Summary of all Project Management lectures in the course Financial & Project Management. This course will be given in year 2 of Human Resource Studies (Personeelwetenschappen/People management), Organization studies (Organisatiewetenschappen), and Global Management of Social Issues (GMSI). In this summary, all lectures about the topics of Project Management (PM) are covered. Including example questions and answers, explanations for answers, images, etc. Everything from the lecture slides is included in this summary, so you don't need to study those slides apart from this summary.

Meer zien Lees minder

Voorbeeld van de inhoud

Introducton to Project tnd Project Mtntgement
Lecture 1
Whtt i t Project?
A project i t pltnned temportry endetvour underttken to crette t unique product or ervice or other
complete tnd defnite outcome (delivertble) within t limited tme ctle tnd budget.

 Temportry – Defnite beginning tnd end tnd i u utlly divided into pht e .
 Unique – Diferent in ome di tngui hing wty e.g. delivertble provided, ttkeholder infuence ,
re ource u ed, con trtint tnd/or the wty proce e tre ttilored to provide delivertble .

Current Sttte of Project Performtnce
Whtt do you think i the current ttte of project performtnce globtlly?
Why do you think o?

The High Incidence of Project ftilure
A urvey of 438 project worker revetled:
Schedule performtnce (tme) on lt t performtnce:
 Seriou chedule lipptge: 35%
 Mode t chedule lipptge: 34%
 On ttrget: 22%
 Mode tly thetd of chedule: 8%
 Drtmttctlly thetd of chedule: 1%

Co t performtnce on lt t project:
 Seriou co t overrun: 17%
 Mode t co t overrun: 38%
 On ttrget: 27%
 Mode t co t tving : 12%
 Mtjor co t tving : 6%

Meetng of pecifctton on lt t project:
 Fell hort: 29%
 Met the pecifctton: 51%
 Performed beter thtn required: 20%

When you look tt pecifctton on the project:
 Why doe the pecifctton ptrt look diferent tnd beter thtn the tme tnd co t performtnce heet?

Why tre we tctutlly doing project ? And why tre you here in the lecture?
 It i cletr thtt in mtny ct e the pecifctton come fr t, but thi i not tlwty the ct e.
 But for extmple, tme i con idered very importtnt within project . To retch tn objectve, you need t
certtin tme- ptn. To tudy for your extm, tme i very importtnt.

When you ‘plty the btll’ to Time, you htve to tck to the tme.
When you ‘plty the btll’ to Specifctton, you focu on the pecifctton.
When you ‘plty the btll’ to the Co t , you htve to tty within the budget.

Specifctton i mo t of the tme the fr t priority, tnd ometme the econd priority.

,Why do project ftil?
Sttndtrd ource of ftilure:
 Orgtni ttontl i ue (attitudes, pracaicies, aid stcuituce);
Interntlly tnd tround the orgtniztton t well. It infuence the project.
It i mo tly not the project mtntgement’ ftult.

- Attitudes ht to do with power tnd politc within orgtniztton .
For extmple: ltunch or not to ltunch? Within the orgtniztton thi topic wt di cu ed.
Eventutlly, it wt decided to ltunch tnd it tppetred thtt due to t technictl ftilure, the
ltunch ctu ed t di t ter. But tctutlly, it wt not t technictl ftilure, but the ftilure of
project mtntgement bectu e they decided to ltunch (thtt wt the ftult they mtde) due
to diference in tttude .
- Pcaicies: the wty thtt the comptny i tructured tnd the wty thtt prtctce tnd
proce e tre formed. Prtctce thtt detl with the functontl tret of the comptny.
When you’re going to buy t pen ( ti) through the normtl chtnnel ; it ttke you 30
minute to go tnd buy t pen tt Albert Heijn for 2 euro .
- Stcuituce: ltrge orgtniztton tre divided in functontl tret ; tll the e diferent people
htve to work together. Thi mty ftil.

 Poor identfctton tnd mtntgement of need tnd requirement .
One of the mo t importtnt t pect in the beginning of t project.
Thi i expltined by drtwing t picture during the lecture on the white botrd

 Poor pltnning tnd control.
Pltnning technique tnd proce e ; during t project for extmple.
It detl with mtny pltnning t pect .

Some extmple :
The Sydney Opert Hou e (Au trtlit)
Need identfed in 1950

E tmtton in 1957
 Co t: 7 million Au trtlitn Dolltr
 Completon: 1963 (Jtn)

Actutl:
 Co t: 102 million Au trtlitn Dolltr
 Completon: 1973 (Oct)

Qutlity:
 To prevent further e ctltton the interntl de ign htd to be chtnged in uch t wty thtt it would not
fulfl it origintl purpo e t tn opert hou e.
 The building wt opened without ctr ptrking.
 Building very ltbour inten ive (running co t for fr t yetr: 6 million Au trtlitn dolltr )

Succe /Ftilure
 Sydney’ how ct e (Equivtlent to Eifel Tower tnd Empire Sttte Building)

,The Moztl Aluminium Smelter
Budget: 1.3 Billion dolltr

Ri k :
 One of poore t countrie in the world
 Ridden by food , mtltrit & HIV/AIDS
 Ab ence of rotd
 Sttbility of government; legtl problem
 Ltck of commercitl infrt tructure tnd logi tc problem
 Conditon of living for the multnttontl project tetm
 Loctl ltbour (Union , ltngutge, ltck of kill , etc.)

Succe /Ftilure:
 Internttontl project of the yetr 2001, Americtn PMI
 Completed 100 million dolltr below budget
 Commi ioned ix month thetd of chedule
 Meet tll pecifed requirement




Vtlue Cretton Frtmework




 From t comptny’ per pectve, there i t strategy thtt the comptny follow .
 The trttegy i identfed into diferent components or tl o ctlled investments.
 Inve tment become projects; there i t ocitl re pon ibility to perform.
 Ultmttely, the contributon letd to benefits.

Change mechanism: from one po iton to t new po iton ( ee tbove).

, PBO Vtlue Chtin




 Crette vtlue to cu tomer by doing project .
 Frontend Loading (Pre & Feasibility): you look tt the be t opton ; which project will htve the highe t
return on inve tment?

Project Start: when the project i mtndtted.
Project End: Project delivertble htve been tccepted or if project ht been premtturely termintted, therefore
tll project documenttton i delivered tnd tll clo ure tctvite htve been completed.

When t project i premtturely termintted, not tll ttge would htve to be included. Plet e keep thtt in mind.

Project Priority Mttrix




Keep in mind, one of them will be con trtint (fxed), one will be enhtnced (optmi ed), tnd one will be
tccepted (trtde-of).

Quality will probtbly be the fr t priority, or the econd.

Documentinformatie

Geüpload op
31 januari 2019
Aantal pagina's
61
Geschreven in
2017/2018
Type
SAMENVATTING

Onderwerpen

€6,99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF


Ook beschikbaar in voordeelbundel

Thumbnail
Voordeelbundel
Summaries Financial & Project Management | Bachelor Personeelwetenschappen & Bachelor Organisatiewetenschappen
-
2 2 2021
€ 11,48 Meer info

Beoordelingen van geverifieerde kopers

Alle reviews worden weergegeven
7 jaar geleden

4,0

1 beoordelingen

5
0
4
1
3
0
2
0
1
0
Betrouwbare reviews op Stuvia

Alle beoordelingen zijn geschreven door echte Stuvia-gebruikers na geverifieerde aankopen.

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
sophievandendungen Tilburg University
Bekijk profiel
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
148
Lid sinds
9 jaar
Aantal volgers
96
Documenten
9
Laatst verkocht
1 jaar geleden

3,8

30 beoordelingen

5
5
4
17
3
5
2
2
1
1

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen