Journeyman Oil Maine Fuel Board Rules Exam Questions with Correct Answers
Journeyman Oil Maine Fuel Board Rules Exam Questions with Correct Answers What must you do if you notice code violations in a homeowners house? - AnswerNotify them and recommend ways to address them What must be done when performing an annual tune-up on a heating system? - Answer-A combustion efficiency test and a copy must be posted on site Whenever a furnace, direct fired hot water heater, or boiler is installed the total installation must be brought into compliance with what requirements BEFORE appliance can be fired? - Answer-NFPA 31 When an emergency arises that does not allow adequate time to get a chimney lined/and or repaired before installing the new heating appliance the licensee may defer the required repairs for how long? - Answer-90 days What must be performed before a new installation? - Answer-A heat loss system design and load calculation. A copy must be retained to be presented upon request of board inspector All oil fired BOILERS must be provided with a properly installed and operating what? - Answer-Low Water cut off Where shall a low water cutoff be installed? - Answer-At the level recommended by the manufacture, but in no case below the crown sheet If the low water cut off is not installed directly in the boiler where may it be installed? - Answer-Main supply line (vertical riser) as close to boiler as possible, or in a water column of continuous piping attached directly to the boiler A listed lever or wheel thermally operated oil shut off valve must be installed where? - Answer-At the burner and the oil supply tank
Geschreven voor
- Instelling
- Journeyman Oil Maine
- Vak
- Journeyman Oil Maine
Documentinformatie
- Geüpload op
- 25 mei 2024
- Aantal pagina's
- 14
- Geschreven in
- 2023/2024
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
journeyman oil maine f
-
journeyman oil maine fuel board rules
-
journeyman oil maine fuel board rules exam