCEPT:
A. Standards and evaluations are important and relevant
B. All functions that an employee performs are evaluated
C. System should evaluate performance regularly
D. Evaluator skill should be developed continuously
(Suggested points: 2, [1.5]); Pg. 19
LO: 6
Answer: B

1.19 The ___________ purpose of PM systems is to furnish valid and useful
information for making employment decisions including salary adjustments,
promotions, and terminations.
A. strategic
B. informational
C. administrative
D. developmental
(Suggested points: 2, [1.2]); Pg. 6
LO: 2
Answer: C

1.20 Information gained from the organizational maintenance purpose of a PM system
is used for all of the following EXCEPT:
A. Workforce planning
B. Creating job descriptions
C. Evaluating the effectiveness of HR interventions
D. Creating talent inventories
(Suggested points: 2, [1.2]); Pg. 7

Geschreven voor

Instelling
Program Management
Vak
Program Management

Documentinformatie

Geüpload op
17 april 2024
Aantal pagina's
165
Geschreven in
2022/2023
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

€26,94
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
docusity Nyc Uni
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
1571
Lid sinds
2 jaar
Aantal volgers
137
Documenten
1425
Laatst verkocht
8 uur geleden

4,4

262 beoordelingen

5
179
4
42
3
24
2
5
1
12

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen